U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-3346/87002(DRSS)
Docket No. 50-346 License No. NPF-3 Safeguards Group IV Licensee: Toledo Edison Company Edison Plaza 300 Madison Avenue Toledo, OH 43652 Facility Name: Davis-Besse Nuclear Power Station, Unit 1 Inspection At: Davis-Besse Site, Oak Harbor, Ohio Inspection Conducted: January 5-9, 1987 Date of Last Physical Security Inspection: June 9 through July 15, 1986 Inspector: km f bas. Je
//Z V/89 Bryan @fouin
Date
'
Physical Security Inspector Approved By: (A
/
8[
es 1. Creed, Chief Date feguards Section Inspection Summary Inspection on January 5-9, 1987 (Report No. 50-346/87002(DRSS))
Areas Inspected:
Included a review of Security Plan and Implementing Procedures; Management Effectiveness; Security Organization; Records and Reports; Physical Barriers - Protected Areas; Lighting; Assessment Aids; Access Control - Personnel; Detection Aids - Protected Areas and Previous Inspection Findings.
Licensee action on IE Information Notices was also reviewed. The inspector familiarized himself with the licensee's Fitness For Duty Program.
Results: Eleven of twelve previous open items were closed as a result of this l
Inspection. The licensee was found to in compliance with NRC requirements in i
eight of nine inspected areas during this inspection. The exception is noted
'
below:
i
Enclosure contains SAFEG'JA%S II;iu:!ATION 8702060522 B70129 Upon sepcraticn this ADOCK 0500
gDR page is Dc;ontrolled
,
.. -
-
.
. - - __. -
- _-__. - _
- _, _ -.
_ - -,
. -... -
--
Assessment Aids:
Some aspects of the camera coverage were inadequate.
The licensee has initiated several actions since the past inspection and completed certain security projects which have enhanced the overall effectiveness of the security program.
(Details: UNCLASSIFIED )
,
i
!
l l
2