IR 05000387/2014001

From kanterella
(Redirected from IR 05000388/2014001)
Jump to navigation Jump to search
ROP 15 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2014001 and 05000388/2014001)
ML15062A232
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/04/2015
From: Dan Dorman
NRC Region 1
To: Rausch T
Susquehanna
BOWER, FL
Shared Package
ML15049A478 List:
References
05000387/2014001, 05000388/2014001
Download: ML15062A232 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2015

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (REPORT 05000387/2014001 AND 05000388/2014001)

Dear Mr. Rausch:

On February 9, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Susquehanna Steam Electric Station (Susquehanna)

Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs)

in addition to inspection results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at Susquehanna Unit 1 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP)

Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).

Additionally, the NRC determined the performance at Susquehanna Unit 2 during the most recent quarter was within the Licensee Response Column of the NRCs ROP Action Matrix because we satisfactorily completed Inspection Procedure (IP) 95002, Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area, on July 31, 2014, in which we reviewed your identified root causes and corrective actions for the Unplanned Scrams with Complications and the Unplanned Scrams per 7000 Critical Hours PIs. We also conducted a public performance assessment meeting on September 3, 2014, to report the results of this inspection and issued an assessment follow-up letter on September 12, 2014, in which we described Unit 2s transition to the Licensee Response Column of the NRCs Action Matrix (Report 05000388/2014008, ML14255A250). Therefore, because all Unit 1 and Unit 2 findings and PIs that input into the Action Matrix are Green, we plan to perform NRC baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to ROP baseline inspections, the NRC plans to perform Inspection Procedure (IP) 92702, Follow-up on Corrective Actions for Violations and Deviations, once you notify the NRC of your readiness for this inspection. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Fred Bower at (610) 337-5200 with any questions you have regarding this letter.

Sincerely,

/RA/

Daniel H. Dorman Regional Administrator Docket Nos. 50-387, 50-388 License Nos. NPF-14, NPF-22 Enclosure: Susquehanna Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML15062A232 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/ORA NAME SBarber/GSB * FBower/ FLB * HNieh/ HKN * DDorman/ DHD DATE 02/19/15 02/19/15 02/25/15 03/02/15

Page 1 of 2 Susquehanna 01/26/2015 09:42:19 Inspection / Activity Plan Report 22 01/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 1/19EXAM - SUSQUEHANNA RETAKE EXAM 2 1 01/19/2015 01/23/2015 U01933 FY15-SUSQUEHANNA INITIAL OPERATOR LICENSING RETAKE EXAM 7111107T - TRIENNIAL HEAT SINK 1 1, 2 02/23/2015 02/27/2015 IP 7111107T Heat Sink Performance 8/17EXAM - INITIAL OL EXAM 3 1 07/20/2015 07/24/2015 U01916 FY15-SUSQUEHANNA INITIAL OPERATOR LICENSING EXAM 1 08/17/2015 08/28/2015 U01916 FY15-SUSQUEHANNA INITIAL OPERATOR LICENSING EXAM 7111108G - U2 INSERVICE INSPECTION 1 2 04/20/2015 04/24/2015 IP 7111108G Inservice Inspection Activities - BWR 71124 - RAD SAFETY INSPECTION 1 1, 2 04/27/2015 05/01/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/27/2015 05/01/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 04/27/2015 05/01/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/27/2015 05/01/2015 IP 71124.04 Occupational Dose Assessment 1, 2 04/27/2015 05/01/2015 IP 71151 Performance Indicator Verification 71124.07 - RAD SAFETY INSPECTION 1 1, 2 06/15/2015 06/19/2015 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 06/15/2015 06/19/2015 IP 71151 Performance Indicator Verification 71124 - RAD SAFETY INSPECTION 1 1, 2 08/17/2015 08/21/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 08/17/2015 08/21/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 08/17/2015 08/21/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 08/17/2015 08/21/2015 IP 71124.04 Occupational Dose Assessment MODS - PERMANENT PLANT MODIFICATIONS 3 1, 2 08/31/2015 09/04/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 09/14/2015 09/18/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111111B - REQUAL INSP W/ P/F RESULTS 2 1, 2 10/26/2015 10/30/2015 IP 7111111B Licensed Operator Requalification Program 71124 - RAD SAFETY INSP 1 1, 2 10/05/2015 10/09/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/05/2015 10/09/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/05/2015 10/09/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/05/2015 10/09/2015 IP 71124.04 Occupational Dose Assessment This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Susquehanna 01/26/2015 09:42:19 Inspection / Activity Plan Report 22 01/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP PROGRAM INSPECTION 1 1, 2 10/26/2015 10/30/2015 IP 7111402 Alert and Notification System Testing 1, 2 10/26/2015 10/30/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 10/26/2015 10/30/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies ISI - U1 INSERVICE INSPECTION 1 1 03/21/2016 03/25/2016 IP 7111108G Inservice Inspection Activities - BWR RS1234PI - HP OUTAGE INSPECTION 1 1, 2 03/28/2016 04/01/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/28/2016 04/01/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/28/2016 04/01/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/28/2016 04/01/2016 IP 71124.04 Occupational Dose Assessment RS6PI - EFFLUENTS PUBLIC PI 1 1, 2 06/13/2016 06/17/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/13/2016 06/17/2016 IP 71151-PR01 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.