Text
U.S.
NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No.
50-220/81-15 Docket No.
50-220 License No.
DPR-63 Pri ority Category C
Licensee:
Nia ara Mohawk Power Cor oration 300 Erie Boulevard West S racuse New York 13202 Facility Name:
Nine Mile Point Unit
Inspection at:
Scriba, New York Inspection conducted:
June 1-4, 1981 Inspectors:
P.
S. Koltay, Reactor Inspector date signed Approved by S.
D. Ebneter, ief, Plant Systems Section date signed date signed Ins ection Summar
Ins ection on June 1-4 1981 Re ort No. 50-220/81-15 Areas Ins ected:
Routine unannounced inspection of thef plant Fire Protection/
Prevention Program7including (implementation of administrative proceduresl and (modifications to the plant fire protection systemsf outlined in the Safety Evaluation Report i ssued with Amendment No.
33 to Facility Operating License No
~
The modifications include the installation of:
water and gaseous suppression systems, fire detection devices, hose stations, fire barriers, fire barrier penetrations, smoke and heat ventilation equipment, alternate shutdown cabinets and miscellaneous fire protection equipment.
The inspection also included a review of critical fire areas outlined in TI 2519, review of fire protection equipment surveillance records and the status of previously identified outstanding items.
The inspection involved 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> onsite by one NRC regionally-based inspector.
Results:
No items of noncompliance were identified.
Region I Form 12 (Rev. April 77)
8107170178 810701 PDR ADOCK 05000220
~,r
DETAILS 1.
Persons Contacted J
G
" R.
Corcran,, Fire Protection Engineer DeAngelo, Manager, Generating Engineering Gresock, Licensing Engineer Perkins, General Superintendent for Nuclear Generation Roman, Station Superintendent Raymond, Fire Protection Coordinator Si lliman, Technical Superintendent
" denotes those personnel who were present at the exit interview.
2.
Action on Previous Ins ection Findin s
(Closed)
Unresolved Item (220/78-01-01):
Accumulation of combustible materials at elevation 237 of the reactor building.
The inspector reviewed Procedure NI-FP-7, Combustible Material Storage and verified that the licensee has established designated storage areas away from safety-related equipment.
The inspector also reviewed Procedure NI-FP-l, Supervisor's Weekly Plant Tour, and verified that elevation 237 of the reactor building is included in the weekly plant tour.
Inspections conducted by the licensee on January 8,
1981, January 15, 1981 and January 30, 1981 identified the area as being free of transient combustibles.
3.
Fire Protection/Prevention Pro ram
'a ~
Administrative Controls The inspector reviewed the following administrative procedures:
Nl-FP-Z, Welding and Cutting, Revision 3, August 13, 1979; N1-FP-3, Contractors and Subcontractors, Revision 1, April 18, 1978; Nl-FP-6, Fire Watch, Revision 0, March 23, 1979; N1-FP-7, Combustible Material Storage; and, Nl-ST-D1, Fire Doors Inspection, Revision 1, March 6, 1981.
The inspector verified that the administrative procedures include:
(1)
Control of Combustible Special authorization for the use of combustible, flammable or explosive hazardous material in safety-related area Prohibition on the storage of combustible, flammable or explosive hazardous materi a 1 i n sa fety-r el ated areas.
Requirement for the removal of all wastes, debris, rags, oil spills or other combustible materials resulting from the work activity following completion of the activity or at the end of each work shift, whichever is sooner.
Requirement that all wood used in safety-related areas is treated with flame retardant.
Requirement for periodic inspection for accumulation of combustibles.
(2)
Control of I nition Sources Welding and cutting operations and other open flame ignition sources are controlled by work permit and are properly safeguarded in areas containing safety-related equipment and components.
echnical S ecification Re uirements Smoking in safety-related areas is prohibited except where
"smoking permitted" areas have been specifically designated by plant management.
No item of noncompltance was identified.
4.
Review of Surveillance Records Associated with Fire Protection Related T
Operator Surveillance Test Procedure, Nl-ST-W14 Smoke and Heat Detector Test, Nl-ST-SA, January 9,
1979 The inspector verified that Procedure Nl-ST-W14 includes the weekly inspection of, fire protection and suppression systems.
No item of noncompliance was identified.
5.
Fire Protection Modifications Re uired b
Amendment No.
33 to Facilit 0 eratin License No.
DPR-63 a.
Codes and Standards The inspector conducted a sample review of fire suppression and detection systems'pecifications, drawings and inspected randomly selected installed fire protection equipments The inspector verified that the design and installation of equipment is in accordance with the applicable codes and standards of the National Fire Protection Association (NFPA).
The inspected fire protection equipment is Underwriters Laboratories approved and/or Factory Mutual listed,
b.
ualit Assurance The inspector reviewed "Fire Protection guality Assurance Program, Nine Mile Point 1" dated June 25, 1979.
The inspector verified that the licensee has esta6lished quality assurance requirements for fire protection related systems, structures and components, in accordance with the Branch Technical Position 9.5-1.
c.
Status of Fire Protection Modifications By review and examination of records including specifications and drawings and by examination of installed fire protection equipment, the inspector verified the licensee's implementation of scheduled modifications identified in the Safety Evaluation Report.
The licensee was granted schedular relief on several modifications identified in Table 3 '
of the SER.
Those modifications are identified below.
All other modifications have a completion commitment date of June 1981.
(1)
Item 3.1.1 Fire Detection S stem (To Be Completed by September 30, 1981)
The inspector reviewed Modification File 80-58 and verified that the licensee is in the process of installing fire detection devices in accordance with the approved functional specification dated June 23, 1980'.
The licensee is awaiting the delivery of seven local panels and the main fire protection system annunciator.
During the inspection of the auxiliary control room, the inspector noted that several detectors are installed near ventilation diffusers.
The National Fire Protection Association (NFPA)
Code 72F, Section 4.4 states that the detectors shall not be located where air from supply diffusers could di lute products of combustion before they reach the detector s.
A similar situation may develop once detectors are installed in the walk-in type control room cabinets where fans have been provided to make up for ventilation previously obtained from the auxilary control room.
The licensee stated that the problem will be evaluated prior to placing the fire protection system into service in the effected areas.
This item remains unresolved pending NRC review of the licensee's corrective action.
(220/81-15-01)
(2)
Item 3. 1.2 S rinkler S stem (To Be Completed by End of 1981 Refueling Outage The inspector reviewed Modification File 80-54 and associated functional specification, and verified that the installation of hardware has been complete (3)
Item 3. 1.3 Fire Sto s and Penetrations The inspector reviewed Test Report 79-NK8678 dated November 17, 1980 prepared by Underwriters Laboratories on, Floor and Wall Penetration Fire Stops, fire protection modifications drawings C19448-G, C19448-C, C27101-C and C27102-C.
The inspector verified that tests were conducted on electrical and mechanical fire barrier penetrations.
The penetrations inspected onsite are representative of those tested by U.L. for three hour fire rating.
The installation of fire barrier penetrations is 90%
completed.
The inspector reviewed the following procedures:
MP-45.49 and MP-45.36, Installation of Kaowool and Flamematic Fire Barrier for Wall Sleeves and Floor Sleeves; MP-44.4, Installation of Fire Retardant Materials for Cable Trays, Electrical Penetrations and Electrical Switchgear.
The inspector verified that the licensee has established procedures for opening and resealing fire barrier penetrations.
(4)
Item 3. 1.4 Fire and Heat Barriers The inspector verified that the licensee has installed radiant heat barriers between the following equipment:
liquid poison pumps power boards 155 and
reactor feed water pumps emergency diesel generator cooling water pumps'he inspector verified that the licensee has installed two hour rated enclosures for the following area:
waste building track post; general storage area at elevation 300 of the turbine building; hydrogen seal oil unit; stair towers in the southeast corner of the reactor building, northwest corner of the turbine building, southeast corner of the turbine building;
stairwell between the control room and auxiliary control room.
The licensee installed 1 1/2 hour rated fire doors in all two hour rated enclosures.
The inspector reviewed Modification Files 80-54, 55 and 57, Addition of Smoke Purge Capability to the Turbine Building.
The modification includes the installation of fire dampers at fire barrier walls, for new and existing ventilation systems.
The inspector verified that the licensee installed r'oof and side vents in the turbine building.
The licensee utilizes 1 1/2 hour rated, motor operated fire dampers in ducted ventilation systems.
The inspector noted that the turbine oil storage tank room, Item 3. 1.9(4),
has not been included in the modifications for installing rated fire dampers.
The licensee stated that the specification will be amended and rated fire dampers will be installed accordingly.
This item is considered unresolved pending NRC reviews of the licensee's corrective action.
(220/81-15-02)
(5)
Item 3. 1.7 Control Bui ldin Modifications The inspector verified that the licensee installed a noncombus-tible aluminum grid ceiling and is in the process of completing the following modifications:
automatic Halon system in the auxiliary control room, new ventilation system, emergency shutdown panels.
(6)
Item 3. 1.8 Diesel Generator Bui ldin Modifications The inspector reviewed the following documents:
Carboline Fire Proofing Products Application, Pyrocrete 241; Drawings 27152C, 27153C; Modification 80-64, Separate Redundant Fuel Oil Lines; Modification 80-04, Separate Diesel Generator Floor Drain System The inspector verified that the licensee has segregated redundant diesel generator equipment on all DGB elevations.
Three hour rated protection has been provided for the exposed structural steel.
(7)
Item 3.1.11 General Modifications The inspector verified. the installation of the following fire protection equipment.
six hose houses, one per yard hydrant seven hose stations, six located in the turbine building and one at elevation 237 ft of the reactor building the licensee installed 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> rated battery operated lights in access and egress routes for equipment necessary to accomplish safe shutdown during and after a fire.
Appendix R to 10 CFR 50.48, Section J, states that emergency lighting shall be provided in all areas needed for operation of safe shutdown equipment.
The licensee agreed to identify equipment requiring manual operations (e.g.
safe shutdown panels, power boards)
and install additional emergency lighting where necessary.
This item remains unresolved pending NRC review of licensee's corrective action.
(220/81-15-03)
V 6.
Critical Fire Areas The inspector toured the following critical fire areas identified in TI 2515/19:
auxiliary control room cable room diesel generator building reactor building The inspector verified that the above areas are free of storage of combus-tibles and adequate fire protection measures have been implemented while modifications are in progres.
Unresolved Items Unresolved items are matters about which more information is required to ascertain whether they are acceptable items, items of noncompliance, or deviations.
Unresolved items disclosed during the inspection are discussed in paragraphs 5.c(1), 5.c(4)
and 5.c(7).
8.
Exit Inter view The inspector met with the licensee representatives denoted in Details (paragraph 1) at the site on June 4,
1981 and summarized the purpose and scope of the inspection finding e