SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000400/2025401

Dear Linwood Faulk:

On February 13, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Shearon Harris Nuclear Power Plant and discussed the results of this inspection with T. Haaf and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket No. 05000400 License No. NPF-63

Enclosure:

As stated

Inspection Report

Docket Number:

05000400

License Number:

NPF-63

Report Number:

05000400/2025401

Enterprise Identifier:

I-2025-401-0041

Licensee:

Duke Energy Progress, LLC

Facility:

Shearon Harris Nuclear Power Plant

Location:

New Hill, SC

Inspection Dates:

January 13, 2025, to January 16, 2025 (Kings Mountain, NC)

February 10, 2025, to February 13, 2025 (New Hill, SC)

Inspectors:

J. Justice, Senior Physical Security Inspector

R. Patterson, Senior Physical Security Inspector

D. Egelstad, Physical Security Inspector

J. Stovall, Physical Security Inspector (Training)

Approved By:

Jannette G. Worosilo, Chief

Nuclear Security Branch

Division of Fuels, Radiological Safety, and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Shearon Harris Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were evaluated:

Access Authorization

(1)

  • Tier I: All Requirements
  • Tier II: All Requirements
  • Tier III: All Requirements

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1)

  • Tier I: All Requirements
  • Tier II: 02.06 (a-d), 02.08 (a, c, e, h, i)
  • Tier III: 02.10 (a)

71130.08 - Fitness-For-Duty Program

The inspectors evaluated the fitness for duty program by completing the following inspection

elements: Fitness-For-Duty Program

(1)

  • Tier I: All Requirements
  • Tier II: 02.05 (a-l), 02.06 (a-g), 02.07, 02.08, 02.09 (a, b, c, d)
  • Tier III: 02.10, 02.11 (a), 02.12 (a), 02.14 (a, b, c)

71130.09 - Security Plan Changes

Security Plan Changes (1 Sample)

(1) Since the last NRC baseline inspection of this program area, Shearon Harris Security Plan Revision 16 dated April 10, 2023, was implemented based on Duke Energy's evaluation, and in accordance with 10 CFR 50.54 (p)(2), that the change resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan change continues to meet the requirements of 10 CFR 73.55 (b). The inspector conducted a review of the security plan change to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of those change. Therefore, the change remains subject to future NRC inspection in its entirety.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) June 2024 - January

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On February 13, 2025, the inspectors presented the security baseline inspection results to T. Haaf and other members of the licensee staff.
  • On January 16, 2025, the inspectors presented the Kings Mountain corporate inspection results to Teddy Reed and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

2540300

2540899

Various Access Authorization Personnel Records

Miscellaneous

Various Self-Screener Audits

AD-SY-ALL-0301

Nuclear Worker Unescorted Access Authorization Program

Revision 11

AD-SY-ALL-0310

Access Authorization Processing

Revision 11

AD-SY-ALL-0320

Personnel Access Data System (PADS)

Revision 5

AD-SY-ALL-0340

Access Authorization Training and Qualification Program

Revision 3

AD-SY-ALL-0350

Reviewing Officials Guidance for Access Authorization

Revision 4

Procedures

AD-SY-ALL-0370

Access Processing of Foreign Nationals

Revision 4

2411430-05

22 PADS Self-Assessment

05/19/2022

71130.01

Self-Assessments

2432397-05

Psychological Testing

07/05/2022

AD-SY-ALL-0110

Protection of Information Related to Nuclear Security

Revision 10

AD-SY-ALL-0210

Site Access Controls

Revision 8

AD-SY-ALL-0215

Security Search and Entry Procedures

Revision 12

AD-SY-ALL-0240

Security Keys and Locks

Revision 3

CSD-SY-HNP-

215-01

HNP Security Search and Entry Processing

Revision 5

CSD-SY-HNP-

240-01

HNP Security Key and Lock Program

Revision 0

Procedures

SP-015

Emergency Plan Support

Revision 33

71130.02

Self-Assessments

24-HNP-SEC-

LSA-01

Nuclear Oversight-Conditional Audit Harris Physical

Protection

01/18/2024

Corrective Action

Documents

2532174,

2521189,

2439065,

2416953,

2416381,

2415751

Generic Fitness For Duty and Behavioral Observation

Lesson Plan

Revision 4

71130.08

Procedures

23 NRC Fitness For Duty Program Performance Data

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Report

AD-SY-All- 0401

Fitness For Duty Program

Revision 7

AD-SY-ALL-0110

Protection of Information Related to Nuclear Security

Revision 10

AD-SY-ALL-0405

Fitness For Duty Violations

Revision 6

AD-SY-ALL-0410

Fitness For Duty Drug and Alcohol Collections

Revision 7

AD-SY-ALL-0415

Fitness For Duty Blind Performance Testing Procedure

Revision 005

AD-SY-ALL-0420

Fitness For Duty Unscheduled Call Outs

Revision 2

AD-SY-ALL-0440

Fitness For Duty Training and Qualification Program

Revision 3

AD-SY-ALL-0451

Behavioral Observation Program

Revision 6

AD-SY-ALL-0460

Managing Fatigue and Work Hours Limits

Revision 8

PY-SY-ALL-0004

Duke Energy Generation Fitness For Duty Policy

Revision 3

AD-SY-ALL-0101

Security Plan Revision Process

Revision 3

71130.09

Procedures

AD-SY-ALL-0110

Protection of Information Related to Nuclear Security

Revision 10

71151

Procedures

AD-PI-ALL-0700

Performance Indicators

Revision 6