Text

SUBJECT:

SHEARON HARRIS NUCLEAR PLANT - DESIGN BASIS ASSURANCE INSPECTION (PROGRAMS) INSPECTION REPORT 05000400/2025010

Dear Carolyne Joseph:

On September 24, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Shearon Harris Nuclear Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Marcus A. Riley, Chief Engineering Branch 1 Division of Operating Reactor Safety Docket No. 05000400 License No. NPF-63

Enclosure:

As stated

Inspection Report

Docket Number:

05000400

License Number:

NPF-63

Report Number:

05000400/2025010

Enterprise Identifier:

I-2025-010-0031

Licensee:

Duke Energy Progress, LLC

Facility:

Shearon Harris Nuclear Plant

Location:

New Hill, NC

Inspection Dates:

August 25, 2025 to September 24, 2025

Inspectors:

C. Franklin, Reactor Inspector

M. Hagen, Reactor Inspector

A. Ruh, Senior Resident Inspector

Approved By:

Marcus A. Riley, Chief

Engineering Branch 1

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a design basis assurance inspection (programs) inspection at Shearon Harris Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.21N.03 - Commercial Grade Dedication The inspectors reviewed the implementation of the licensees processes for dedicating commercial-grade items/services as basic components and/or for procuring safety-related structures, systems, and components for the following samples:

Commercial Grade Dedication===

(1) Item 30166984, Gasket, Coupling, Viton, 8 in, Style-38 Dresser Coupling
(2) Item 74146846 Tube, Poro-Edge, 0.0625 Slot, 304SS or 316SS
(3) Item 9220201439 Lubricant, Grease, MOV Long Life, Grade 1, Tube, 14 oz
(4) Item 72458573 Bearing, Thrust, 2.5591, 5.51180, 1.2992, Angular Contact, Ball Bearing
(5) Item 72883564 Kit, Bushing, Seal, Mechanical, for 123-14 and CPL-14
(6) Item 2067 Ring, Seat, Upgraded, Valve, Globe, 8"X10", 900#
(7) Item 72419617 Capacitor, Electrolytic, Alum, 13,000uf, -10%/+50%, 150wvdc, Radial Screw Terminal, 6ma Maximum Leakage Current
(8) Item 72415144 Relay, Lockout, LOR/ER-Std Speed Trip, 125vdc, Double Sided, Double Wiping Knife Type, Electric Reset, 8 Decks
(9) Item 72432917 Relay, Rotary, 8PDT, 125vdc, Non-Latching

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 24, 2025, the inspectors presented the design basis assurance inspection (programs) inspection results to Carolyne Joseph and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.21N.03

Corrective Action

Documents

26383,

2532960,

2555680,

2557158, 2564424

71111.21N.03

Corrective Action

Documents

Resulting from

Inspection

2566312

CRDF Polystyrene Calibration Film Outside Certification

08/26/2025

71111.21N.03

Corrective Action

Documents

Resulting from

Inspection

2566412

Grease Guns in the Hot Tool Shop Contain Grease

Outside of Ten Years

08/27/2025

71111.21N.03

Corrective Action

Documents

Resulting from

Inspection

2567035

Durometer Hardness for Coupling Seal

09/03/2025

71111.21N.03

Drawings

1364-002368

Component Cooling Water Pump Outline

71111.21N.03

Drawings

1364-004383

Main Steam Power OP Relief Valve Body Details

71111.21N.03

Drawings

1364-005657

25V Class 1E Battery Charger

71111.21N.03

Drawings

1364-005831

Emergency Service Water Screen Wash Pump O/L

71111.21N.03

Drawings

1364-006318

ESW Self Cleaning Strainer Cross Section

71111.21N.03

Drawings

1364-030819

DCN 251-329

06/08/1984

71111.21N.03

Drawings

1364-032738

Sequencer PNLs 1A & 1B Steel Details

71111.21N.03

Drawings

1364-046715

SEQUENCER PNL B RISER NO 5 TB WIRING DIAG U

1-2

71111.21N.03

Drawings

6-B-401 1124

CAR 2166

2/26/1979

71111.21N.03

Drawings

6-B-401 1153

G-209501

71111.21N.03

Engineering

Changes

CGI 010114

Critical Characteristics for Acceptance

71111.21N.03

Engineering

Changes

CGI 010131

Critical Characteristics for Acceptance

71111.21N.03

Engineering

CGI 408769

F, CGI, PQL2, VARIOUS, ELECTROYLTIC

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Changes

CAPACITORS, VARIOUS, RLM/JM

71111.21N.03

Engineering

Changes

CGI 413477

H,B,R,CGI,PQL2,VARIOUS,RELAY,POTTER AND

BRUMFIELD,DR/AG

71111.21N.03

Engineering

Changes

CGI 418962

H, CGI, PQL2, 0072415144, LOCKOUT RELAY,

ELECTROSWITCH, KB/KAD

71111.21N.03

Engineering

Changes

EC 294842

C, CGI, Q2, VARIOUS, GASKET, COUPLING, AP

SERVICES, MS/WP

71111.21N.03

Engineering

Changes

EC 400765

F, SL, PQL-0,1,2,3, Various, Shelf Life Requirements,

MJH/TS

71111.21N.03

Engineering

Changes

EC 404961

KIT, BUSHING, SEAL,MECHANICAL, FOR 123-14 AND

CPL-14

71111.21N.03

Engineering

Changes

EC 417571

RING, SEAT, UPGRADED, VALVE,GLOBE,8"X10",900#

71111.21N.03

Engineering

Changes

EC 418368

Bearing, Thrust, 2.5591, 5.51180, 1.2992, Angular

Contact, Ball Bearing

71111.21N.03

Engineering

Changes

EC 418962

Pics of UTC 0001823614

71111.21N.03

Engineering

Changes

EC 418962

NONCON-1

Non Conformance Report

71111.21N.03

Engineering

Changes

EC 421668

H, CGI, PQL2, VARIOUS, GASKET, COUPLING,

DRESSER, MJH/WMB

71111.21N.03

Engineering

Changes

EC 96662

Evaluation of Replacement Limitorque MOV Gearbox

Grease From Nebula Grades 0, 1 to MOVLL

71111.21N.03

Engineering

Evaluations

000961.01

Capacitor, Electrolytic

08/08/1996

71111.21N.03

Engineering

Evaluations

00803

RELAYS, P & B MDR

71111.21N.03

Engineering

Evaluations

ESR9700304

Strainer Tube Material Evaluation

04/17/1997

71111.21N.03

Engineering

Evaluations

ME 2712.00

Material Evaluation: Tube, Poro-Edge

04/18/1997

71111.21N.03

Engineering

Evaluations

ME 7646R01

Material Evaluation: Grease MOV Long Life

07/28/2010

71111.21N.03

Miscellaneous

CAR-SH-A-002

EBASCO Specification: Nuclear Steam Supply System

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

and Fuel

71111.21N.03

Miscellaneous

CAR-SH-IN-027

Ebasco Specification Sequencer Panels

71111.21N.03

Miscellaneous

CAR-SH-M-056

EBASCO Specification: Main Steam Power Operated

Relief Valve

71111.21N.03

Miscellaneous

CGlBE01

EPRI CGI JUTG Commercial Grade Evaluation for

Bearings - Rolling

71111.21N.03

Miscellaneous

NUPIC

Audit/Survey#:

24442

NUPIC Joint Audit of: Chesterton, A.W. Company

Groveland, MA

08/30/2017

71111.21N.03

Miscellaneous

VM-BHV

Mechanical Seals

71111.21N.03

Miscellaneous

VM-ISP-V01

Pacific Pumps Pump Operation and Maintenance Manual

for Component Cooling Water Pumps

71111.21N.03

Miscellaneous

VM-JCE

Strainers, Separators & Coolers

71111.21N.03

Miscellaneous

VM-LZL-V01

Switches & Relays vendor manual resource

06/20/2018

71111.21N.03

Miscellaneous

VM-MBO-V01

Engine, Diesel-Instr. Manual

71111.21N.03

Miscellaneous

VM-MBO-V02

Diesel Engine Parts Manual

71111.21N.03

Miscellaneous

VM-OSN-V01

Relief Valves

71111.21N.03

Shipping

Records

255500

QC Inspection Report: KIT, BUSHING,

SEAL,MECHANICAL

06/18/2019

71111.21N.03

Shipping

Records

260604

QC Inspection Report: Thrust Bearing, Angular Contact

Ball Bearing

8/17/2020

71111.21N.03

Shipping

Records

262007

QC Inspection Report

01/28/2001

71111.21N.03

Shipping

Records

264906

QC Inspection Report

08/30/2021

71111.21N.03

Shipping

Records

269152

QC Inspection Report: Ring, Seat, Upgraded, Valve,

Globe

2/21/2023

71111.21N.03

Shipping

Records

269911

QC Inspection Report

05/24/2023

71111.21N.03

Shipping

Records

270887

QC Inspection Report

09/20/2023

71111.21N.03

Shipping

Records

270795

QC Inspection Report: Lubricant, Grease, MOV Long Life

2/19/2024

71111.21N.03

Shipping

2923

QC Inspection Report: Tube, Poro-Edge

04/10/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Records

71111.21N.03

Shipping

Records

3092168

QC Inspection Report: Gasket, Coupling, Viton

07/28/2017

71111.21N.03

Shipping

Records

PO 03093868

Purchase Order: KIT, BUSHING, SEAL,MECHANICAL

06/13/2019

71111.21N.03

Shipping

Records

PO 03115762

Purchase Order: BEARING, THRUST, 2.5591, 5.51180,

1.2992, ANGULAR CONTACT, BALL BEARING

8/12/2020

71111.21N.03

Shipping

Records

PO 03120354

Purchase Order RELAY, LOCKOUT, LOR/ER-STD

SPEED TRIP

11/23/2020

71111.21N.03

Shipping

Records

PO 03126243

Purchase Order RELAY, ROTARY, 8PDT,125VDC,NON-

LATCHING

03/30/2021

71111.21N.03

Shipping

Records

PO 03153314

Purchase Order: Ring, Seat, Upgraded, Valve, Globe

11/16/2022

71111.21N.03

Shipping

Records

PO 03162211

Purchase Order CAPACITOR, ELECTROLYTIC, ALUM,

13,000UF

05/10/2023

71111.21N.03

Shipping

Records

PO 03162892

Purchase Order CAPACITOR, ELECTROLYTIC, ALUM,

13,000UF

05/23/2023

71111.21N.03

Shipping

Records

PO 3168764

Purchase Order: Lubricant, Grease, MOV Long Life,

Grade 1

09/11/2023

71111.21N.03

Shipping

Records

PO 3180600

Purchase Order: Tube, Poro-Edge

04/04/2024

71111.21N.03

Work Orders

282340 01

1EE-E084, REPLACE CAPACITORS CI & C2

01/11/2024

71111.21N.03

Work Orders

282340 02

PIC-E050, 1EE-E084, LOAD TEST

05/23/2023

71111.21N.03

Work Orders

290675

Disassemble/Inspect/Rebuild Pump per CM-M0195

1/16/2020

71111.21N.03

Work Orders

20320359

Rebuild 1CC-CCWA, "A" CCW Pump

10/11/2021

71111.21N.03

Work Orders

20377113

EL,94LO/1124,THERMAL OVERLOAD & TORQUE

BYPASS LOCKOUT RELAY

71111.21N.03

Work Orders

20489487 02

EL, 94-4/1153, PERFORM A BENCH TEST

07/06/22

71111.21N.03

Work Orders

20493015

1EE-E084, INSPECTION, 125VDC 1E BYC 1A-SA

08/16/2022

71111.21N.03

Work Orders

20571478

Rebuild Valve 1MS-58 IAW CM-M0187

05/04/2024

71111.21N.03

Work Orders

20588428-01

PM, ASSIST EPT-163 "A" ESW STRNR (1SWE041)

05/20/2024