IE Insp Rept 50-354/80-22 on 801204,13,22 & 31.No Noncompliance Noted.Major Areas inspected:quality-related Procedures,Specs & Equipment W/Observations Made of Transporting,Lifting & Setting of Reactor Pressure Vessel
ML20003C903
Person / Time
Site: Hope Creek 
Issue date: 01/20/1981
From: Mcbrearty R, Sanders W, Lester Tripp
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20003C901 List:
References
50-354-80-22, NUDOCS 8103180678
Download: ML20003C903 (4)


Text

- -

-

- --

.

.

U.S. NUCLEAR REGULATORY COMMISSION O

oretce or tuseecrton ^"o enroacesent Region I Report No.

50-354/80-22 Docket No.

50-354 License No.

CPPR-120 Priority Category A

--

,

Licensee:

Public 2:.evice Electric and Gas Company 80 Park Plaza - 17C Newark, New Jersey 07101 Facility Name:

Hope Creek Generating Station, Unit 1 Inspection at: Hancocks Bridge, New Jersey Inspection conducted:

December 4, 13, 22, and 31, 1980 Inspectors:.NK Cddd

}d.

/ 9 ne/"

date' signed W. F. S&nders, Reactor Inspector fS h Y

/ 9. /9H R. A. McBrearty, $Lractor Inspector date si'gned

,

date signed Approved by:

b.

A<M/

//ho[9/

L. E Tripp', Chief, Engineering Support date sighed Section No. 1, RC&ES Branch Inspection Summary:

~

Inspection on December 4, 13, 22 and 31,.1980 (Report No. 50-354/80-22)

Areas Inspected:

Routine unannounced inspection by two regional inspectors of the quality related procedures, specifications, equipment with observations made of the transporting, i-lif ting and setting of the Reactor, Pressure Vessel.

The inspection involved 32 inspector hours onsite by two regional based inspectors.

Results: Of the one area inspected, no iteins of noncompliance were identified.

Region I Form 12 (Rev. April 77)

8108180 6 4

.

..

,

. -

-

.

.

.

DETAILS 1.

Persons Contacted Public Service Electric and Gas Company

      • F. Barnabei, Site Q.A. Engineer
      • A. E. Giardino, Project Q.A. Engineer
    • P. J. Kudless, Principal Construction Engineer Bechtel Power Corporation

'

    • L. Bedford, Contract Engineer
    • A. J. Bryan, Q.C.
  • J. B. Gatewood, Lead Site Q.A. Engineer
    • W. Hindle, Project Field Engineer P. Hudson, Q.A. Engineer
    • G. Moulton, Project Q. A. Engineer
    • D. M. Stover, Project Superintendent - Contracts General Electric Company C. Brinson, Q. A. Engineer Hake - Lampson R. Ellis, Q.A. Engineer E. P. Golin, Project Man:ger'
  • Denotes those present at the December 4,1980 exit interview.
    • Denotes those present at the December 31, 1980 exit interview.
      • Denotes those present at the December 4 and 31,1980 exit meeting.

2.

Scone This inspection was made to review the program, procedures, equipment,

,

QA/QC planning and ongoing activities related to the moving, lifting and j

setting of the Reactor Pressure Vessel (R.P.V.).

i

'

3.

Procedure Review The following procedures and specifications were reviewed for compli-ance with regulatory requirerrents and the inclusion of Quality Control planning such as check lists, hold points, auditing and inspection of equipment:

Bechtel FSK-M-056(Q) - Transport, Upending and Landing of Reactor

.

Pressure Vessels

l

.

_

_

e

-

General Electric 22A6639. Rev. 0 - Reactor Vessel Alignment Installa-

'

.

tion Ins truction 1.P-HC-003, Rev. 2, Inspection Flan for Load Out

.

L.U.R.-WP-28-10 - Load Out Reactor Vessel and Secure to Crawler

.

.

L.U.R.-WP-28-11 - Transport Reactor Vessel to Ccntainment Building'

.

L.U.R.-WP-28-12 - Upend and Set Reactor Vessel

.

Q.A. Procedure No. 4 - Training and Qualification of Personnel

.

Q. A. Procedure No. 5 - Instruction Procedures and Drawings

.

Q.A. Procedure No. 6 - Document Control

.

Q.A. Procedure No. 7 - Handling of Storage

.

Q. A. Procedure No. 8 - Inspections

.

Q. A. Procedure No. 9 - Test Controls

.

Q. A. Procedure No.10 - Nonconformances

.

Q.A. Procedure No.11 - Corrective Actions

.

Q.A. Procedure No. 13 - Q,A. Records

.

.

Q.A. Procedure No. 14 - Design Control

.

Q. A. Procedure No.15 - Procurement

.

l Quality Control Instruction - QCI - 10855/SM-1.06

.

P.S.E.&G., Site Audit P1an H-206 Per QAI 18.1 Audit of 19 Quality

.

l Characteristics No items of noncompliance were identified.

4.

Observations - Reactor Pressure Vessel (RPV) Installation

.

The inspector observed a portion of the activities associated with lifting

!

of the RPV and placement in its permanent location in the containment build-ing. The lift and placement were accomplished WQ the use of a Lampson Transi-Lift unit and were governed Dy procedure number. LUR-WP-28-12.

In addition to the above, the ir.spector reviewed QA/QC records associated with load testing of the lifting rig and setting of the RPV.

t

-

.-

o-

j '

)

4 The inspector's observations were made to ascertain compliance with the governing procedure.

Portions of the following activities were witnessed by the inspector:

Up-ending of the RPV

.

'

Cleaning of RPV flange prior to lift

-

.

Reactor Pressure Vessel lift

.

I Lowering RPV into containment building

.

i No iter.a of noncompliance were identified.

5.

Exit Interview i

.The inspectors met with the licensee representatives (denoted in paragraph

'

1)~on December 4, 1980 and at the conclusion of the inspection on December 31, 1980.

The inspectors summarized the purpose and the scope of the inspection and the findings.

i

!

.:

...