IR 05000354/1980017

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-354/80-17 & 50-355/80-17 on 801104-07.No Noncompliance Noted.Major Areas Inspected:Licensee Activity in Area of Structural Steel Erection & in Major Component Support for Proper Handling & Installation
ML19345F043
Person / Time
Site: Hope Creek  
Issue date: 12/10/1980
From: Chaudhary S, Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19345F042 List:
References
50-354-80-17, 50-355-80-17, NUDOCS 8102060572
Download: ML19345F043 (3)


Text

..

O U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

'

50-354/80-17 Report No.

50-355/80-17 bO-3b4 Docket No.

50-355 CPPR-120 License No.

CPPR-121 Priority

--

Category A

,

Licensee:

Public Service Electric & Gas Company 80 Park Place

.

Newark. New Jersev 07101 Facility Name:

Hope Creek Units 1 and 2 Inspection at: Hancocks Bridge, New Jersey Inspection conducted: November 4-7, 1980

. Inspectors:

/[.

tdMef

/2//o[$'O cto S. K. Chaudhary, Reactor / Inspector dite ' signed date signed date signed Approved by:

O-[ hd1

/1//d[15 S. D. Ebnetg'r, Chief, Engineering Support date' signed Section 2, RC&ES Branch Inspection Summary:

Units 1 & 2, (Combined Inspection Report No. 50-354/80-17 and 50-355/80-17)

Areas Inspected: Routine unannounced inspection by a regional based inspector of the licensee activity in the area of structural steel erection, in major component support for proper handling, installation, adherence to proper procedures, and documentation.

The inspection involved 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> on site by one regional based inspector.

Resul ts: No items of noncompliance were identified.

Region I Form 12 (Rev. April 77)

'810 2 06 051f

.

_

!

.

.

DETAILS 1.

_ Parsons Contacted Public Service Electric & Gas Company

  • A. E. Giardino, Project QA Engineer
  • R. C. Robinson, Senior QA Engineer Bechtel Power Corporation
  • J. B. Gatewood, QA Supervisor
  • R. L. Hanks, Project Construction QC Engineer
  • D. L. Long, Project Superintendent
  • D. Mackey, Resident Engineer
  • M. A. Macondray, Assistant Project Field Engineer U.S. Nuclear Regulatory Commission
  • W. H. Bateman, Senior Resident Inspector (* Denotes people attending exit interview.)

2.

Plant Tour Units 1 and 2 The inspector conducted a walked through plant tour of Units 1 and 2 primary containments and reactor buildings to assess the work procedure and general conformance to good practice in the areas of erection and installation of structured steel.

A licensee QA engineer accompanied the inspector on this tour.

No items of noncompliance were identified.

3.

Observation of Work for Safety-related Structural Steel and Major Equipment Supports The inspector observed and inspected some completed and partially completed structural steel itens to determine that the supports are of the type spe-cified, a.e properly fabricated, are properly handled during installation, and specified clearances and critical dimensions are maintained.

The inspector inspected the,following supports:

1-AVH-211/1-EVH-211 1-BE-046-H03-Q 1-BE-046-H02-Q 1-BVH-211/1-FVH-211 1-0VH-211/1-HVH-211 1-P-BE-047-H02 1-BE-047-H03 1-P-FG-180-H04-Q

Support for Pump fl0P210 with QC hold.

.

y-

-p

%

.e

-

,

- - -

+

-w w

w

_._

O

.

Based on the above inspection and discussion with licensee personnel, the inspector determined that the above structural supports conform to the pro-ject requirements, and are properly handled and installed.

No items of noncompliance were observed.

4.

Review of Documentation Associated With Above Equipment Supports The inspector reviewed the documentation and held discussions with licens-ee personnel to verify that quality control operations are adequate, pro-ject procedures are implemented and proper records are maintained.

The

-

inspector reviewed the following records:

Bechtel Specifications:

10855-C-126(Q), Rev. 6 10855-C-126(Q), Rev. 1 10855-C-410(Q), Rev. 5 Quality Control Instructions:

PQCI-P-2.00 PQCI-P-2.10 PQCI-C-2.10 QC Inspection Reports:

C-0845-12-C-2.10, Rev. 6 C-0845-12-C-2.10, Rev. 7 C-0845-12-C-2.10, Rev. 9 C-0a45-3-C-2.10 Rev. 6 Bechtel Drawing C-0845-0, SHi, Rev. 3.Q.

FCRs:

C-3154; C-2837; C-3028; C-2860 Based on the review of above documents and discussion with licensee person-nel, the inspector determined that in the installation of structural steel equipment support proper procedures were followed, and adequate records are being maintained.

No items of noncompliance were identified.

5.

Exit Interview The inspector met with licensee representative (denoted * in paragraph 1)

at the conclusion of the inspection.

The inspector summarized the purpose, scope, and the findings of this inspection.

.

.