Text
-
-
c v'
q U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-358/81-10 Docket No. 50-358 License No. CPPR-88 Licenr,ee : Cincinnati Gas and Electric Company 139 East 4th Street
!
Cincinnati, OH 45201 Facility Name:
Wm.11. Zimmer Nuclear Power Station Inspection At: Zimmer Site, Moscow, OH
,
Inspection Conducted: March 30 - April 3, 1981 b
2'. ~1)Y$r Inspectors:
D. E. Miller V M > / s'/
p
_N#M8/
L. J. Hueter
, -
Approved By:
L.
. Gre e ting Chief 8/
Facilities Radiation Protection Section j
Inspection Summary:
Inspection on March 30 - April 3, 1981 (Report No. 50-358/81-30]
Areas Inspected: Routine, unannounced, preoperational inspection of radiation protection and preoperational testing programs including:
training, radiation protection and chemistry procedures, completed radwaste and instrument tests, and respiratory protection program. The inspection involved 76 inspector-hours onsite by two NRC inspectors.
,
Results: No items of noncompliance or deviations were identified.
L 8106 02n y j
.
.
.
_
_
w-
~
"6 -
'
.
Y:
DETAILS ~
.-
1.
l Persons Contacted
- J. Schott, Station Superintendent 1
- D. Erickson, Rad / Chem Engineer
- M. Niswander, Health Physicist
.
G. Appel,, Chemist
- J. Wald, Quality Engineer
W. Gott, Training Coordinator-
,
F. Reck, Rad / Chem Foreman S. Scheidler, Rad / Chem Foreman i
T.'Daniels, NRC Resident Inspector
,
-The inspectors also contacted other licensee personnel, including
rad /ches technicians during.the inspection.
- Denotes those present at the exit interview.
l 2.
General i
'
This inspection began about 2:00 p.m. on March 30, 1981. Following a brief meeting with the station superintendent, the inspectors met with
,
the rad / chem engineer'to outline their inspection plans and to arrange i
for review materials and personnel interviews. The bulk of the inspection
!
was devoted to review of the respiratory protection program, radiation l
protection procedures, and review of completed radwaste and. rad / chem pre-l
-
'
operational tests. Tours were made of the reactor, radwaste, auxiliary,
,
and turbine buildings to observe construction progress on selected systems and components.
3.
Rad / Chem Technician (RCT) Training
'
The RCT training program remains as previously reported (50-358/80-02).
In addition, six RCTs were sent to an operating BWR for five weeks to observe and participate in an operational radiation protection and l
chemistry program. The licensee intends to send four more RCTs soon.
l RCTs who have significant previous operational experience are not being
!
sent.
I
!
The inspectors selectively reviewed records of formal RCT training,
,
-training outlines, and the qualification card system. No problems were
,
identified.
,
4.
Radiation Protection and Chemistry Procedures i
Review of the following selected, new and revised radiation protection (RPP)-and chemistry (CRP) procedures, and station administrative direct-
'(
!
>
h f-2-
.
,
..
-
- - =
,
+ - -, - -, -. --
_
_
-- -
-
_
_....
_,,..
7-
_ _
g
.
I
,
ives-(SAD) was performed. They appear to be compatible with regulatory requirements and FSAR commitments. Specific review of respiratory pro-tection procedures.is described in Section 5.
RP. SAD.01 Revision 0 Radiation Protection Program RP. SAD.02 Revision 1 Radiation Work Permits RP. SAD.03 Revision 1 Eating, Drinking, and Smoking Control RP. SAD.04 Revision 0 ALARA Program RP. SAD.05 Revision 0 Occupational Radiation Exposure Controls TR. SAD.05 Revision 0 Radiological Self-Moritoring Training Program TR. SAD.06 Revision 0 Rad / Chem Technician Training RC.RPP.1.020 Revision 3 Radiation, Contamination, and Airborne Guides and Limits RC.RPP.1.109 Revision 1 Instruction Concerning Prenatal Radiation Exposure for Female Employees RC.RPP.I.300 Revision 3 Use of Direct-Reading Dosimetera RC.RPP.2.009 Revision 3 Issuing Personnel Dosimetry
,
RC.RPP.2.111 Revision 2 TLD Accuracy Testing RC.RPP.3.010 Revision 0 Radiological Survey Frequencies RC.RPP.3.211 Revision 2 Gross Beta Air MPC Determination RC.CRP.3.202 Revision 0 Activity Balance The inspectors reviewed and discussed with liceasee personnel drafts of selected procedures, including:
RC.CRP.1.060 Radioactive Liquid Release Permit Revisions to the following procedures, made"in response to problems noted in inspection report 50-358/79-18, were specifically reviewed.
These revisions appear to adequately correct the previously noted problems.
RC.RPP.1.211 Revision 7 Radiation Exposure Records and
>
Reports RC.RPP.3.210 Revision 1 Airborne Radioactivity Sample and Analysis RC.CRP.3.165 Revision 1 Sr 89-90 Radiochemical Separation RC.RPP.7.101 Revision 2 Use of Respiratory Protective Equipment RC.RPP.7.110 Revision 2 Collecting, Cleaning and Maintaining Respiratory Protective Equipment RC.RPP.7.125 Revision 1 Inspection and Use of the Scottoramic Facepiece for Air Purifying and Air Supplying Respirators RC.RPP.7.135 Revision 2 Scott Presur-Pak II SCBA t
e-3-
..
-
.
-
--.
r o
,
.
}
'
Procedures which remain to be developed or finalized include those concerning postaccident monitoring, containment monitoring, gaseous and liquid effluent release identification and quantification, and quality controls for the radiation' protection and chemistry programs.
-
5.
Respiratory Protection Program The respiratory protection program has been designed and prepared (to a large degree), but not yet implemented. The rad / chem engineer has been delegated authority and overall responsibility for the program, which is designed to meet applicable criteria in 10 CFR 20.103, Regulatory Guide 8.15, and NUREG-0041.
The program includes training, medical evaluation,'and quantitative fit testing requirements. A qualitative fit test is permitted on a short-term basis if the quantitative system (sodium chloride aerosol) is out of se rvice. Annual requalification in all three areas is required.
The program, as currently set up, will utilize Scott full-face respiratory devices with options of (1) air purifying filters, (2) air lit.es from the service air system, or (3) bottled air from self-contained breathing apparatus (SCBA). Also, supplied air hoods from Defense Apparel will utilize air lines from the service air system.
NIOSH approval has been granted for all of the respiratory equipment.
Some of the respiratory equipment inventory is limited and not considered adequate.
Receipt of additional equipment before fuel loading is planned.
This matter will be further reviewed during future inspections.
Certified " Class D" breathing air is obtained in cylinders from a commercial supplier for use in refilling SCBA air bottles utilizing a cascade system.
,
The service air system compressors are the nonlubricated cylinder type.
This air, in addition to being filtered near the point of use, is on a semiannual surveillance for verifying " Class D" quality. tiervice air outlets are currently being installed.
i The program includes collection and analysis of air samples to determine airborne radioactivity levels to aid in the selection of respiratory equipment and to determine MPC-hours of airborne activity exposure. A Canberra chair whole body counter (WBC), with both thyroid and whole body detectors, is onsite for use in evaluating the effectiveness of the pro-gram for limiting airborne exposures.
In evaluating the licensee's respiratory protection program, applicable procedures were reviewed. No significant problems were noted in the following procedures.
TR. SAD.04 Revision 0 Respiratory Protection Training Program RC.RPP.3.212 Revision 1 MPC-Hour Determination-4-
',
.
- r.
>
RC.RPP.7.110 Revision 2 Collecting, Cleaning, and Maintain-ing Respiratory Equipment RC.RPP.7.120 Revision 0 Inventory and Inspection of Respiratory Equipment RC.RPP.7.125 Revision 1 Inspection and Use of the Scotto-ramic Facepiece for Air Purifying
-
and Air Supplying Respirators RC.RPP.7.135 Revision 2 Scott "Presur-Pak" II SCBA RC.RPP.7.141 Revision 1 Inspection, Maintenance and Use of the Air Supplied Plastic Suit (Note: Not used for respiratory protection)
RC.RPP.7.150.
Revision 1 Refilling Scott Presur-Pak Cylinders RC.RPP.7.160 Revision 1 Qualitative and Quantitative Respirator Facepiece Fitting RC.RPP.7.161 Revision 0 NACL Aerosol Test System Problems noted by the inspector in his review of the following procedures were discussed with licensee representatives. These procedures will be reviewed further during a future inspection.
RC.RPP.2.160 Revision 0 Bioassay RC.RPP.7.101 Revision 2 Use of Respiratory Protective Equipment
.
A major revision to procedure RC.RPP.2s !60 is planned by the licensee as a result of several problems identified during the inspection.
Attachment 8.1 to procedure RC.RPP.7.101 lists the MPC ratio as "2000 or higher" for SCBA when iodine or particulates are the nuclides of concern.
However, Regulatory Guide 8.15 specifies a maximum protection factor of 10,000 (pressure demand mode) for nonemergency use.
Section 5.4.2.B.4 of procedure RC.RPP.7.101 states that for air-supplying respirators, the pressure of the air supplied to the respirator shall be between 60 and 125 PSIG. However, this is the pressure range that should be supplied to the distribution manifold, not to individual respirators.
6.
Preoperational Testing Preoperational testing of several radwaste systems, and rad / chem depart-ment instruments has been completed. No significant problems were identi-fled during the inspectors' review of the following completed tests.
PO-AR-1 ARM System PO-LE-1 Laboratory Equipment PO-PI-1 Personnel Monitoring and Survey Instrumerts PO-WE-2 Equipment Drain Processing System P0-WF-2 Discharge System-5-l
'
i~
.
t'
-i
<
4 1:
According to 4feensee personnel, the following radwaste preoperational tests are in progress at the percent completion indicated.
<
PO-FC-1 Fuel Pool Cooling and Cleanup
- 95%
PO-PS-1 Process Sampling
- 48%
PO-WE-1 Equipment Drain Collection
- 60%
PO-WF-1
' Floor Drain System
- 95%
PO-WF-3
. Floor & Equipment Drain Processing
- 30%
'PO-WX-2 Sludge Handling
- 48%
PO-WZ-1 Chemical Waste
- 30%
The following preoperational tests have not begun-because the compenents or systems are still under construction or awaiting subsystem testing.
PO-CM-1 Containment Monitoring PO-LR-1 Integrated Liquid Radwaste Handling PO-WX-1 Solid Radwaste Handling PO-WY-1.
Laundry Drain System Gaseous effluent monitoring and ventilation preoperation tests were not reviewed during this inspection.
7.
Exit Interview The inspectors met with licensee representatives (denoted in Section 1)
,
at the conclusion of the inspection on April 3, 1981.
-The inspectors summarized the scope and findings of the inspection.
In response.to the inspectors' comments, the licensee stated that a major revision to respiratory protection prograu procedure RPP.2.160 would.be accomplished, and necessary changes to RPP.7.101 would be made.
-(Section 5)
.
-6-L