ML20206Q148
| ML20206Q148 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 04/15/1987 |
| From: | Guldemond W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Shelton D TOLEDO EDISON CO. |
| Shared Package | |
| ML20206Q153 | List: |
| References | |
| NUDOCS 8704210352 | |
| Download: ML20206Q148 (2) | |
See also: IR 05000346/1987009
Text
- dMD
o,-n,
.
.
..
- -
-
. . . .
.
am
ut m >b
N -U T M
UhI
'
APR 15137
Docket No. 50-346
Toledo Edison Company
ATTN: Mr. Donald Shelton
Vice President
Nuclear
Edison Plaza
300 Madison Avenue
Toledo, OH 43652
Gentlemen:
This refers to the reactive security inspection conducted by Messrs. P. Byron,
D. Kosloff and 8. Drouin of this office on March 19 through April 3, 1987, of
activities at Davis-Besse Nuclear Power Station authorized by NRC Operating
License No. NPF-3 and to the discussion of our findings with Mr. L. Storz and
other members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice. A written response
is required.
We note your numerous actions initiated in response to previous personnel
access control problems. We also note the expeditious manner in which the
Security Program responded to the violation; however, the fact that your
employee knowingly violated security procedures outweighs the initial positive
response of the Security Program to the violation.
Areas examined during this inspection concern a subject matter which is exempt
from disclosure according to Part 73, Title 10, Code of Federal Regulations,
Section 73.21(c)(2). This information must be handled and protected in
accordance with the provisions of 10 CFR 73.21.
Consequently, the enclosure
to this letter, our report of the inspection, and your response to the
violation identified in the enclosure to this letter will not be placed in
the NRC Public Document Room. Therefore, your statement of corrective action
regarding the violation identified in the enclosure should be submitted as
a separate enclosure to your transmittal letter in the manner prescribed.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
k
0
8704210352 070415
tn
PDH
ADOCK 05000346
v
G
OA~~A
I A 3 ~10
',\\!ErmM A rinal
Enclosure contains
un
uJnav
u v4u,uiiavi'
SAFEGU/RDS INFORMATI0h
Upon separation this
page is Decontrolled
-
,
a
e ---ammm
nir n n_g 3..,n g
,
moi ku v, si iv'u ; . . j ,LTE y, n ,
, y (
Toledo Edison Company
2
APR 151987
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
W. G. Guldemond, Chief
Projects Branch 2
Enclosures:
1.
2.
Inspection Report
.
No. 50-346/87009(DRP)
(UNCLASSIFIED SAFEGUARDS INFORMATION)
cc w/ enclosures:
L. Storz, Plant Manager
IE File
IE/DI/0RPB
IE/ES
NMSS/SGPL
NRR/PWR-B/SSPB
cc w/ enclosures, w/o
UNCLASSIFIED SAFEGUARDS
INFORMATION:
DCS/RSB(RICS)
Licensing Fee Management Branch
Resident Inspector, RIII
James W. Harris, State of Ohio
Robert M. Quillin, Ohio
Department of Health
State of Ohio, Public
Utilities Commission
,
RIII
RIII
RI I
RIT
f
in/mnj
[#
Guh
ond
ed
xe son
,
l
'
' '
OA~
n
h 3 3o
i rnnndA- j
4,
Enclosure contains
n
i
,
SAFEGUARDS INFORMATION i
un
. U
n \\ >v
a i viseven,
, u
3
Upon separation this
page is Decontrolled
-