Text
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000400/2025402
Dear Linwood Faulk:
On June 26, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Shearon Harris Nuclear Power Plant and discussed the results of this inspection with Sarah McDaniel and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket No. 05000400 License No. NPF-63
Enclosure:
As stated
Inspection Report
Docket Number:
05000400
License Number:
Report Number:
Enterprise Identifier:
I-2025-402-0026
Licensee:
Duke Energy Progress, LLC
Facility:
Shearon Harris Nuclear Power Plant
Location:
New Hill, SC
Inspection Dates:
June 23, 2025, to June 26, 2025
Inspectors:
J. Tornow, Physical Security Inspector
R. Womack, Senior Physical Security Inspector
Approved By:
Jannette G. Worosilo, Chief
Nuclear Security Branch
Division of Fuels, Radiological Safety, and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Shearon Harris Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.04 - Equipment Performance, Testing, and Maintenance
The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from IP:
Equipment Performance, Testing, and Maintenance (1 Sample)
- (1) Tier I: All requirements Tier II: 02.09 a., b.; 02.11 a., d.
Tier III: 02.15 a., c.
71130.07 - Security Training
The inspectors evaluated the security training program through completion of the following
procedure elements: Security Training
- (1) Tier I: All requirements Tier II: 02.05 a., c.; 02.07 a.; 02. 09 a., b.
Tier III: 02.10; 02.11 a.; 02.13 a., c.; 02.14 a.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On June 26, 2025, the inspectors presented the security baseline inspection results to Sarah McDaniel and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2501686
01/19/2024
2502593
01/26/2024
2505187
2/15/2024
2513383
04/20/2024
2517979
2/15/2024
2546021
03/03/2025
2554351
05/13/2025
2556043
05/29/2025
2556207
06/10/2025
Corrective Action
Documents
289517
06/09/2025
Engineering
Changes
401309
DESG Primary Documentation
Revision 19
AD-SY-ALL-0580
Weapons Maintenance, Testing, and Accountability
Revision 8
AD-SY-ALL-0610
Nuclear Security Equipment Maintenance Program
Revision 1
AD-SY-HNP-0600
Testing and Inspection of Security Equipment and Barriers
Revision 7
ORT-1408
Security Diesel Operability Run
Revision 32
ORT-1422
Security Diesel Generator Load Bank Test Annual Interval All
Modes
Revision 2
Procedures
PM-M0103
Security Diesel Engine Operational Inspection
Revision 7
Corrective Action
Documents
Resulting from
Inspection
2559307
Initial Security FTO/TPE Evaluator Training Record
(Samples)
Security Instructor Qualifications (Samples)
Armorer Certifications (Samples)
Individual Qualification Records (Samples)
OJT Hours Tracking Form (Samples)
LP-SY-ALL-0572
NRC Reportability
Revision 1
Miscellaneous
LP-SY-HNP-0506
Vehicle Search
Revision 4
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
LP-SY-NGO-0524
09/09/2021
TG-SY-HNP-0506
Armed Officer Tactical Qualification Course of Fire
TG-SY-HNP-0530
Harris Nuclear Plant OJT/TPE Guide
Revision 24
TG-SY-HNP-0530
Harris Nuclear Plant OJT/TPE Guide
Revision 25
AD-SY-ALL-0190
Security Records Program
Revision 6
AD-SY-ALL-0510
Security Program Systematic Approach To Training
Revision 5
AD-SY-ALL-0520
Security Training
Revision 8
AD-SY-ALL-0524
Security On-The-Job Training (OJT) and Task Performance
Evaluation (TPE)
Revision 2
Procedures
AD-SY-ALL-0540
Security Range Safety and Control
Revision 11