Enforcement Conference Rept 50-358/81-14 on 810410.Major Areas Discussed:Proposed Corrective Action Program for Deficiencies Identified in Current NRC Investigation of Plant & Measures to Be Taken to Assure Acceptable Quality
ML20004D140
Person / Time
Site: Zimmer
Issue date: 04/17/1981
From: Barrett P, Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20004D138 List:
References
50-358-81-14, NUDOCS 8106080458
Download: ML20004D140 (3)


Text

._.

.

/

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

.

Report No. 50-358/81-14

/

Docket No. 50-358 Licensee: Cincinnati Gas and Electric Company 139 East 4th Street Cincinnati, OH 45201 Facility Name:

Wm. H. Zimmer Nuclear Power Station Enforcement Conference At: Region III Office in Glen Ellyn, IL Enforcement Conference Condtte.ted: April 10, 1981 f.'d. Erw&

7!8/

Prepared By:

P. A. Barrett

'

!

/

Rfu)awkh Approved By:

R. F. Warnick, Chief

////7NP/

'

'

Reactor Projects Section 2B Enforcement Conference Summary Enforcement Conference on April 10, 1981 (Report No. 50-358/81-14),

Conference Subject: Discussion of CG&E's proposed corrective action program for deficiencies identified to date in the current NRC investigation of the Z1mmer project and the n.easurer to be taken to assure acceptable quality of future activities.

j d

)

.

F106 08 0 %%

.

.

_

_.

_

_ _.

.

..

_. _ _

.

..

.

-

-

- -

_

I '

e d

i DETAILS

!

'

1.

Attendees Cincinnati Gas & Electric Company

i E.1\\. Borgmann, Senior Vice President W. D. Waymire,_ Manager of General Engineering W. W. Schweirs, Manager of Quality Assurance

,

B. K. Culver, Manager of Generation Construction i

H. J. Kaiser Company J. P. Coyle, Vice President, Power Division >

NRC

-

!

J. G. Keppler, Director, IE-RIII J. H. Sniezek, Director, Division of Regional and Resident. Inspection, IE-HQ

.

A. B. Davis, Deputy Director, IE-RIII

,

R. F. Warnick, Chief of Reactor Projects Section 2B, IE-RIII i

P. A. Barrett, Principal Inspector, IE-RIII J. B. McCarten, Principal Investigator, IE-RIII

,

l F. T. Daniels, Senior Resident Inspector, IE-RIII J. F. Streeter, Director, Enforcemen". & Investigation Staff, IE-RIII f

G. Fiorelli,~ Branch Chief, Reactor Projects, IE-RIII J. Lieberman, Deputy Chief Counsel for Enforcement, OLED-HQ

,

J. B. Henderson, Project Section o.f Resident & Regional Reactor

Inspection, IE-HQ

l R. L. Spessard. Branch Chief, DETI, IE-RIII L. G. McGregor, Emergency Preparedness Inspector, IE-RIII J. A. Hind, Director, Operation Support, IE-RIII

'

W. H. Schultz, Acting Enforcement Coordinator, IE-RIII

2.

Enforcement Conference

'

'

The conference was held in the NRC Ragion III office in Glen Ellyn,

,

Illinois, to discuss Cincinnati Gas and Electric Companys proposed corrective action program for the deficiencies identified to date in the current NRC investigations, and the additional measures to be caken

,

to assure acceptable quality of future activities.

Tbe deficiencies were identified in the following areas: Structural

~

welds, contractor QA program, traceability of materials, cable and weld

,

inspections, nonconformances, FSAR commitments, design control of cable j

systems, corrective actions, audits, and design change control.

i i

.

- 2-i

!

- - - - -

---._y-

-

-y y

.-,-,,

ym-3 rr

,-e

,-eg,..

,w,,

,

3.,,-,,

,r~w*,-

, - - + - +, -

.----n.,-.e-,

,

-, -

m

, --

=

-

e - - -e

.

s-The licensee presented a program which would require extensive and timely inspections of plant hardware and complete detailed reviews of quality documentation. The inspection and review efforts would be performed by qualified personnel and closely monitored by CG&E's upper management. The efforts would be explicitly documented to show the basic causes for the deficiencies; the extent and significance of the deficiencies considering the basic causes; and the corrective actions taken with regard to both the causes and the effects.

The licensee also presented additional measures to assure quality in all future activities (including rework, reinspections, and remaining original activities). The measures include increased staffing, inspections, comprehensive audits, and training; redefining of duties, responsibilities and authorities; and establishment of strong and effective communication channels.

.

I l

)

l l

t-3-

_