U.S. NUCLEAR REGULATORY COMMISSION
'
0FFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-358/81-20 Docket No. 50-358 License No. CPPR-88 Licensee:
Cincinnati Gas and Electric Company 139 East 4th Street Cincinnati, OH 45201 Facility Name:
Wm. H. Zimmer Nuclear Power Station Meetings At:
Wm. H. Zimmer site, Moscow, OH and CG&E Corporate office, Cincinnati, OH Meetings Conducted: June 2-3, 1981 fh. SW Meeting Attendees:
P. A. Barrett
[
'/
/
Reactor Inspector
'
R F La nd
.
R. F. Warnick, Chief 6/2M7/
Reactor Projects Section 2B
'
'
ash r
A. B. Davis 0/'f Deputy Director
/
'
J G h
- /2 5 & 1 D'r ctor ('
'
Approved By:
-
n t
Director NI
- ivision of Resident and Project Inspection Meeting Summary Meetings on June 2 and 3, 1981 (Report No. 50-358/81-20)
Meetings Subject: Meetings were held onsite on June 2 and at CG&E Corporate Headquarters on June 3, 1991, to discuss the proposed program to confirm the quality of completed construction work at the Zimmer site.
A total of 20 NRC man-hours were involved in the two meetings.
8107100158 810626 PDR ADOCK 05000358
_
- _
-
. _.
__._,
-..
-_
_-
,
-_
_____
-
_ _ _ _ - _
-
.
- .
i DETAILS 1.
Persons In Attendance i
a.
Meeting June 2, 1981 at Zimmer Site Cincinnati Gas and Electric Company
.
W. D. Waymire, Manager, General Engineering Department and Acting Manager, Quality Assurance l
J. R. Schott, Plant Manager S. C. Swain, Manager, Site Construction M. J. Rulli, Nuclear Engineer J. F. Shaffer, Chief Draftsman J. C. Buck, QA Engineer l
R. J. Reiman, Senior Electric Power Plant Engineer L. C. Albers, Electrical Engineer Kaiser Engineers, Inc.
D. L. Howard, Director, QA Programs P. Kyner, Site QA Manager R. W. D'Arcy, Manager, Site QA Documentation Sargent and Lundy M. E. Schuster, Head, Quality Control Division R. J. Pruski, Project Manager A. K. Singh, Assistant Head, Structural Analytical Division U. S. Nuclear Regulatory Commission R. F. Warnick, Chief, Reactor Projects Section 2B P. A. Barrett, Principal Inspector, Zimmer F. T. Daniels, Senior Resident Inspector b.
Meeting June 3, 1981 at CG&E Corporate Office Cincinnati Gas and Electric Company W. H. Dickhoner, President, CG&E E.
A. Borgmann, Senior Vice President, Engineering Services and Electrical Production W. D. Waymire, Manager, General Engineering Department, and Acting Manager, Quality Assurance U. S. Nuclear Regulatory Commission J. G. Keppler, Director, Region III A. B. Davis, Deputy Director, Region III R. F. Warnick, Chief, Reactor Projects Section 2B-2-
_ _ _ _ _ _. _ _ _ _ _ _ - _ _ -
.
.
-
..
2.
Working Level Meeting - June 2, 1981 A working level meeting was held on June 2, 1981, at the Zimmer site to discuss the licensee's proposed quality confirmation program and the additional measures Region III will require to identify and correct construction deficiencies, to establish confidence in quality control records, and to verify the quality of existing construction.
The quality confirmation program includes the following:
a.
Structural Steel Construction b.
Subcontractor QA Programs Material Traceability - Heat Numbers on Piping c.
d.
Nonconformance Reporting e.
Inspection of Painted Welds f.
Radiograph Technique - Shimming the Penetrometer g.
Electrical Cable Separation h.
Design Calculation and Verification i.
Audits j.
Deleted Weld Inspection Criteria k.
Socket Weld Fit-Ups 1.
Weld Quality m.
Design Document Changes 3.
Management Meeting - June 3, 1981 The Region III Director, Deputy Director and Section Chief in charge of the NRC investigation at Zimmer met with CG&E's President, Senior Vice President of Engineering Services and Electrical Production, and the Manager of the General Engineering Department who is also the Acting Manager of Quality Assurance. The meeting was held on June 3, 1981, to discuss matters relating to the NRC's ongoing Zimmer investigation. Topics discussed included the originating allegations; NRC findings relative to the allegations; problems identified during the investigation; the NRC's Immediate Action Letter of April 8,1981, establishing controls to assure the quality of ongoing and future work; the program to confirm the quality of completed work; the licensee's internal problem identification and resolution system; status of the NRC's investigation; the role of NRC's Office of Inspector and Auditor in the investigation; and public and congressional interest in the Zimmer project.
-3-
.. - _ --
_ _ _ _. - _ _ _ _,. _
___
,..--
...___ _ _ _,
_ - - _ _ - _. -
-