MONTHYEARIR 05000387/20240052024-08-29029 August 2024 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2024005 and 05000388/2024005) IR 05000387/20240022024-08-12012 August 2024 Integrated Inspection Report 05000387/2024002 and 05000388/2024002 IR 05000387/20240012024-05-13013 May 2024 Integrated Inspection Report 05000387/2024001 and 05000388/2024001 IR 05000387/20244042024-05-0707 May 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000387/2024404 and 05000388/2024404 IR 05000387/20240112024-02-29029 February 2024 Commercial Grade Dedication Inspection Report 05000387/2024011 and 05000388/2024011 IR 05000387/20230062024-02-28028 February 2024 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2023006 and 05000388/2023006) IR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 IR 05000387/20233012023-09-20020 September 2023 Initial Operator Licensing Examination Report 05000387/2023301 and 05000388/2023301 IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) IR 05000387/20230022023-08-0101 August 2023 Integrated Inspection Report 05000387/2023002 and 05000388/2023002 IR 05000387/20234012023-06-0707 June 2023 Security Baseline Inspection Report 05000387/2023401 and 05000388/2023401 IR 05000387/20230012023-05-12012 May 2023 Integrated Inspection Report 05000387/2023001 and 05000388/2023001 IR 05000387/20220062023-03-0101 March 2023 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006) IR 05000387/20220042023-02-0808 February 2023 Integrated Inspection Report 05000387/2022004 and 05000388/2022004 IR 07200028/20220012022-12-15015 December 2022 Independent Spent Fuel Storage Installation (ISFSI) - NRC Inspection Report No. 07200028/2022001 IR 05000387/20224032022-11-29029 November 2022 Security Baseline Inspection Report 05000387/2022403 and 05000388/2022403 IR 05000387/20225012022-11-28028 November 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000387/2022501 and 05000388/2022501 IR 05000387/20220032022-11-0808 November 2022 Integrated Inspection Report 05000387/2022003 and 05000388/2022003 IR 05000387/20220052022-08-31031 August 2022 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2022005 and 05000388/2022005) IR 05000387/20220102022-08-11011 August 2022 Biennial Problem Identification and Resolution Inspection Report 05000387/2022010 and 05000388/2022010 IR 05000387/20224012022-08-11011 August 2022 Material Control and Accounting Program Inspection Report 05000387/2022401 and 05000388/2022401 (Cover Letter Only) IR 05000387/20220022022-08-0404 August 2022 Integrated Inspection Report 05000387/2022002 and 05000388/2022002 IR 05000387/20224042022-05-26026 May 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000387/2022404 and 05000388/2022404 IR 05000387/20220012022-05-0909 May 2022 Integrated Inspection Report 05000387/2022001 and 05000388/2022001 IR 05000387/20220112022-03-0707 March 2022 Post-Approval Site Inspection for License Renewal - Phase 2 Inspection Report 05000387/2022011 IR 05000387/20210062022-03-0202 March 2022 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2021006 and 05000388/2021006) IR 05000387/20224022022-02-16016 February 2022 Security Baseline Inspection Report 05000387/2022402 and 05000388/2022402 IR 05000387/20214032022-02-11011 February 2022 Cyber Security Problem Identification and Resolution Inspection Report 05000387/2021403 and 05000388/2021403 (Cover Letter Only) IR 05000387/20210042022-02-11011 February 2022 Integrated Inspection Report 05000387/2021004 and 05000388/2021004 IR 05000387/20220132022-02-10010 February 2022 Information Request for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000387/2022013 and 05000388/2022013 IR 05000387/20210102021-12-13013 December 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000387/2021010 and 05000388/2021010 IR 05000387/20210112021-11-0404 November 2021 Temporary Instruction 2515/194 Inspection Report 05000387/2021011 and 05000388/2021011 IR 05000387/20210032021-11-0303 November 2021 Integrated Inspection Report 05000387/2021003 and 05000388/2021003 IR 05000387/20214012021-10-25025 October 2021 Security Baseline Inspection Report 05000387/2021401 and 05000388/2021401 IR 05000387/20214022021-09-23023 September 2021 Security Baseline Inspection Report 05000387/2021402 and 05000388/2021402 IR 05000387/20213012021-09-17017 September 2021 Initial Operator Licensing Examination Report 05000387/2021301 and 05000388/2021301 IR 05000387/20210052021-09-0101 September 2021 Updated Inspection Plan for the Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2021005 and 05000388/2021005) ML21224A2402021-08-24024 August 2021 Security Baseline Inspection Report Cover Letter 2021 FOF IR 05000387/20210022021-08-0404 August 2021 Integrated Inspection Report 05000387/2021002 and 05000388/2021002 IR 05000387/20210012021-05-0505 May 2021 Integrated Inspection Report 05000387/2021001 and 05000388/2021001 IR 05000388/20210122021-03-0404 March 2021 EA-20-131: Susquehanna Steam Electric Station, Unit 2 - NRC Investigation Report No. 1-2020-001 and NRC Inspection Report No. 05000388/2021012 IR 05000387/20200062021-03-0303 March 2021 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2020006 and 05000388/2020006) IR 05000387/20204032021-02-10010 February 2021 Cyber Security Problem Identification and Resolution Inspection Report 05000387/2020403 and 05000388/2020403 (Cover Letter Only) IR 05000387/20200042021-02-0808 February 2021 Integrated Inspection Report 05000387/2020004 and 05000388/2020004 IR 05000387/20205012020-11-18018 November 2020 Emergency Preparedness Biennial Exercise Inspection Report 05000387/2020501 and 05000388/2020501 IR 05000387/20200032020-11-0505 November 2020 Integrated Inspection Report 05000387/2020003 and 05000388/2020003 IR 05000387/20200122020-10-27027 October 2020 Triennial Fire Protection Inspection Report 05000387/2020012 and 05000388/2020012 IR 05000387/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Reports 05000387/2020005 and 05000388/2020005) 2024-08-29
[Table view] Category:Letter
MONTHYEARML24289A1252024-10-22022 October 2024 – Authorized Alternative to Requirements of the ASME OM Code PLA-8145, Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-81452024-10-21021 October 2024 Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-8145 ML24291A1562024-10-16016 October 2024 Missed Annual Inventory Required by 40 CFR 266, Subpart in PLE 0026645 PLA-8148, Registration for the Use of Spent Fuel Storage Casks 311, 308, and 3102024-10-15015 October 2024 Registration for the Use of Spent Fuel Storage Casks 311, 308, and 310 PLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 PLA-8142, Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-81422024-09-18018 September 2024 Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-8142 ML24260A2312024-09-17017 September 2024 Senior Reactor and Reactor Operator Initial License Examinations 05000387/LER-2024-002, B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor2024-09-16016 September 2024 B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24233A2192024-09-0303 September 2024 – Authorized Alternative to Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR 05000387/20240052024-08-29029 August 2024 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2024005 and 05000388/2024005) 05000387/LER-2023-004-01, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-08-26026 August 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum 05000387/LER-2024-001-01, Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear2024-08-21021 August 2024 Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear IR 05000387/20240022024-08-12012 August 2024 Integrated Inspection Report 05000387/2024002 and 05000388/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) ML24197A0982024-07-15015 July 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000387/2024010 and 05000388/2024010 PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 ML24127A2262024-05-29029 May 2024 Issuance of Amendment Nos. 288 and 272 Adoption of TSTF-563 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) 05000387/LER-2024-001, Main Steam Isolation Valve Leakage2024-05-23023 May 2024 Main Steam Isolation Valve Leakage PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) IR 05000387/20240012024-05-13013 May 2024 Integrated Inspection Report 05000387/2024001 and 05000388/2024001 IR 05000387/20244042024-05-0707 May 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000387/2024404 and 05000388/2024404 PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure ML24082A1372024-04-22022 April 2024 Issuance of Amendment Nos. 287 and 271 Adoption of TSTF-568, Revision 2 and Associated Technical Specification Changes PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) ML24092A4022024-04-0101 April 2024 Annual Financial Report (PLA-8098) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance ML24067A2512024-03-19019 March 2024 Authorized Alternative to Requirements of the ASME Code ML24044A2532024-03-14014 March 2024 Associated Independent Spent Fuel Storage Installation – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0077 (Security Notifications, Reports, and Recordkeeping & Suspicious Activity Reporting)) IR 05000387/20240112024-02-29029 February 2024 Commercial Grade Dedication Inspection Report 05000387/2024011 and 05000388/2024011 IR 05000387/20230062024-02-28028 February 2024 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2023006 and 05000388/2023006) ML24039A1882024-02-27027 February 2024 Issuance of Amendment Nos. 286 and 270 Changes to Technical Specifications for Control Rods ML24037A3072024-02-22022 February 2024 Summary of Regulatory Audit in Support of Relief Request 5RR-02 PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) IR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 05000387/LER-2023-004, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-01-0909 January 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8088, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088)2023-12-0505 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088) 2024-09-06
[Table view] |
Text
ber 12, 2019
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - DESIGN BASIS ASSURANCE INSPECTION (TEAMS) INSPECTION REPORT 05000387/2019011 AND 05000388/2019011
Dear Mr. Berryman:
On October 10, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Susquehanna Steam Electric Station, Units 1 and 2 and discussed the results of this inspection with Mr. Kevin Cimorelli, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Mel Gray, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 05000387 and 05000388 License Nos. NPF-14 and NPF-22
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000387 and 05000388 License Numbers: NPF-14 and NPF-22 Report Numbers: 05000387/2019011 and 05000388/2019011 Enterprise Identifier: I-2019-011-0023 Licensee: Susquehanna Nuclear, LLC Facility: Susquehanna Steam Electric Station, Units 1 and 2 Location: Berwick, PA Inspection Dates: September 15, 2019 to October 5, 2019 Inspectors: E. Burket, Senior Reactor Inspector J. Kulp, Senior Reactor Inspector M. Orr, Reactor Inspector S. Pindale, Senior Reactor Inspector M. Yeminy, NRC Mechanical Contractor W. Hopf, NRC Electrical Contractor Approved By: Mel Gray, Chief Engineering Branch 1 Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a design basis assurance inspection (teams) inspection at Susquehanna Steam Electric Station, Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations No findings or violations of more than minor significance were identified.
Additional Tracking Items None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
===71111.21M - Design Bases Assurance Inspection (Teams)
The inspectors evaluated the following components and listed applicable attributes, permanent modifications, and operating experience during the weeks of September 16, 2019, and September 30, 2019.
For the components, the team reviewed the attributes listed in IP 71111.21M, Appendix A, Component Review Attributes, such as those listed below. Specifically, the team evaluated these attributes as per 71111.21M, Appendix B, Component Design Review Considerations and 71111.21M, Appendix C, Component Walkdown Considerations.
Design Review - Risk-Significant/Low Design Margin Components (IP Section 02.02)
=
Main article: IP 71111.21
- (1) 125 Vdc Load Center, 1D622 (EP-BS-1D622)
Material condition and configuration (reviewed periodic inspection results)
Normal, abnormal, and emergency operating procedures Environmental qualification classification Protection against seismic events Surveillance testing and recent results Maintenance effectiveness Consistency between station documentation (e.g., procedures) and vendor specifications Translation of vendor specifications Electrical design calculations System health report and operational history Component health, corrective maintenance records, and corrective action history The team used Appendix B guidance for Valves, Instrumentation, Electric Loads, and As-Built System
- (2) 'A' Emergency Diesel Generator (Electrical), 0G501A Material condition and installed configuration (e.g., visual inspection/walkdown)
Normal, abnormal, and emergency operating procedures Consistency among design and licensing bases and other documents and procedures System health report, maintenance effectiveness and records, and corrective action history Control logic Design calculations Surveillance testing and recent test results Adequacy of electrical power supply for motor and controls Protection coordination; Load in-rush and full load current Range, accuracy, and setpoint of installed instrumentation Equipment protection from fire, flood, and water intrusion or spray Heat removal cooling water and ventilation Energy sources, fuel and air (e.g., engine start, operation, and control)
Contactor and fuse ratings; Component adequacy for minimum voltage The team used Appendix B guidance for Valves, Instrumentation, Electric Loads, and As-Built System.
- (3) B Emergency Service Water Pump, 0P504B Material condition and installed configuration (e.g., visual inspection/walkdown)
Normal, abnormal, and emergency operating procedures Consistency among design and licensing bases and other documents and procedures System health report, maintenance effectiveness and records, and corrective action history Control logic Equipment/environmental controls and qualification Operator actions Design calculations Surveillance testing and recent test results Range, accuracy, and setpoint of installed instrumentation Equipment protection from fire, flood, and water intrusion or spray Heat removal cooling water and ventilation Pump Net positive Suction Head and Vortex considerations Pump interaction with sister pumps The team used Appendix B guidance for Valves, Instrumentation, Electric Loads, and As-Built System.
- (4) Unit 1 Reactor Core Isolation Cooling Pump and Turbine Material condition and installed configuration (e.g., visual inspection/walkdown)
Normal, abnormal, and emergency operating procedures Consistency among design and licensing bases and other documents and procedures System health report, maintenance effectiveness and records, and corrective action history Equipment/environmental controls and qualification Operator actions Design calculations Surveillance testing and recent test results Range, accuracy, and setpoint of installed instrumentation Equipment protection from fire, flood, and water intrusion or spray Heat removal cooling water and ventilation Energy sources, fuel and air (e.g., engine start, operation, and control)
The team used Appendix B guidance for Valves, Instrumentation, Electric Loads, and As-Built System.
Design Review - Large Early Release Frequency (LERFs) (IP Section 02.02) (2 Samples)
- (1) Unit 1 Tie Bus 0A106 Material condition and configuration (review periodic inspection results)
Normal, abnormal, and emergency operating procedures Environmental qualification classification Surveillance testing and recent results Maintenance effectiveness Consistency between station documentation (e.g., procedures) and vendor specifications Translation of vendor specifications Electrical design calculations System health report and operational history Component health, corrective maintenance records, and corrective action history The team used Appendix B guidance for Valves, Instrumentation, Electric Loads, and As-Built System.
- (2) Unit 1 Residual Heat Removal Suppression Pooling Cooling/Test Control Valve, HV151F024A Material condition and installed configuration (e.g., visual inspection/walkdown)
Normal, abnormal, and emergency operating procedures Consistency among design and licensing bases and other documents and procedures System health report, maintenance effectiveness and records, and corrective action history Control logic Equipment/environmental controls and qualification Operator actions Design calculations Surveillance testing and recent test results Range, accuracy, and setpoint of installed instrumentation Equipment protection from fire, flood, and water intrusion or spray Heat removal cooling water and ventilation The team used Appendix B guidance for Valves, Instrumentation, Electric Loads, and As-Built System.
Modification Review - Permanent Mods (IP Section 02.03) (4 Samples)
- (1) EC 1923863, Replace Unit 1 Service Water Valves, HV11024A3 and HV11024B3
- (2) EC 2002457, Instrument Air Design Pressure Increase
- (3) EC 1865356, 2x210 ESS Load Center Transformer Replacement
- (4) EC-023-1007, Fuel Oil Consumption Rates for 'A' - 'D' and 'E' Emergency Diesel Generators Review of Operating Experience Issues (IP Section 02.06) (2 Samples)
- (1) OpESS 2007/02, Revision 3, Analysis of Flooding Vulnerabilities
- (2) OpESS 2008-01, Negative Trend and Recurring Events involving Emergency Diesel Generators
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On October 4, 2019, the team presented the preliminary results of the Design Bases Assurance Inspection to Mr. Kevin Cimorelli, Site Vice President, and other members of the licensee staff. After further in-office review, the final results of this inspection were presented to Mr. Cimorelli and other licensee staff via telephone on October 10, 2019.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.21M Calculations EC-023-1012 Evaluate Impact of Use of Biodiesel (B5) and Ultra-Low Revision 3
Sulfur Diesel Fuel on the Diesel Generator Fuel Oil Storage
and Transfer System
EC-024-0012 Modify Emergency Diesel Generator Over-Voltage Relays Revision 0
EM1,
EC-024-0629 SSES FSAR 8.3 Diesel Generator Loading Tables Updates Revision 18
EC-024-1029 Evaluation of EDG Frequency Response During Design Revision 0
Basis LOOP/LOCA Transient Loading with Replacement
Woodward 2301A Governor
EC-028-0010 ESW Pump Structure Heat Gain Revision 2
EC-054-0538 NPSH Calculation for ESW Pumps Revision 0
EC-FLOD-0001 Internal Flooding Evaluations for Moderate Energy Pipe Revision 0
Cracks and Sprinkler System Actuations
EC-FLOD-0001 Internal Flooding Evaluations for Moderate Energy Pipe Revision 3
Cracks and Sprinkler System Actuations
EC-FLOD-0001 Internal Flooding Evaluations for Moderate Energy Pipe Revision 4
Cracks and Sprinkler System Actuations
EC-FLOD-0001 Internal Flooding Evaluations for Moderate Energy Pipe Revision 5
Cracks and Sprinkler System Actuations
EC-PUPC-20309 EPU Task Report T0309, Reactor Core Isolation Cooling Revision 0
System
EC-SOPC-0597 Relay Setting Calculations for Diesel Generator ABCD Sync Revision 1
Corrective Action AR-2016-09219
Documents AR-2016-09451
AR-2016-12920
AR-2017-01015
CR 2016-08441
CR 2017-13061
CR 2018-06820
CR 2019-11984
CR 2019-11994
CR-2016-08172
Inspection Type Designation Description or Title Revision or
Procedure Date
CR-2016-12235
CR-2016-12238
CR-2018-17000
Corrective Action CR-2019-11742
Documents CR-2019-11752
Resulting from CR-2019-11801
Inspection CR-2019-11816
CR-2019-11918
CR-2019-11926
CR-2019-11993
CR-2019-12188
CR-2019-12283
CR-2019-12357
CR-2019-12362
CR-2019-12410
CR-2019-12525
CR-2019-12698
Drawings E-148 Unit 1 RBCCW Transfer SOVs Revision 16
E106216, Sh. 1 Emergency Service Water System Revision 51
E107158, Sh. 1 Unit 1 and 2 Single Line Diagram Station Revision 40
FF105801, Sh. Common DG Control Schematic, Shutdown and Alarm Revision 15
2411 System for OC521A
M-110 Unit 1 Service Water Revision 45
P-25-5, Sheet 1 Drainage Reactor Building Unit #1 Area 25 Plan Of Elevation Revision 13
749
P-27-5, Sheet 1 Drainage Reactor Building Unit #1 Area 25 Plan Of Elevation Revision 10
749
P-28-5, Sheet 1 Drainage Reactor Building Unit #1 Area 25 Plan Of Elevation Revision 9
749
P-29-5, Sheet 1 Drainage Reactor Building Unit #1 Area 25 Plan Of Elevation Revision 8
749
Engineering EC-002-0500 125 VDC System 1D620 Master Battery Calculation Revision 38
Changes EC-088-0530 Evaluation of Overvolt-250/125 VDC 1E Equip Revision 6
Inspection Type Designation Description or Title Revision or
Procedure Date
Engineering CR Evaluation/Action Plan Report for CR 923407 Revision 2
Evaluations
Miscellaneous BMR E121 Material Requisition Direct Current Control Centers and Revision 23
Load Centers
DBD-10 Design Basis Document for HELB/MELC/Internal Flooding Revision 3
IOM 1282 Tricentric Service Manual Revision 7
M1441-29 Flush/Check Floor Drains (Pre-Outage), dated
February 15,
2018
M2139-01 RCIC Turbine, 1S212 005 for Turbine Internal Inspection dated
4/14/16
SO-150-002 Quarterly RCIC flow verification dated 5/2/18
Procedures NDAP-QA-0343 Time Critical and Time Sensitive Operator Actions Revision 4
OP-003-001 13.8 kV Common Electrical Equipment Revision 20
OP-102-001 125V DC System Revision 27
OP-111-001 Unit 1 Service Water System Revision 52
OP-150-001 RCIC System Revision 50
OT-150-004 RCIC Turbine overspeed trip testing Revision 1
Work Orders 1837564
1863850
2108859