IR 05000346/1987013

From kanterella
Jump to navigation Jump to search
Partially Withheld Security Insp Rept 50-346/87-13 on 870601-17.Violations Noted:Failure to Escort Individuals Properly & Control Access to Vital Area.Major Areas Inspected:Mgt Effectiveness & Security Organization
ML20235F297
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/02/1987
From: Creed J, Drouin B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20235F261 List:
References
50-346-87-13, NUDOCS 8707130320
Download: ML20235F297 (2)


Text

____ _-__-

'

,

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-346/87013(DRSS)

Docket No. 50-346 License No. NPF-3 Safeguards Group IV Licensee: Toledo Edison Company Edison Plaza 300 Madison Avenue Toledo, OH 42652

Facility Name: Davis-Besse Nuclear Power Station Inspection At: Davis-Besse Site, Oak Harbor, Ohio Inspection Conducted: June 1-4 on site; June 8-17 in the Region III Office Date of Last Secuyltrin pection: March 19 through April 13, 1987

<u~'

($

() M Inspector:

Bryan-Bfou t'n Date'

Security Inspector Approved By:

[

[JamesR. Creed, Chief Date w afeguards Section Inspection Summary Inspection on June 1-17, 1987 (Report No. 50-346/87013(DRSS))

Areas Inspected: Management Ef festiveness; Security Organization; Records and Reports; Testing and Maintenance; Physical Barriers - Protected Areas; Compensatory Measures; Assessment Aids; Access Control - Personnel and Fackages; l

,

Detection Aids - Protected Areas; Alarm Stations; Training and Qualification; Protection of Safeguards Information and Licensee action on previous inspection j

t findings. We also reviewed two previously reported security events. We reviewed apparent discrepancies in security force members' statements concerning the asiegedly inattentive shift supervisor event.

Results:

One of two previous inspection findings was closed.

The licensee was in compliance with NRC requirements in 11 of 13 inspected areas.

The exceptions are noted below.

Access Control - Personnel:

Individuals were not properly escorted.

Access to a Vital Area was not properly controlled.

!

B707130320gjQO

PDR ADOCK PDR G

Enclosure contains l

SAFEGUMDS INFORMATION Upon separation this pago is Decontrolled

..

.. - _ _ _ _ _.

i

- - _ _ _ _ _ _ _ _ _ _ _.

_

)

-

.

i Protection of Safeguards Information:

Safeguards Information was not properly stored.

l Two open items were identified during this inspection. One involved the l

l testing of Protected Area alarms and the other involved alarm station l

reliability.

j The apparent discrepancies in security officer statements were resolved to our satisfaction.

(Details: UNCLASSIFIED )

l

)

)

l

Enclocure contatns

SAFECUARDS INFORMATION Upon separation this Pase is Decontrolled l

,