IR 05000400/2015502
| ML15323A330 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 11/19/2015 |
| From: | Brian Bonser NRC/RGN-II/DRS/PSB1 |
| To: | Waldrep B Duke Energy Progress |
| Linda K. Gruhler 404-997-4633 | |
| References | |
| IR 2015502 | |
| Download: ML15323A330 (11) | |
Text
November 19, 2015
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS INSPECTION REPORT 05000400/2015502
Dear Mr. Waldrep:
On October 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Shearon Harris Nuclear Power Plant, Unit 1. The enclosed inspection report (IR)
documents the inspection results that were discussed on October 30, 2015, with you and other members of your staff.
No findings were identified during this inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter, its Enclosure, and your response if any, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Brian R. Bonser, Chief
Plant Support Branch 1
Division of Reactor Safety
Docket No. 50-400 License No. NPF-63
Enclosure:
IR 05000400/2015502 w/Attachment: Supplementary Information
REGION II==
Docket No:
05000400
License No:
Report No:
Licensee:
Duke Energy Progress, Inc.
Facility:
Shearon Harris Nuclear Power Plant, Unit 1
Location:
New Hill, NC
Dates:
October 26-30, 2015
Inspectors:
Steven Sanchez, Senior Emergency Preparedness Inspector Christopher Fontana, Emergency Preparedness Inspector Jonathan Brown, Physical Security Inspector Wade Loo, Senior Health Physicist Joseph Austin, Senior Resident Inspector
Approved by:
Brian Bonser, Chief
Plant Support Branch 1
Division of Reactor Safety
SUMMARY
Inspection Report (IR) 05000400/2015502; 10/26/2015 - 10/30/2015; Shearon Harris Nuclear
Power Plant, Unit 1; Exercise and Baseline Inspection
This report covers an announced inspection by two emergency preparedness inspectors, one physical security inspector, one senior health physicist, and one senior resident inspector. No findings of significance were identified. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process,
Revision 5.
No findings were identified during this inspection.
REPORT DETAILS
REACTOR SAFETY
Cornerstone: Emergency Preparedness
1EP4 Emergency Action Level and Emergency Plan Changes
a. Inspection Scope
Since the last NRC inspection of this program area, several revisions were made to the Radiological Emergency Plan, and associated implementing procedures. The licensee determined that, in accordance with 10 CFR 50.54(q), the Plan continued to meet the requirements of 10 CFR 50.47(b), and Appendix E to 10 CFR Part 50. The inspectors reviewed the changes and sampled implementing procedure changes made between September 2014 and July 2015 to evaluate for potential reductions in the effectiveness of the Plan. As this review was not documented in a Safety Evaluation Report, and does not constitute formal NRC approval of the changes, these changes remain subject to future NRC inspection in their entirety.
The inspection was conducted in accordance with NRC Inspection Procedure (IP)71114, Attachment 04, Emergency Action Level and Emergency Plan Changes.
The applicable planning standards of 10 CFR 50.47(b), and its related requirements in 10 CFR Part 50, Appendix E, were used as reference criteria.
The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the emergency action level, and emergency plan changes on an annual basis.
b. Findings
No findings were identified.
1EP7 Exercise Evaluation - Hostile Action Event
a. Inspection Scope
Title 10 CFR Part 50, Appendix E, Section IV.F.2.j, requires, in part, that nuclear power reactor licensees, in each 8-calendar-year exercise cycle, provide the opportunity for their emergency response organization (ERO) to demonstrate proficiency in the key skills necessary to respond to a hostile action (HA) directed at the plant site. The licensee designed the October 27, 2015, exercise to satisfy that requirement, and the NRC inspected the HA event exercise to assess the licensees ability to effectively implement their emergency plan during a HA event, and adequately protect publics health and safety.
The exercise evaluation consisted of the following reviews and assessments:
- The adequacy of the licensees performance in the biennial exercise, conducted on October 27, 2015, was reviewed and assessed regarding the implementation of the Risk-Significant Planning Standards in 10 CFR 50.47(b)(4), (5), (9), and (10), which addresses emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
- The overall adequacy of the licensees emergency response facilities with regard to NUREG-0696, Functional Criteria for Emergency Response Facilities, and Emergency Plan commitments. The facilities assessed were the Control Room Simulator, Central Alarm Station, Incident Command Post, the Alternate Assembly Area, and the Emergency Operations Facility.
- A review of other performance areas, such as the ERO recognition of abnormal plant conditions; command and control, including interactions with site security staff,
intra-and inter-facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies, including local law enforcement agencies; staffing and procedure adequacy; and the overall implementation of the emergency plan and its implementing procedures.
- Past performance issues from NRC inspection reports, and Federal Emergency Management Agency (FEMA)/Department of Homeland Security (DHS) exercise reports, to determine the effectiveness of corrective actions as demonstrated during this exercise to ensure compliance with 10 CFR 50.47(b)(14).
- The adequacy of the licensees post-exercise critiques, to evaluate licensee self-assessment of its ERO performance during the October 27, 2015, exercise to ensure compliance with 10 CFR Part 50, Appendix E, Subsection IV.F.2.g.
The inspectors reviewed various documents, which are listed in the Attachment. This
inspection activity satisfied one inspection sample for the exercise evaluation on a
biennial basis.
b. Findings
No findings were identified.
1EP8 Exercise Evaluation - Scenario Review
a. Inspection Scope
Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, Exercise Evaluation - Scenario Review, to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14).
The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.
b. Findings
No findings were identified.
OTHER ACTIVITIES
4OA1 Performance Indicator Verification
a. Inspection Scope
The inspectors sampled licensee submittals relative to the performance indicators (PIs) listed below for the period January 1, 2014, through June 30, 2015. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in Nuclear Energy Institute 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, was used to confirm the reporting basis for each data element.
Emergency Preparedness Cornerstone
- Drill/Exercise Performance (DEP)
- Emergency Response Organization (ERO) Readiness
- Alert and Notification System (ANS) Reliability
For the specified review period, the inspectors examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspectors verified the accuracy of the PIs for ERO and DEP through review of a sample of drill and event records. The inspectors reviewed selected training records to verify the accuracy of the PI for ERO drill participation for personnel assigned to key positions in the ERO. The inspectors verified the accuracy of the PI for ANS reliability through review of a sample of the licensees records of periodic system tests. The inspectors also interviewed the licensees personnel who were responsible for collecting and evaluating the PI data.
Licensee procedures, records, and other documents reviewed within this inspection area are listed in the Attachment. This inspection satisfied three inspection samples for PI verification on an annual basis.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
On October 30, 2015, the inspection team presented the inspection results to Mr. Benjamin Waldrep and other members of the plant staff. The inspectors confirmed that no proprietary information was provided during the inspection.
ATTACHMENT:
SUPPLEMENTARY INFORMATION
KEY POINTS OF CONTACT
Licensee personnel
M. Austin-Emergency Preparedness Corporate Functional Area Manager
- S. Cahill-Manager, Maintenance
- J. Caves-Manager, Nuclear Regulatory Affairs
- K. Clemmer-Director, Engineering Projects
- D. Corlett-Manager, Environmental Controls
J. Dufner-Plant Manager
D. Earp-Senior Nuclear Engineer
M. Epstein-Emergency Preparedness
- L. Faulk-Director, Nuclear Plant Security
- D. Griffith-Manager, Nuclear Training
T. Hamilton-Plant General Manager
- J. Keltner-Manager, Chemistry
- C. Kidd-Director, Engineering
- D. MacDougall-(Acting) Manager, Operations
T. Maness-Senior Project Director
- B. McCabe-Manager, Nuclear Oversight
- S. OConnor-General Manager, Nuclear Engineering
- M. Parker-Manager, Nuclear Radiation Protection
- D. Schroeder-Director, Hess Nuclear Engineering
J. Sharlow-Senior Emergency Preparedness Specialist
- T. Toler-Superintendent, Nuclear Oversight
B. Waldrep-Site Vice President
T. White-Fleet Emergency Preparedness
- F. Womack-Manager, Wok Management
ITEMS OPENED, CLOSED, DISCUSSED, AND UPDATED
None