Text
_ _
. _ _ _ __-_____- _ __-__ __- - - _-__-_ -
.
.
.
U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Reports No. 50-373/87021(DRSS); 50-374/87021(DRSS)
Docket Nos. 50-373; 50-374 Licenses No. NPF-11; NPF-18 Safeguards Group IV Licensee:
Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name:
LaSalle County Station, Units 1 and 2 Inspection At:
LaSalle County, Illinois Type of Inspection:
Unannounced Physical Security Dates of Inspection:
August 3-7, 1987 Dates of Previous Physical Security Inspection:
March 2-6 and 10, 1987 Inspectors: hw R' b% /4 tlKl47 Terry J. Madeda
Date Physical Security Inspector hw R bA flJ r/4'7 JMmes R. Kniceley Date
'
Physical Security Inspector Accompanying Inspector:
MJa/a,d '
g/Jg/M7 David M. Galanti Dat6
'
Physical Security Inspector Approved By:
8/8 87 ames R. Creed, Chief IT5te afeguards Section Inspection Summary Inspection on August 3-7, 1987 (Reports No. 50-373/87021(DRSS); 50-374/87021(DRSS))
Areas Inspected:
Included a review of the licensee's actions on previous inspection findings:
Management Effectiveness - Security Program; Security Plan and Implementing Procedures; Security System Power Supply; Access Control - Personnel, Packages and Vehicles; and Safeguards Contingency Plan Implementation Review.
The inspection was conducted by three NRC inspectors and the inspection was initiated during the day shift-Enclosure SAFEGUARDS a ns B709010042 970g25 Upon separat on gDR ADOCK 0500
page IS Decontrol ed
.
..
Results:
The licensee was found to be in compliance with NRC requirements within the areas examined, except as noted below:
Access Control - Personnel:
The licensee failed to adequately implement personnel escort procedures as required by the Security Plan (refer to Section 6 of the Report Details).
Additionally, four previously identified inspection findings were closed.
Two open items pertaining to vehicle searches and vegetation in the protected area were identified.
Enclosure contains SAFEGU;,RDS Ifl FORMATION
Upon separation this Page is Decontrolled
..
_ - _ _ _ - _
_ _ _ _ _ _ _ _
..
.
.
.
.
g
0
..
.
l
-
'
f%
.a s '
'I *W./
g s,
,
<.,
N g
,
.
f
-
t-d}
t a
(k Q.s'
1,
.; $, tt t*
'
,
,-
,._3
>
,- - :.
.P.
.
,J
,, Y
$
'h ).
A,f-m
.I
/,,
Y.
$k b
,
o A /
.,....}.-y<\\'
EY t/
s.
i i
..,
s'Q,_,S/'
,'
O O
-