IR 05000382/1993016
| ML20046A411 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 07/22/1993 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Barkhurst R ENTERGY OPERATIONS, INC. |
| References | |
| NUDOCS 9307280053 | |
| Download: ML20046A411 (4) | |
Text
{{#Wiki_filter:_.
_ . _.
._.
.. _ _ _ . ' - . - UNITED STATES '
p QEco , . NUCLEAR REGULATORY COMMISSION
[ j.. -,3 , j REGION IV - . - '# 611 RYAN PLAZA DRIVE. SUITE 400 - o, [ - ARLINGTON, TEXAS 76011-8064 .<, ..... n 22 a , L , . ! l Docket: 50-382 j j License: NPF-38 l i-
d j Entergy' Operations, Inc.
ATTN: Ross P. Barkhurst, Vice President ' i Operations, Waterford P.O. Box B - l Killona, Louisiana 70066 a j SUBJECT: NRC INSPECTION REPORT 150-382/93-16
Thank you for your _ letter of July 9,1993, in response to our letter and
<
Notice of Violation dated June 9,1993. LWe have reviewed your reply and find i
j it responsive to the concerns raised in our Notice of Violation'. We will- , . review the implementation of your corrective actions during a future
inspection to determine that full compliance has been achieved and will be j maintained.
j
Sincerely, i } b YW . Bill Beach, Dir.
DivisionofReacto'[ctor Projects cc: Entergy.0perations, Inc.
ATTN: Harry W. Keiser, Executive Vice President & Chief Operating Officer P.O. Box 31995 Jackson, Mississippi 39286-1995 Entergy Operations, Inc.
ATTN: John R. McGaha, Vice President Operations Support P.O. Box 31995 . Jackson, Mississippi 39286 9307280053 930722 7 PDR ADOCK:05000392 G PDR: l / a - / \\. -v
-._.
_ _ - . . i Entergy Operations, Inc.
-2-Wise, Carter, Child & Caraway ATTN: Robert B. McGehee, Esq.
- l P.O. Box 651 Jackson, Mississippi 39205 Entergy Operations, Inc.
ATTN: D. F. Packer, General Manager Plant Operations P.O. Box B Killona, Louisiana 70066 Entergy Operations, Inc.
ATTN: L. W. Laughlin Licensing Manager P.O. Box B Killona, Louisiana 70066 Chairman Louisiana Public Service Commission One American Place, Suite 1630 Baton Rouge, Louisiana 70825-1697 Entergy Operations, Inc.
ATTN: R. F. Burski, Director i Nuclear Safety
P.O. Box B Killona, Louisiana 70066 Hall Bohlinger, Administrator Radiation Protection Division P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 Parish President St. Charles Parish P.O. Box.302 l Hahnville, Louisiana 70057 Mr. William A. Cross Bethesda Licensing Office 3 Metro Center Suite 610 Bethesda, Maryland 20814 Winston & Strawn ' ATTN: Nicholas S. Reynolds, Esq.
1400 L Street, N.W.
Washington, D.C.
20005-3502 , r ~., ,y ,., -.- - -we , ,n, ,n.
- - - -,,
i
, ' . l Entergy Operations, Inc.
-3-JUL 2 21993 bcc to DMB (IE01) bcc distrib. by RIV: J. L. Milhoan Resident Inspector Section Chief (DRP/D) Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS RIV File Project Engineer (DRP/D) Section Chief (DRP/TSS) i ^
RIV:DRP/D g C:DRP/D W [J( )f pj[ WBJones;df hStetka f[ [hkhh
7/2'L/93 7/2Z/93 k y/93 h
.. _ _. ..__. . _ _.. _ _. _ - _ _ _ _ _ . - _ - _ , i O 9-;. ! Entergy Operations, Inc.
-3- - R 22 M u .L [ BEE loCD"'B (I$01)1 E' j M N' - 1 bec distrib. by RIV
J. L. Milhoan Resident Inspector.- .MNBB 4503 i - i Section Chief (DRP/D) Lisa Shea, RM/ALF, MS: MIS System DRSS-FIPS.
RIV File Project Engineer-(DRP/D) Section Chief (DRP/TSS) j i ! i ' r , , r i i l , i i I . n ' . RIV:DRP/D g C:DRP/D n [J)(4[
WBJones;df kStetka f[ [hlkhN 7/Z'L/93 7/'21/93 k M/93h , -- , , - --,,, -, + r,-m,-- ,,~m....--..~,--.....,w-------
.
" " " " " " " " " ' ENTERGY . . - . 't. F. 2ursui W3F1-93-0160 ' g.g g g < A4.05 PR July 9, 1993 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Subject: Waterford 3 SES Docket No. 50-382 License No. NPF-38 NRC Inspection Report 93-16 Reply to Notice of Violation Gentlemen: In accordance with 10CFR2.201, Entergy Operations, Inc. hereby submits in Attachment I the response to the violation identified in Appendix A of the subject inspection Report.
If you have any questions concerning this response, please contact B. Ronda Loetzerich at (504) 739-6636.
Very truly yours, ,
R.F. Burski Director Nuclear Safety RFB/BRL/ssf Attachment cc: J.L. Milhoan (NRC Region IV), D.L. Wigginton (NRC-NRR), R.B. McGehee, N.S. Reynolds, NRC Resident Inspectors Office [[Th 7 /M J J m 1 S' lb Y 7,,,e / s t.7,(J j - 7 v/ - i
. Attachment to - W3F1-93-0160 Page 1 of 2 , ' . ATTACHMENT 1 ENTERGY OPERATIONS. INC. RESPONSE TO THE VIOLATION IDENTIFIED IN APPENDIX A 0F NRC INSPECTION REPORT 93-16 VIOLATION 9316-01 During.an NRC inspection conducted on Apri1~4 through May 15, 1993. a violation of NRC requirements was' identified.
In accordance with the." General Statement of Policy and Procedure for NRC Enforcement' Actions," 10 CFR Part 2 Appendix C, the violation is listed below:
. Technical Specification 6.8.1.c requires that written procedures be' established, implemented, and maintained covering surveillance and test
activities of safety related equipment.
Section 3.2 of Surveillance Procedure OP-903-005, Revision 7, " Control Element Assembly Operability. Check," requires, in part, that, if _any.
control element assembly (CEA) is noted to be immovable at any time during the performance of the test, then refer to Off-Normal Procedure OP-901-102, "CEA or CEDMCS Malfunction".
Contrary to the above, on May ll, 1993, operators failed to refer to Off-Normal Procedure OP-901-102, upon determining that part-length CEA 28 was immovable during the perfo~rmance of Surveillance Procedure OP-903-005.
This is a Severity Level IV violation (Supplement I) (382/9316-01) l l RESPONSE (1) Reason for the Violation Entergy Operations, Inc. admits this violation and believes that the root cause is inappropriate action by the Control Room Supervisor (CRS) for the failure to communicate his actions concerning the use of an Off Normal procedure to the Shift Supervisor and control room crew.
i . i i
__ _ _ ' Attachment to
W3F1-93-0160 Page 2 of 2 . On May 11, 1993, Surveillance Procedure OP-903-005, " Control Element Assembly Operability Check" was scheduled to be performed in accoruance with the requirements of Technical Specification 4.1.3.1.2.
Section 4.0, " Initial Conditions", of OP-903-005, requires that a pre-briefing be performed prior to commencement of the surveillance test.
The CRS conducted a pre-briefing which included-a review of applicable Technical Specifications, and Off-Normal Procedure OP-901-102, "CEA or CEDMCS Mal functi on". During the performance of OP-903-005, operators determined that part-length CEA 28 would not move. Operators declared the CEA inoperable, . entered Technical Specification 3.1.3.1 and determined that no action was required.
Upon further review of OP-901-102, the CRS determined that all the requirements of the Off-Normal procedure were being satisfied, and chose not to formally enter the Off-Normal procedure.
The CRS did not report this action in the Station Logs or to other members of the Control Room Staff.
It is believed that, if the CRS had properly communicated his decision not to. enter the Off-Normal procedure to the Shift Supervisor or the operating crew, a conscious decision would have been made to report such action in the Station Logs.
(2) Corrective Steps That Have Been Taken and the Results Achieved Upon identification of the failure described by this violation, immediate actions were taken to confirm that the actions taken by the , Control Room Staff satisfied the requirements of the Off-Normal procedure with respect to an immovable CEA.
In addition, Condition Report number CR-93-083 was written and entered into the Waterford 3 Corrective Action Program.
(3) Corrective Steps Taken to Avoid Further Violations i The Operations Department personnel will review this event via required j reading and the Operations Superintendent will discuss this event with l Licensed Operators during requalification training.
(4) Date When Full Compliance Will Be Achieved Full compliance will be achieved by October 1, 1993.
. - - - - . -. - - -., }}