UNITED STATES 8'
'n NUCLEAR REGULATORY COMMISSION
- e REGION il n
$
101 MARIETTA ST., N.W., SUITE 3100
%
ATLANTA, GEORGIA 30303
.....
ort No. 50-370/80-13 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Facility Name: McGuire Unit 2 Docket No. 50-370 Licensee No. CPPR-84 Inspection at McGuire Site near Charlotte, North Carolina-r,
.
,
Inspector:
/-
'
T. D. Gibbons Date Signed Approyed by en 9 - f - 70 T. E. Conlon, Section Chief, RCES Branch Date Signed SUMMARY Inspection on August 19-22, 1980 Areas Inspected This routine, unannounced inspection involved 28 inspector-hours onsite in the areas of electrical cables and terminations work and work activities, inspector followup item and independent inspection.
'
Results Of the 2 areas inspected, no items of noncompliance or deviations were identified in 1 area; 1 item of noncompliance was found in 1 area (Infraction - modification of safety related motors without approved drawings paragraph 5).
8010280 g
,
,,
--
-
-
.-
-
6
'
a l
a
$
DETAILS 1.
Persons Contacted Licensee Employees
- J. C. Rogers, Project Manager
'
- T. E. Touchstone, Senior Construction Engineer
- E. B. Miller, Project Senior QA Engineer
- R. H. Ledford, QA Engineer
)
l NRC Resident Inspector T. Donat
- Attended exit interview 2.
Exit Interview The inspection scope and findings were summarized on August 22, 1980 with those persons identified in Paragraph I above. The item of noncompliance identified in paragraph 5 was discussed in depth.
Licensee Action on Previous Inspection Findings Not inspected.
'
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Independent Inspection Effort The inspector examined several fire extinguishers for evidence of periodic inspection.
Two extinguishers were observed to be beyond the monthly inspection period. The licensee stated that the extinguishers were not in
-
the required locations and therefore missed by the inspection. The item will be an inspector followup item 80-13-02, " Monthly Fire Extinguisher
'
Inspection". The inspector noted that in three fire hose cabinets IRF-?66, IRF970, and 1 RF971 the first section of hose appeared to be full of water.
The licensee stated that some valves Jeak. The hose appeared to be damaged by the water. The licensee has replaced the hose in the stations identified.
The item is an inspector followup item 80-13-03, " Maintenance of Hose Stations".
.
The inspector examined the instar
'on of the component cr.nling water pumps 2B1 and 2B2. An instrument chann.'
.1s mounted on the motor care with two brackets fastened to the motor. ine inspecO r questioned the licensee to i
verify if the brackets were shown on the mot.c drawing. The inspector noted that the motors were safety related and thus required approved drawings prior to any modification.. The drawings did not show the brackets in question, therefore, this item as an infraction 80-13-01, " Modification to Safety Related Motors Without Approved Drawings".
_.. _
__
.
.._,
_
- _ -
-.
-.
._
.,, __
-
_.. _. _ -..
..
_
-..
_
_
,
b I
O
o-2-
,
!
6.
(Closed) Inspector Followup Item 80-09-02; The licensee's design engineering
.
department has issued Specification MCS-1390.01-00 dated August 19, 1980.
I This specification, entitled " Motor Operated Valve Field Termination Inspec-j tion", defines the methods of termination and the acceptability of the
!
methods used. This item is closed.
i 7.
Electrical (Cables and Terminations 1) - Observation of Work and Work
Activities The inspector selected ten cables f or examination to assure that the require-l ments of the SAR and QAM were completed within the areas of storage, handling,
!
identification, nonconformance control, issue, material traceability, drawing
and procedures control, inspection, raceway identification cable pulling pro-
cedures, raceway loading and cable terminations. The cables examined were:
2*EPQ508, 2*EQB530, 2*EPE541, 2*EPE536, 2*EPQ512, 2*EPQ514, 2*EQB524, 2*EPB529, 2*KC513 and 2*KC518.
I Within the areas examined there were no items of noncompliance identified.