IR 05000369/2014001

From kanterella
(Redirected from IR 05000370/2014001)
Jump to navigation Jump to search
Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2014001 and 05000370/2014001)
ML15063A504
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 03/04/2015
From: Frank Ehrhardt
NRC/RGN-III/DRP/B1
To: Capps S
Duke Energy Carolinas
References
IR 2014001
Download: ML15063A504 (6)


Text

UNITED STATES March 4, 2015

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/2014001 AND 05000370/2014001)

Dear Mr. Capps:

On February 10, 2015, the NRC completed its end-of-cycle performance review of the McGuire Nuclear Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 30, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, McGuire Nuclear Station was operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at McGuire Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance and all PIs indicated that your performance was within the nominal, expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections which will be sent via separate, non-publicly available correspondence. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Please contact me at 404-997-4611 with any questions you have regarding this letter.

Sincerely,

/RA/

Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17 Enclosure: McGuire Inspection/Activity Plan (03/01/2015 - 06/30/2016)

cc distribution via ListServ

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE /RA J By GW1/ /RA By FJE/

NAME JWorosilo FEhrhardt DATE 3/2/2015 3/2/2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Steven from Frank Ehrhardt dated March 4, 2015 SUBJECT: ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/2014001 AND 05000370/2014001)

DISTRIBUTION:

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 2 McGuire 03/04/2015 09:50:06 Inspection / Activity Plan Report 22 03/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL LICENSE EXAM PREP 3 1 03/30/2015 04/03/2015 V23452 MCGUIRE/APRIL 2015 INITIAL EXAM AT POWER FACILITIES CDBI - COMPONENT DESIGN BASES INSPECTION 7 1, 2 04/06/2015 04/10/2015 IP 7111121 Component Design Bases Inspection 1, 2 04/27/2015 05/01/2015 IP 7111121 Component Design Bases Inspection 1, 2 05/11/2015 05/15/2015 IP 7111121 Component Design Bases Inspection 1, 2 06/01/2015 06/05/2015 IP 7111121 Component Design Bases Inspection OL EXAM - INITIAL LICENSE EXAM 3 1 04/27/2015 05/08/2015 V23452 MCGUIRE/APRIL 2015 INITIAL EXAM AT POWER FACILITIES RP - RP PUBLIC RAD SAFETY BASELINE 2 1, 2 06/22/2015 06/26/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/22/2015 06/26/2015 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 06/22/2015 06/26/2015 IP 71151 Performance Indicator Verification HS - TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 07/13/2015 07/17/2015 IP 7111107T Heat Sink Performance EP - EP EXERCISE 8 1, 2 08/03/2015 08/07/2015 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 08/03/2015 08/07/2015 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 1, 2 08/03/2015 08/07/2015 IP 71151 Performance Indicator Verification ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 09/21/2015 09/25/2015 IP 7111108P Inservice Inspection Activities - PWR RP - RAD HAZARDS ANALYSIS AND TRANSPORTATION 2 1, 2 09/21/2015 09/25/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/21/2015 09/25/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 09/21/2015 09/25/2015 IP 71151 Performance Indicator Verification TFPI - TRIENNIAL FIRE PROTECTION INSP 4 1, 2 11/16/2015 11/20/2015 IP 7111105X Fire Protection - NFPA 805 (Triennial)

1, 2 12/07/2015 12/11/2015 IP 7111105X Fire Protection - NFPA 805 (Triennial)

OL EXAM - INITIAL LICENSE EXAM PREP 3 1 02/29/2016 03/04/2016 V23467 MCGUIRE MARCH 2016 INITIAL EXAM AT POWER FACILITIES RP - RP OCCUPATIONAL INSPECTION WEEK 1 3 1, 2 03/14/2016 03/20/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/14/2016 03/20/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/14/2016 03/20/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 McGuire 03/04/2015 09:50:06 Inspection / Activity Plan Report 22 03/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RP OCCUPATIONAL INSPECTION WEEK 1 3 1, 2 03/14/2016 03/20/2016 IP 71124.04 Occupational Dose Assessment 1, 2 03/14/2016 03/20/2016 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 03/14/2016 03/20/2016 IP 71151 Performance Indicator Verification ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 03/28/2016 04/01/2016 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 2 2 1, 2 03/28/2016 04/01/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/28/2016 04/01/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/28/2016 04/01/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/28/2016 04/01/2016 IP 71124.04 Occupational Dose Assessment 1, 2 03/28/2016 04/01/2016 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 03/28/2016 04/01/2016 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM 3 1 03/28/2016 04/08/2016 V23467 MCGUIRE MARCH 2016 INITIAL EXAM AT POWER FACILITIES PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 05/02/2016 05/06/2016 IP 71152B Problem Identification and Resolution 1, 2 05/16/2016 05/20/2016 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.