Partially Withheld Reactive Security Insp Rept 50-346/87-09 on 870319-0403 (Ref 10CFR73.21).Violation Noted:Failure to Control Access to Vital Area as Required
ML20206Q191
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/15/1987
From: Byron P, Creed J, Defayette R, Drouin B, Kosloff D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20206Q153 List:
References
50-346-87-09, 50-346-87-9, NUDOCS 8704210361
Download: ML20206Q191 (1)


Text

.

I

'

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-346/87009(DRP)

Docket No. 50-346 License No. NPF-3 Licensee: Toledo Edison Company Edison Plaza 300 Madison Avenue Toledo, OH 43652 Facility Name: Davis-Besse Nuclear Power Station, Unit 1 Inspection At: Davis-Besse Site, Oak Harbor, Ohio Inspection Conducted: March 19 through April 3, 1987 Inspectors:

k.

Y

$

P.' Byron U

Date '

Senior Resident Inspector d

l

-

D. Kosloff (f Date Resident Inspector lS

.'Drouin Date curity Inspector Approved By:

[

R. DeFayett6 Chief Date /

Projects Section 28 M

l g"feguardsSection R. Creed, Chief

[Iate

%

Inspection Summary Inspection on March 19 through April 3,1987 (Report No. 50-346/87009(DRP))

Areas Inspected: Reactive security inspection by Resident Inspectors in response to personnel access control event.

Results: One violation is identified below:

Access Control - Personnel: The licensee failed to control access to a vital area as required.

(Details: UNCLASSIFIED SAFEG'JARDS INFORMATION)

Enclosure contatns 8704210361 870415