UNITED STATES
/
NUCLEAR REGULATORY COMMISSION o
'
g
<r REGION 11 o,
'[
101 MARIETTA ST., N.W., SUITE 3100 e
o ATLANTA, GEORGIA 30303
MAR 211980
.
Report No. 50-370/80-02 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Facility Name: McGuire Unit 2 Docket No. 50-370 License No. CPPR-84 Inspection at McGuire site near Charlotte, North Carolina Inspectors:
[ m)
3/// r
,
T. D. Gibbons Date Signed h,mh r
f // C l 6nw.,
'
N.' Merriweather (Intern)
'Date Signed Approved by:
3 -8 /- [e
T. E. Conlon, lection Chief, RCES Branch Date Signed SUMMARY Inspection on February 26-28, 1980 Areas Inspected This routine, unannounced inspection involved 48 inspector-hours on site in the areas of instrumentation components and systems work and work activities, elec-trical cable and terminations, work, work activities and QC records.
Results Of the areas inspected, no items of noncompliance or deviations were identified.
l
.
.
%
DETAILS
-
1.
Persons Contacted Licensee Employees
- G. W. Grier, Project Engineer J. C. Rogers, Project Manager K. S. Kisida, QA Engineer E. B. Miller, Project Senior QA Engineer
- Attended exit interview.
2.
Exit Interview The inspection ecope and findings were summarized on February 28, 1980, with those persons indicated in Paragraph I above.
3.
Licensee Action on Previous Inspection Findings Not inspected.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Independent Inspection Effort The inspectors observed the calibration of magnetic partial testing machines to assure compliance with Duke Power's construction procedure No. 33, "Cali-bration of Magnetic Partial Testing Machines".
Within the areas examined, no items of noncompliance or deviations were identified.
,
6.
Instrumentation (Components and Systems II) Observation of Work and Work
,
Activities (Unit 2)
The inspector selected eight pressure switches which control the air com-pressors for the emergency diesel generator (EDG) starting air. The switches are listed as follows; 2VG5120, 2VG5122, 2VG5130, 2VG5132, 2VG5140, 2VG5142, 2VG5150 and 2VG5152. The instruments were examined to assure that the SAR and QAM requirements were complied with in the areas of identification, location, cleanliness, protection, nonconformance control, and construction inspection. During this inspection the inspector noted a red tag number 10348 and examined the Nonconforming Item Report (NCI) and the drawings MC-2499-VG3 and VG4. The NCI and drawings appeared to need further clari-fication.
The item will be a followup item to assure that the work is I
completed and accepted by-QC.
The inspector followup item will be 370-80-02-01. Followup on disposition of NCI 10348.
r-
.
,
.
..
.
}
-2-Within the areas examined there were no items of noncompliance ide tified.
7.
Electrical (Cables and Terminations II) - Observation of Work and' Work Activities, Unit 2 The inspector selected the following safety-related power and control cables for examination to assure that the requirements of the SAR were complete with:
Cable Number Description 2*N5504 Containment Spray (CS) Pump 2B 2*CA503 Auxiliary (AUX) Feedwater (FW) Pump (PMP) 2A 2*KC615 Component Cooling Water (CCW) PMP Motor (MTR) 2A2 2*KC616 CCW PMP MTR 2A1 2*NS503 CS PMP 2A 2*CA504 Aux Fw PMP 2B 2*KC617 CCW PMP MTR 2B2 2*KC618 CCW PMP MTR 2B1 2*ILE508 Back-up Pressurizer HTR Power Panel 2A 2*EPQ510 Diesel Generator Battery Charger 2EDGB The cables listed above were inspected to assure compliance with the " pull slips" for cable size, type, physical protection, separation, identification, and routing. Work end work records were examined in the areas of storage, handling and cable identification.
Within the areas examined there were no items of noncompliance identified.
8.
Electrical (Cables and Terminations II) - Review of Quality Records The inspector reviewed the quality records for the cables identified in paragraph 7 above. The records review was in the areas of cab'.e pulling, routing, identification, separation, receipt inspection and macerial certi-fication to assure compliance with the SAR requirements.
Within the areas examined there were no items of noncompliance identified.
.