IE Insp Rept 50-341/81-20 on 811201-31.NO Noncompliance Noted.Major Areas Inspected:Ie Bulletin & Circular Followup, LER Followup & IE Testimony for ASLB Hearing
ML20040G969
Person / Time
Site: Fermi 
Issue date: 01/25/1982
From: Byron P, Konklin J, Little B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20040G958 List:
References
50-341-81-20, NUDOCS 8202160677
Download: ML20040G969 (3)


Text

.

.

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-341/81-20 Docket No. 50-341 License No. CPPR-87 Licensee: Detroit Edison Company 2000 Second Avenue Detroit, MI 48226 Facility Name: Enrico Fermi Nuclear Power Station, Unit 2 Inspection At: Fermi Site, Monroe, MI Inspection Conducted: December 1-31, 1981 sf

Inspectors:

.H.LiNe

.I/2{/f2 fs

'M Byr I/K/7)B

-[

Approved By:

J.

. Konklin, Chief f/F/73

'

'

eactor Projects Section 2A Inspection Summary Inspection on December 1-31, 1981 (Report No. 50-341/81-20)

Areas Inspected: Routine resident inspector construction inspection consisting of IE Bulletin and Circular Followup, Licensee Event Followup, IE Testimony for ASLB Hearing, Participation in NRR/ Licensee Meeting and Plant Tours.

The inspection involved a total of 82 inspector-hours onsite by two NRC inspectors including 16 inspector-hours onsite during offshifts.

Results: No items of noncompliance or deviations were identified.

F202160677 820127 PDR ADOCK 05000341

PDR

,

_

q

=

.

,

. DETAILS-1.

Persons Conta'cted

  • T.

Aless1, Director Project.QA-H. Arcra, Startup Engineer

. W. Everett, Project Superintendent Construction

- *W.- Fahrner, Manager' Fermi-2 Project E. Griffing, Superintendent Nuclear Operations-

'*S. Noetzel, Site Manager-G. Trahey, Assistant Director Project QA H. W lker, QA Supervisor Construction D. Wells, Manager Quality Assurance

  • Denotes those attending monthly management meetings.

2.

IE Eulletin and Circular Followup IE Bulletins issued during this period: None IE Circulars-isstied during this period: None The inspectors have completed a status review of all IE Bulletins and Circulars which have been sent to the licensee. These items have been entered in the IE computer tracking system. Followup and closeout of these-items.will be documented in subsequent inspection reports.

No items of noncompliance-or deviations were identified.

3.

Licensee Event Followup

-

(0 pen) 10 CFR 50.55(e) Item-No. 81-09 Grout Spill Into Penetration (Licensee No. 48): While grouting around the flued head structural steel the form broke, allowing grout to: flow into the penetration sleeve of penetration X-43.

The' licensee believes some greut may have entered an area between the liner plate and ~ the concrete of the drywell.

Licensee review of this problem is continuing.

.

Followup and closeout of this item will be documented in subsequent inspection reports.

-No items of noncompliance or deviations were identified.

4.

IE Testimony for ASLB Hearing i

The inspectors prepared written testimony regarding the licensee's

~

l Quality Assurance / Quality Control activities, for use in the forth-i coming ASLB public hearings on Fermi-2.

No items of noncompliance or deviations were identified.

!

-2-ls._-

_

-.

.:

..,

_

,

15.

-Participation'in NRR/ Licensee Meeting

'

.

The inspectors participat'ed in an'NRR/ Licensee meeting regarding:

containment 1 isolation' valves in the purge and vent systems. The'

-associated audit involved;the inspection of purge and vent valve installation, and a review of' stress analysis and design documenta--

tion. :During the meeting NRC identified additional records and.

reports'needed for the review. sThe licensee committed to provide'

' the requested documents. - The need forf administrative' controls during valve operation _and maintenance was also discussed. The. licensee stated that procedures.will be developed'and implemented to~ provide these controls. A summary of the audit findings will be issued in a separate report.

Inspector review of. licensee's administ'rative-control regarding valve. operation and maintenance is pending. This matter is. assigned open item (341/81-20-01).

.No items of noncompliance-or deviations were identified.

-

6.

Plant Tours The inspectors conducted tours of the Reactor, Auxiliary,' Turbine Buildings, and the Rad Waste Area. These areas were inspected-for the maintenance of safety system integrity, control of fire hazards

.and general housekeeping. The licensee is effective inLthe control

.of these activities. The inspectors observed control room conduct including work control', shift turnover and the review of control room

'

logs. The inspector also observed operator performance-of Radiological Emergency Drills.

No items of noncompliance or deviations were identified.

7.

Exit Interview The inspectors met with licensee representatives (denoted in Paragraph 1)

at the conclusion of this inspection period. The-inspectors summarized the scope of the inspection findings. The inspectors also discussed NRC concerns relating to construction deficiencies found at!other construc-l'

tion sites. The licensee stated they were aware of those construction

problems, and were evaluating applicable construction activities at

'

Fermi-2.

!