U.S. NUCLEAR REGULATORY COMMISSION O
oretce or tuseecrton ^"o enroacesent Region I Report No.
50-354/80-22 Docket No.
50-354 License No.
CPPR-120 Priority Category A
--
,
Licensee:
Public 2:.evice Electric and Gas Company 80 Park Plaza - 17C Newark, New Jersey 07101 Facility Name:
Hope Creek Generating Station, Unit 1 Inspection at: Hancocks Bridge, New Jersey Inspection conducted:
December 4, 13, 22, and 31, 1980 Inspectors:.NK Cddd
}d.
/ 9 ne/"
date' signed W. F. S&nders, Reactor Inspector fS h Y
/ 9. /9H R. A. McBrearty, $Lractor Inspector date si'gned
,
date signed Approved by:
b.
A<M/
//ho[9/
L. E Tripp', Chief, Engineering Support date sighed Section No. 1, RC&ES Branch Inspection Summary:
~
Inspection on December 4, 13, 22 and 31,.1980 (Report No. 50-354/80-22)
Areas Inspected:
Routine unannounced inspection by two regional inspectors of the quality related procedures, specifications, equipment with observations made of the transporting, i-lif ting and setting of the Reactor, Pressure Vessel.
The inspection involved 32 inspector hours onsite by two regional based inspectors.
Results: Of the one area inspected, no iteins of noncompliance were identified.
Region I Form 12 (Rev. April 77)
8108180 6 4
.
..
,
. -
-
.
.
.
DETAILS 1.
Persons Contacted Public Service Electric and Gas Company
- F. Barnabei, Site Q.A. Engineer
- A. E. Giardino, Project Q.A. Engineer
- P. J. Kudless, Principal Construction Engineer Bechtel Power Corporation
'
- L. Bedford, Contract Engineer
- A. J. Bryan, Q.C.
- J. B. Gatewood, Lead Site Q.A. Engineer
- W. Hindle, Project Field Engineer P. Hudson, Q.A. Engineer
- G. Moulton, Project Q. A. Engineer
- D. M. Stover, Project Superintendent - Contracts General Electric Company C. Brinson, Q. A. Engineer Hake - Lampson R. Ellis, Q.A. Engineer E. P. Golin, Project Man:ger'
- Denotes those present at the December 4,1980 exit interview.
- Denotes those present at the December 31, 1980 exit interview.
- Denotes those present at the December 4 and 31,1980 exit meeting.
2.
Scone This inspection was made to review the program, procedures, equipment,
,
QA/QC planning and ongoing activities related to the moving, lifting and j
setting of the Reactor Pressure Vessel (R.P.V.).
i
'
3.
Procedure Review The following procedures and specifications were reviewed for compli-ance with regulatory requirerrents and the inclusion of Quality Control planning such as check lists, hold points, auditing and inspection of equipment:
Bechtel FSK-M-056(Q) - Transport, Upending and Landing of Reactor
.
Pressure Vessels
l
.
_
_
e
-
General Electric 22A6639. Rev. 0 - Reactor Vessel Alignment Installa-
'
.
tion Ins truction 1.P-HC-003, Rev. 2, Inspection Flan for Load Out
.
L.U.R.-WP-28-10 - Load Out Reactor Vessel and Secure to Crawler
.
.
L.U.R.-WP-28-11 - Transport Reactor Vessel to Ccntainment Building'
.
L.U.R.-WP-28-12 - Upend and Set Reactor Vessel
.
Q.A. Procedure No. 4 - Training and Qualification of Personnel
.
Q. A. Procedure No. 5 - Instruction Procedures and Drawings
.
Q.A. Procedure No. 6 - Document Control
.
Q.A. Procedure No. 7 - Handling of Storage
.
Q. A. Procedure No. 8 - Inspections
.
Q. A. Procedure No. 9 - Test Controls
.
Q. A. Procedure No.10 - Nonconformances
.
Q.A. Procedure No.11 - Corrective Actions
.
Q.A. Procedure No. 13 - Q,A. Records
.
.
Q.A. Procedure No. 14 - Design Control
.
Q. A. Procedure No.15 - Procurement
.
l Quality Control Instruction - QCI - 10855/SM-1.06
.
P.S.E.&G., Site Audit P1an H-206 Per QAI 18.1 Audit of 19 Quality
.
l Characteristics No items of noncompliance were identified.
4.
Observations - Reactor Pressure Vessel (RPV) Installation
.
The inspector observed a portion of the activities associated with lifting
!
of the RPV and placement in its permanent location in the containment build-ing. The lift and placement were accomplished WQ the use of a Lampson Transi-Lift unit and were governed Dy procedure number. LUR-WP-28-12.
In addition to the above, the ir.spector reviewed QA/QC records associated with load testing of the lifting rig and setting of the RPV.
t
-
.-
o-
- j '
)
4 The inspector's observations were made to ascertain compliance with the governing procedure.
Portions of the following activities were witnessed by the inspector:
Up-ending of the RPV
.
'
Cleaning of RPV flange prior to lift
-
.
.
I Lowering RPV into containment building
.
i No iter.a of noncompliance were identified.
5.
Exit Interview i
.The inspectors met with the licensee representatives (denoted in paragraph
'
1)~on December 4, 1980 and at the conclusion of the inspection on December 31, 1980.
The inspectors summarized the purpose and the scope of the inspection and the findings.
i
!
.:
...