March 11, 2026
SUBJECT:
REISSUE ANNUAL ASSESSMENT LETTER FOR NORTH ANNA POWER STATION, UNITS 1 AND 2 - REPORT 05000338/2025006 AND 05000339/2025006
Dear Eric Carr:
The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of North Anna Power Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2025, through December 31, 2025. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.
The NRC determined the performance at North Anna Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2027.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
This letter is being reissued to include the Enclosure.
Please contact me at 404-997-4890 with any questions you have regarding this letter.
Sincerely, Steven P. Smith, Chief Projects Branch 6 Division of Operating Reactor Safety Docket Nos. 05000338 and 05000339 License Nos. NPF-4 and NPF-7 Enclosure:
Inspection Plan cc w/ encl: Distribution via GovDelivery Signed by Smith, Steven on 03/13/26
ML26072A206 OFFIC E
RII/DORS RII/DORS NAME P. Carman S. Smith DATE 3/11/2026 3/11/2026
Enclosure North Anna 03/01/2026 - 12/31/2027 Unit Start End Activity CAC Title Staff Count NORTH ANNA INITIAL EXAM
1,2 4/19/2026 4/25/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
1,2 6/7/2026 6/20/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
EMERGENCY PREPAREDNESS EXERCISE INSPECTION
1,2 7/13/2026 7/17/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 7/13/2026 7/17/2026 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 1,2 7/13/2026 7/17/2026 IP 71151 001397 Performance Indicator Verification FOCUSED ENGINEERING INSPECTION (AGE-RELATED)
1,2 8/10/2026 8/14/2026 IP 71111.21N.04 001832 Age-Related Degradation 1,2 8/24/2026 8/28/2026 IP 71111.21N.04 001832 Age-Related Degradation SECURITY BASELINE INSPECTION
1,2 8/31/2026 9/3/2026 IP 71130.02 000734 Access Control 1,2 8/31/2026 9/3/2026 IP 71130.05 000737 Protective Strategy Evaluation 1,2 8/31/2026 9/3/2026 IP 71130.09 001656 Security Plan Changes 1,2 8/31/2026 9/3/2026 IP 71151 001338 Performance Indicator Verification RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION
1,2 9/14/2026 9/18/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 9/14/2026 9/18/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 9/14/2026 9/18/2026 IP 71124.04 000728 Occupational Dose Assessment 1,2 9/14/2026 9/18/2026 IP 71151 000746 Performance Indicator Verification UNIT 2 IN-SERVICE INSPECTION +SG
2 9/21/2026 10/2/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION
1,2 12/7/2026 12/11/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation DOMINION CORPORATE AA/FFD INSPECTION - NA
1,2 1/11/2027 1/14/2027 IP 71130.01 000733 Access Authorization 1,2 1/11/2027 1/14/2027 IP 71130.08 000740 Fitness-For-Duty Program
Site Inspection Activity Plan
SECURITY BASELINE INSPECTION - NA
1,2 2/8/2027 2/11/2027 IP 71130.01 000733 Access Authorization 1,2 2/8/2027 2/11/2027 IP 71130.08 000740 Fitness-For-Duty Program 1,2 2/8/2027 2/11/2027 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations UNIT 1 IN-SERVICE INSPECTION
1 2/15/2027 2/19/2027 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RAD SAFETY AND TRANSPORTATION BASELINE INSPECTION
1,2 3/15/2027 3/19/2027 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 3/15/2027 3/19/2027 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1,2 3/15/2027 3/19/2027 IP 71151 000746 Performance Indicator Verification EMERGENCY PREPAREDNESS PROGRAM INSPECTION
1,2 4/12/2027 4/16/2027 IP 71114.02 000717 Alert and Notification System Testing 1,2 4/12/2027 4/16/2027 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 4/12/2027 4/16/2027 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 4/12/2027 4/16/2027 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 4/12/2027 4/16/2027 IP 71151 001397 Performance Indicator Verification FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - NA
1,2 6/21/2027 6/25/2027 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 7/19/2027 7/23/2027 IP 71130.03 000735 Contingency Response - Force-On-Force Testing FOCUSED ENGINEERING INSPECTION 1 - TBD
1,2 6/28/2027 7/2/2027 IP 71111.21N 000714 Focused Engineering Inspections (FEI Placeholder)
1,2 7/12/2027 7/16/2027 IP 71111.21N 000714 Focused Engineering Inspections (FEI Placeholder)
OPERATION OF AN ISFSI
1,2 7/19/2027 7/23/2027 IP 60855 Operation of an Independent Spent Fuel Storage Installation PROBLEM IDENTIFICATION AND RESOLUTION
1,2 8/2/2027 8/6/2027 IP 71152B 000747 Problem Identification and Resolution 1,2 8/23/2027 8/27/2027 IP 71152B 000747 Problem Identification and Resolution NORTH ANNA INITIAL LICENSING EXAMINATION
1,2 6/27/2027 7/3/2027 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
Site Inspection Activity Plan
1,2 8/15/2027 8/28/2027 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
SECURITY BASELINE INSPECTION - NA
1,2 11/15/2027 11/18/2027 IP 71130.02 000734 Access Control 1,2 11/15/2027 11/18/2027 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 11/15/2027 11/18/2027 IP 71130.09 001656 Security Plan Changes
Site Inspection Activity Plan
North Anna 03/01/2026 - 12/31/2027 Unit Start End Activity CAC Title Staff Count SECURITY BASELINE INSPECTION (ISFSI) - NA
2/8/2027 2/11/2027 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations OPERATION OF AN ISFSI
7/19/2027 7/23/2027 IP 60855 001001 Operation of an Independent Spent Fuel Storage Installation
Site Inspection Activity Plan
North Anna 03/01/2026 - 12/31/2027 Unit Start End Activity CAC Title Staff Count SECURITY BASELINE INSPECTION (ISFSI) - NA