IR 05000387/2019410

From kanterella
Jump to navigation Jump to search
Baseline Security Inspection Report 05000387/2019410 and 05000388/2019410 (Letter Only)
ML19079A229
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/19/2019
From: Fred Bower
Plant Support Branch 1
To: Berryman B
Susquehanna
Bower F
References
IR 2019410
Download: ML19079A229 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION rch 19, 2019

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 -

BASELINE SECURITY INSPECTION REPORT 05000387/2019410 AND 05000388/2019410

Dear Mr. Berryman:

On February 14, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Susquehanna Steam Electric Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

NRC inspectors documented one finding of very low security significance (Green) in this report.

This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at Susquehanna Steam Electric Station.

The violation was assigned a cross-cutting aspect in the area of Human Performance, Field Presence, because Susquehanna failed to ensure that supervisors in the field are engaged in observing, coaching, and reinforcing standards and expectations (H.2).

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I and the NRC resident inspector at Susquehanna Steam Electric Station.

Enclosure transmitted herewith contains Sensitive, Unclassified, Non-Safeguards Information. When separated from the Enclosure, the transmittal document is decontrolled. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRCs Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Fred L. Bower, III, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-387 and 50-388 License Nos. NPF-14 and NPF-22 Enclosure:

Non-Public Inspection Report 05000387/2019410 and 05000388/2019410 cc w/o encl: w/o Rpt:

Distribution via ListServ cc w/encl: w/Rpt.

J. Gorman, Manager, Emergency Planning and Nuclear Security D. Allard, Director, PA DEP ML19049A229 (Cover letter)

ADAMS ACCESSION NUMBER: ML19079A247 (Cover letter w/enclosure)

Cover Letter Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available Cover Letter w/ Enclosure Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS RI/DRP RI/DRS NAME S McCarver/SCM K Hussar/KH J Cherubini/JCC J Grieves/JEG F Bower/FLB DATE 03/06/2019 03/05/2019 03/19/2019 03/06/2019 03/19/2019