ML19338F937
| ML19338F937 | |
| Person / Time | |
|---|---|
| Site: | Mcguire |
| Issue date: | 09/30/1980 |
| From: | Parker W DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19338F932 | List: |
| References | |
| NUDOCS 8010280057 | |
| Download: ML19338F937 (2) | |
Text
r l
s.
s 6
fj D UK E POWE R CMIPM ', '-[l,[ ~(I Powra Uciturwo 422 Sourn Cucacu Sinter, Cauntorrt, N. C. asa4a
- [ ~ r all : 03 w a u x
- o. Pa n c a,s a.
September 30, 1980 VaCf PS($6D(NT Straw PmODvCTt04 ICLEPMQ%t Ae ta 704 373-4053 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Subject:
McGuire Nuclear Station Docket No. 50-370
Reference:
RII:TDG 50-370/80-13
Dear Mr. O'Reilly:
As requested by your letter of September 10, 1980, please find attached our response to the item of noncompliance identified in the subject inspection report.
Duke Power Company does not consider any information contained in IE Inspec-tion Report No. 50-370/80-13 to be proprietary.
Very truly yours,
& 6.
William O. Parker, Jr.
LJB: ace Attachment 4'I 1
g3 7 vi?iO2.tL C M Y
.~.
.. t s
DUKE POWER COMPANY MCGUIRE NUCLEAR STATION Response to IE Inspection Report 50-370/80-13
' ITEM As required by 10CFR 50, Appendix B, Criterion V'and implemented by DPC Topical Report, Paragraph 17.1.5 activities affecting quality shall be prescribed by documented instructions procedures or drawings.
and shall be accomplished in accordance with these instructions, procedures or drawings.
Contrary to the above, on August 21, 1980, instrument tray and tray supports j
were installed on safety related motors without approved drawings. The tray l
and tray supports were installed on the component cooling water pump motors j
which are safety related.
i This is an Infraction. A'similar item was brought to your attention in our letter dated September 28, 1979.
RESPONSE
l This item was documented on a Nonconforming Item Report on August 25, 1980.
The tubing tray and supports have been removed, the craf ts have been instructed in the requirements for field routed installations, and QC has re-inspected the installation. This type of violation is an isolated situation and does not require procedure revision.
Your letter referenced a similar item described in your letter dated September 28, 1979. We have reviewed this item and have determined that the item concerned a different situation.
In this incident equipment was installed utilizing design sketches instead of the released design drawings. Corrective action for this item was described in my response of October 19, 1979.