ENCLOSURE
U.S.
NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No. '0-410/81-04 Docket No.
50-410 License No.
CPPR-112 Priority Category
Licensee:
Niaaara Mohawk Power Cor oration 300 Erie 8oulevard IrIIest S racuse New York 13202 Facility Name:
Nine Mile Point Nuclear Power Station Unit 2 Inspection at:
Scriba, New York Inspection conducted:
pr i ZZ, 1981 Inspectors:
~R. Feil, Reactor Inspector w >~= F(
date signed B.
ister, Chief, Reactor Projects Section 1C, DR&PI d
esined Approved by:
8 unner, Acting Director, Division of Resident and Project Inspection date signed M~iS Meetin on Aoril 2Z "1981 Re ort No. 50-410/81-04
~Sco e:
Special announced management meeting to discuss the results of the HRC board convened to evaluate the Licensee'
Per formance from February 1,
1981 to
~ January 31, 1981 as part of the NRC's Systematic Assessment of Licensee Perform-ance (SALP) Program.
Areas addressed included:
guality Assurance, Substructure and Foundations, Concrete, Liner (Containment and Others),
Safety-Related Structures, Piping and Hangers, Safety-Related Components, Electrical Equipment Electrical (Tray and Mire), Instrumentation, Fire Protection, Preservice Inspec-tion, Reporting, Environmental, Training and Management.
Results:
A summary of the licensee performance evaluation was presented.
No new enforcement actions were identified.
>>o60so 389
DETAILS 1.
Licensee Attendees W.
M. Bryant, Manager - Quality Assurance T.
E.
Lempges, Vice Pr'esident, Nuclear Generation S.
F. Manno, Project Manager Unit 2 D.
R. Palmer, Supervisor, Quality Assurance - Operations T. J. Perkins, General Superintendent - Nuclear Generation G.
K. Rhode, Vice President - System Project Management, T.
W.
Roman, Station Superintendent - Unit
W. Rumberger, Assistant Project Manager - Operations, Unit 2 R.
W. Smith, Superintendent - Production, Unit 2 2.
NRC Attendees B.
H. Grier, Director, OIE, Region I E. J. Brunner, Acting Director, Division of Resident and Project Inspection, Region I H.
B. Kister, Chief, Reactor Projects Section 1C, DR@PI S.
D; Hudson, Senior Resident Inspector, Unit
R. A. Feil, Reactor Inspector, Reactor Projects Section 1C, DR&PI 3.
Discussion A brief summary of the Systemtic Assessment of Licensee Performance (SALP) Program was presented to explain the basis and purpose of the evaluation.
The NRC Region I evaluation board meeting was discussed, including the assessment period, performance data and the results of the board's evaluation.
(See Appendix 1 with Attachment 1 and 2 and Enclosure 2).
The licensee's overall performance was considered acceptabl T
APPENDIX
SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE NINE MILE POINT NUCLEAR POWER STATION UNIT 2 REGION I EVALUATION BOARD MEETING Facility:
Nine Mile Point Nuclear Power Station Unit 2 Licensee:
Niagara Mohawk Power Corporation Unit Identification:
Docket No.
50-410 Reactor Information:
License No./Date of Issue CPPR-112/June 15, 1972 Unit No.
NSS:
General Electric Co.
MWT:
3323 Assessment Period:
February 1,
1980 to January 31, 1981 Evaluation Board Meeting Date:
April 1, 1981
.
Review Board Members:
Other NRC Attendees:
B.
H. Grier, Director, Region I J.
M. Allan, Deputy Director, Region I E. J.
Brunner, Acting Director, Division of Resident and Project Inspection, RI R. J.
Bores, Chief, Independent Measurements and Environmental Protection Section R. T. Carlson, Director, Enforcement and Investigation Staff, Region I J,
W. Devlin, Chief, Physical Protection Section, Division of Engineering and Technical Inspection, RI H.
B. Kister, Chief, Reactor Projects Section 1C, RI P. J. Polk, Project Manager, Operating Reactors Branch 2,
DL, NRR R. A. Feil, Reactor-Inspector, Reactor Projects
'Section 1C, RI J.
T. Wiggins, Reactor Inspector, Reactor Projects Section 1C, RI Attachment:
Licensee Performance Data
ATTACHMENT 1 NINE MILE POINT NUCLEAR POWER STATION UNIT 2 LICENSEE PERFORMANCE DATA Assessment Period:
February 1,
1980 to January 31, 1981 A.
Number and Nature of Noncom liance Items 1.
Noncompliance Category Violations Infractions Deficiencies S'everity I Severity II Severity III Severity IV Severity V
Severity VI Deviations 2.
Areas of Noncompliance equality Assurance
1
0
0
0
0
, ai
~
~ I I
NINE MILE POINT NUCLEAR POWER STATION UNIT 2 LICENSEE PERFORMANCE DATA Assessment Period:
February 1,
1980 to January 31, 1981 B.
Number and Nature of Licensee Event Re orts During the assessment period, 4 construction deficiency reports (CDR's)
wer e submitted by the licensee.
Two (2)
CDR'
were the.result of
"
construction/QC errors, one (1)
CDR resulted from a vendor/QC error and one (1)
CDR resulted from a design/fabrication error.
Two (2) CDR's have been resolved but not inspected by IE.
The remaining two (2) CDR's are in the process of being resolved by the licensee.
1.
Type of Events a.
Construction/QC Error b.
Vendor/QC Error c.
Design/Fabrication Error Causally Linked Events None 3.
Licensee Event Reports Reviewed (Report Nos.)
None C.
Escalated Enforcement Actions Civil Penalties None Orders None Immediate Action Letters None
4l l
~
~
NINE MII E POINT NUCLEAR POWER STATION UNIT 2 LICENSEE PERFORMANCE DATA Assessment Period:
February 1,
1980 to January 31, 1981 D.
Mana ement Conferences Held Durin Past Twelve Months No enforcement related meetings were held with licensee management during the assessement period.
On May 7, 1980, representatives from Niagara Mohawk Power Corporation (NMPC) and Stone and Webster Engineering Company (S&W) met with Region
Construction Branch representatives at King of Prussia, Pennsylvania.
The meeting was held at the licensee's request to make a presentation of the biological shield wall weld defect problem.
E.
Licensee Activities Construction activity has been at a reduced level.
Estimated completion is 31%.
Work force during the assessment period has ranged from 400 - 600 craft, inspection
& support personnel.
The present schedule for significant events is listed below:
Operating License Appl ication Construction Completion Date Fuel Load Target Date January 1983 December 1985 March 1986 F.
Ins ection Activities Eleven inspections were conducted during the assessment period.
Areas inspected included:
containment structure, quality assurance, reactor vessel installation, reactor vessel internals
& biological shield wall.
One inspection module is overdue.
(Environmental) (Inspection conducted 2/81).
The facility received 380 inspection hours during the assessment period.
G.
~l None
~ l
~
V ATTACHMENT 2 NINE MILE POINT NULCEAR POWER STATION UNIT 2 INSPECTION PROGRAM CHANGES CONSTRUCTION Inspection Time and/or Scope Changes From Prescribed IE Inspection Program Functional Area Increase No'han e
Oecrease l.
Oualit Assurance 2.
Substructure and Foundations 3.
Concrete 4.
Liner. Containment and Others 5.
Safet -Related Structures 6.
Piping and Hangers (Reactor Coolant and Others 7.
Safety-Related Components Vessel Inernals and HVAC X
'.
Electrical E ui ment 9.
El ectri cal Tra and Wire 10.
Instrumentation ll.
Fire Protection 12.
Preservice Ins ection 13.
Re or tin 14.
Environmental 15.
Trainin X
16.
Mana ement Reg dnal Oirector I
)