Forwards Corrected Version for NRC Insp Rept 50-382/93-03, Stating Closure of LER 382/92-009
ML20035A951
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/25/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Barkhurst R
ENTERGY OPERATIONS, INC.
References
NUDOCS 9303300275
Download: ML20035A951 (5)


Text

~

3 RECO

UNITE D STATES

g".

.%

NUCLEAR REGULATORY COMMISSION

-

.[l A(

j REGION f V o.k e I!

%{@g[8

611 RYAN PLAZA DRIVE. SUITE 400 AR LINGTON, T EXAS 76011-8064

ME 251993 i

Docket:

50-382

License: NPF-38 i

Entergy Operations, Inc.

}

ATTN:

Ross P. Barkhurst, Vice President Operations, Waterford P.O. Box B Killona, Louisiana 70066 SUBJECT: CORRECTION TO NRC INSPECTION REPORT 50-382/93-03

-

l This forwards a corrected page 10 for NRC Inspection Report 50-382/93-03, dated March 15, 1993. The original page 10 incorrectly stated that Licensee Event Report (LER) 382/92-003 had been closed.

It should have stated that LER 382/92-009 was closed.

Sincerely,

'

.)

~

A. Bill Beach, Director Division of Reactor Projects Attachment:

page 10 cc w/ attachment:

Entergy Operations, Inc.

ATTN:

Donald C. Hintz, President

& Chief Operating Officer P.O. Box 31995 Jackson, Mississippi 39286 Entergy Operations, Inc.

ATTN: John R. McGaha, Vice President Operations Support P.O. Box 31995 Jackson, Mississippi 39286

+

O 9303300275 930325

/!

'

PDR ADOCK 05000382

\\

,

G PDR

\\

.

.

.

-

.

En'tergy Operations, Inc.

-2-Wise, Carter, Child & Caraway ATTN: Robert.B. McGehee, Esq.

.

'

P.O. Box 651 Jackson, Mississippi 39205

{

Entergy Operations, Inc.

l ATTN:

D. F. Packer, General

Manager Plant Operations P.O. Box B

,

'

Killona, Louisiana 70066

Entergy Operations, Inc.

j ATTN:

L. W. Laughlin Licensing Manager

'

P.O. Box B

'

Killona, Louisiana 70066 t

Chairman

!

Louisiana Public Service Commission

!

'

One American Place, Suite 1630 Baton Rouge, Louisiana 70825-1697 j

I Entergy Operations, Inc.

ATTN:

R. F. Burski, Director

.

Nuclear Safety

P.O. Box B i

Killona, Louisiana 70066 j

Hall Bohlinger, Administrator-l Radiation Protection Division P.O. Box 82135-Baton Rouge, Louisiana 70884-2135 Parish President St. Charles Parish

!

P.O. Box 302 i

Hahnville, Louisiana 70057 l

l Mr. William A. Cross Bethesda Licensing Office l

3 Metro Center

Suite 610

-

Bethesda, Maryland 20814

,

Winston & Strawn I

ATTN:

Nicholas' S. Reynolds,' Esq.

!

1400 L Street, N.W.

l Washington, D.C.

20005-3502

]

.

-!

-.

!

.

..

e

..

.

l

.

..

,

.

~

~

.

,

-10-receiving starting air. This procedure revision allows the "curning gear engaged" lockout feature to be tested as required by the TS.

7 FOLLOWUP (92701)

,

7.1 (Closed) Inspector Followup Item 382/9131-02:

Followup on Special Test Required in Response to Maintenance on EDG A This item was opened to follow up on the results of a special pressure test the licensee intended to do in an attempt to identify the source of moisture emitting from the crankcase vent or. EDG A on January 16, 1992.

The~ licensee

'

later observed water leakage around one of the two cylinder head studs on the

'

exhaust side of the head.

It was determined that left Cylinder 5 was the source of the leakage. The licensee replaced the cylinder head using WA 01086706. This resolved the moisture problem, making the pressure test

unnecessary. The leaking cylinder head that was removed was sent to Cooper-Bessemer for analysis. Cooper-Bessemer determined that the cause of leakage was a leaking water jumper on the head close to the stud in question.

j 8 ONSITE REVIEW OF LICENSEE EVENT REPORTS (92700)

,

8.1 (Closed) LER 382/91-005:

Shutdown Cooling Malfunction due to Ineffective Work Controls A Notice of Violation (VIO 382/9117-01 and -02) was issued in response to this event. The licensee took satisfactory corrective action and appropriately reported the event in this LER.

The violations were closed in NRC Inspection.

,

Report 50-382/92-26 based en the licensee's response to the Notice of

'

Violation.

8.2 (Closed) LER 382/92-009:

Surveillance Interval Exceeded as a Result of Inadeauate Administrative Control This report addressed the licensee exceeding the surveillance interval for the broad range gas detection system channel calibrations specified by TS 4.3.3.7.3.

The root cause was determined to be inadequate administrative control. The licensee's corrective action was to assign the responsibility for tracking the completion of weekly surveillances to the duty I&C maintenance superintendent and to require that the completion of weekly TS surveillances be tracked by the control room staff in accordance with

'

Operations Procedure OP-903-001, Revision 13, " Technical Specification Surveillance Logs." The first action was completed in October 1992, the e

latter in January 1993.

i l

..

.

.

'

.

MAR 25 l993

~

Entergy Ope,4. ons, Inc.

-3-

,

,

bcc to DMB (IE01)

bcc distrib. by RIV:

J. L. Milhoan Resident Inspector Section Chief (DRP/D)

DRP

.

MNBB 4503 MIS System Lisa Shea, RM/ALF, MS:

DRSS-FIPS RIV File

!

Project Engineer (ORP/D)

Section Chief (DRP/TSS)

DRS

.

i I

,

RIV:DRP/D bb C:DRP/0,f D:MRP MASatoriusMf TFStetka AdBhb 3/V /93 3/93/93 3/I5 /93

/

.

.

.

-

s

.

.

-

. _... _ _

Entergy Operations, Inc.

-a -

bcc to DMB.(IE01)

bec distrib. by RIV:

J. L. Milhoan Resident Inspector DRP Section Chief (DRP/D)

Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS RIV File Project Engineer (DRP/0)

Section Chief (DRP/TSS)

DRS 300061 RIV:DRP/D hf C:DRP/D D:4RP un e,. --,.. A uc.. & J