IR 05000369/2025006

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 - NRC Inspection Report 05000369 2025006 and 05000370 2025006
ML26063A394
Person / Time
Site: McGuire, Mcguire  
(NPF-009, NPF-017)
Issue date: 03/11/2026
From: Robert Williams
NRC/RGN-II/DORS/PB1
To: Pigott E
Duke Energy Carolinas
Shared Package
IR 2025006 List:
References
IR 2025006
Download: ML26063A394 (0)


Text

March 11, 2026

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 - NRC INSPECTION REPORT 05000369/2025006 AND 05000370/2025006

Dear Edward Pigott:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of McGuire Nuclear Station, Units 1 and 2, reviewing performance indicators (PIs),

inspection results, and enforcement actions from January 1, 2025, through December 31, 2025.

This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at McGuire Nuclear Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2027. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. Please contact me at 404-997-4664 with any questions you have regarding this letter.

Sincerely, Robert E. Williams, Jr., Chief Projects Branch 1 Division of Operating Reactor Safety Docket Nos. 05000369 and 05000370 License Nos. NPF-9 and NPF-17 Enclosure:

Inspection Plan cc w/ encl: Distribution via GovDelivery Signed by Williams, Robert on 03/05/26