Forwards IE Insp Rept 50-388/82-13 on 821115-19.No Noncompliance Noted
ML20028D602
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 01/05/1983
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML20028D603 List:
References
NUDOCS 8301190317
Download: ML20028D602 (2)


See also: IR 05000388/1982013

Text

.

,

,

JAN 051983

Docket No. 50-388

Pennsylvania Power & Light Company

ATTN: Mr. Norman W. Curtis

Vice President

Engineering and Construction

- Nuclear

2 North Ninth Street

Allentown, Pennsylvania

18101

Gentlemen:

Subject:

Inspection Report No. 50-388/82-13

,

This refers to the routine safety inspection conducted by Mr. A. Finkel of

this office on November IF #9, 1982 at Susquehanna Steam Electric Station,

Unit 2, Berwick, Pennsylvania of activities authorized by NRC License No.

CPPR-102 and to the discussions of our findings held by Mr. Finkel with Mr. S.

Denson and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representa-

tive records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

During the inspection, the practice of recording cut cable length only for

installed electrical cable was discussed. The inspector found that, on the

average for the sample of cables examined, the actual cable length was 40%

less than the recorded cut cable length. Discrepancies of this magnitude

should be considered in station power studies. The result should be a

conservative power system, but this was not the case with Unit 1 (Systematic

,

Assessment of Licensee Performance Report, June 1,1982). You sre requested

l

to consider and analyze the differences in cut electrical cable lengths as

part of your power study for Unit 2.

l

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

'

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

l

application to withhold information contained therein within thirty days of

the date of this letter. Such application must be consistent with the require-

ments of 2.790(b)(1).

The telephone notification of your intent to request

,

withholding, or any request for an extension of the 10 day period which you

l

believe r.ecessary, should be made to the Supervisor, Files, Mail and Records,

l

USNRC Region I, at (215) 337-5223.

OFFICIAL RECORD COPY

!

!

,

8301190317 830105

PDR ADOCK 05000388

\\Y

Q

PDR

\\

i

O

&

Pennsylvania Power & Light Company

2

JAN 051983

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

l

oricin:Ist;;3c;;f,

%

homas T. Martin, Director

Division of Engineering and Technical

Programs

Enclosure: NRC Region I Inspection Report Number 50-388/82-13

cc w/ enc 1:

A. R. Sabol, Manager, Nuclear Quality Assurance

W. E. Barberich, Licensing Engineer

H. W. Keiser, Superintendent of Plant

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ enc 1:

Region I Docket Room (with concurrences)

Jessica H. Laverty, ELD

Senior Operations Officer (w/o encis)

DPRP Section Chief

Ebe McCabe

t

0'

ta

as

na

RI:DPRP 'g

RI:DPRP

v

RI:DPRP

RI:DPRP

Finkel/pja

Plisco

Bettenhausen

Ebneter

1/3/83

V#$G

////A