U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENF C EMENT
REGION III
Report No. 50-341/81-14 Docket No. 50-341 License No.
CPPR-87 Licensee: Detroit Edison Company 2000 Second Avenue Detroit, MI 48226 Facility Name: Enrico Fermi Nuclear Power Station, Unit 2 Inspection At: Fermi Site, Monroe. MI Inspection Conducted: August 1-31, 1981 Inspectors: @
e'
/# ///8
' l# I Q
/
o
,
Nh M yne r-Approved By:
J. E. Konklin, Acting Chief M.11 198I i
Reactor Projects Section 2A
'
Inspection Summary, Inspection on August 1-31. 1981 (Report No. 50-341/81-14)
Areas Inspected: Routine resident inspector construction inspection consisting of Licensee action on previous inspection findings, IE Bulletin and Circular Follow-up,' Licensee Event Follow-up, ACRS Meeting and Plant Tours. The inspection involved a total of 78 inspector-hours onsite by two NRC inspectors including 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> onsite during off-shift.
Results: No items of noncompliance or deviations were identified.
0110070286
O
.
k
-
-
-
.
.
.
. -
.
.
m
--
-
...
- - -
-
.
-
.
.
-
-
.
.
DETAIIS 1.
Persons Contarg T. Alessi, Director Project QA W. Boulter, Assistant Project Manager Construction J. Cartmill, Assistant Project Superintendent Maintenance W. Everrett, Director Project Controls W. Fahrner, Manager Fermi 2 Project
- E. Griffing, Plant Superintendent
- J. Gessner, Assistant Profect QA Director A. Godoshian, Project Superintendent Construction & Maintenance
- G. Newton, Supervisor Operational Assurrance
- Denotes those attending monthly management meetings.
2.
Licensee Action on Previous Inspection Findings (Open) Noncompliance '(50-341/81-09-01) Storage and preservation of QA records. The licensee has reported on actions taken and planned in regard to this matter. This matter is pending inspector's review.
Follow-up and close out of this item will be documented in a subsequent inspection report.
(Open) Noncompliance (50-341/81-07-01) Incorrect Penetrameters.
The licensce has issued an interim report on actions taken or planned.
Follow-up and close out of this matter is pending inspector's review of licensee's. final report scheduled to be submitted by September 30, 1981.
No items of noncompliance or deviations were identified.
3.
IE Bulletin and Circular Follow-up IE ' Bulletins issued during this period:
81-02 Suppl.1, Failure of Gate Type Valves To Closo Against Lifferential Pressure.
.
IE Circulars issued during this period: None.
Follow-up and close out of this item will be documented in a subsequent inspection report.
No items of noncompliance or deviations were identified.
Licensee Event Follow-up The licensee has issued final reports on the following 10 CFR 50 55(e)
items:
'
a. ' Removal of Pipe supports after inspection b.
Inadequate penetration for Dravo Lug Welds c.
Spacing of concrete anchors Follow-up and close out of these items will be documented in subsequent inspection reports.
- -2.
-
_ _ -..
-
_
.
_
_
__
r
.
.J No items of noncompliance or deviations were identified.
Advisory Committee of Reactor Safety (ACRS) Full Committee Hearing Tha inspector attended the ACRS Committee meeting on August 6,1981 con-cerning DECO's application for a permit to operate Fermi II.
The Committee recommended to the Commission, after querying DECO & the NRC Staff, that Fe mi II be given an operating license if due. con-sideration is given to recommendations made by the committee and including resolution of the outstanding issues contained in the NRC's Staff's Safety Evaluation Repcrt.
6.
Plant Tours The inspectors conducted tours of the RHR Complex, the Reactor, Auxiliary and Turbine Buildings. The inspectors observed work control and general housekeeping practices. The inspectors reviewed control room logs and observed shift turnover.
No items of noncompliance or deviations were identifiedy
.E_xit Interview The inspectors met with licensee representatives (denoted in paragraph 1)
at the conclusion of this inspection period. The inspectors summarized the scope of the inspection findings.
f
i l
I
!
-3-
-
. -.
-.
- -.
-