U.S. NUCLEAR REGUIATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMDIT
REGION III
Report No. 50-341/81-15 Docket No. 50-341 License No.
CPPR--87 Licensee: Detroit Edison Company 2000 Second Avenue Detroit, MI 48226 Facility Name: Enrico Fermi Nuclear Power Station, Unit 2
' Inspection' At: Fermi Site, Monroe, MI Inspection Conducted: September 1-30, 1981
[
/Lr[F /97/ -
Inspectors:
B. H. Little'
g cf e b
M/
/9{/
P. M. Byron V'KE Approved By:
J. E. Ko in, Acting Chief hen. N _ I97 [.
'
Iteacto Projects Section 2A Inspection Summary Inspection on September 1-30, 1981 (Report No. 50-341/81-15)
Areas Insnected: Routine resident inspector construction inspection consisting of Licensee action on previous inspection findings, IE Bulletin and Circular Follow-up,
-LicenseeEventFollow-up,NRR/LicenseeMeetings,andPlantTours. The inspection involved a total of 74 inspector hours onsite by two NRC inspectors including 4 inspector hours onsite during off shift.
Results: No items of noncompliance or deviations were identified.
-
.
i
..e :...
.
.
.
DETAIIS 1.
Persons - Contacted W. Boulter, Aseistant Project Manager Construction
- W. Farhner, & nager Fermi 2 Project
- E. Griffing, Plant Superintendent J. Gessner, Assistant Project QA Director A. Godoshian, Project Superintendent Construction and Maintenance S. Noetzel, Assistant Project Manager Controls H. Walker, Section Supervisor QA Construction
- Denotes those attending monthly management meetings.
2.
Licensee Action on Previous Inspection Findings (Closed) 10 CFR 50 55(e) Lic. No. 46, defective schedule 80 pipe.
Licensee evaluation of the= minimum wall thickness of the subject pipe has been completed.
DECO Engineering determined that the minimum thickness noted was adequate to handle the design pressure.
The licensee has withdrawn this as a 50 55(e) reportable item.
(Closed) Noncompliance (81-0941). Storage and Preservation of QA Records. The inspector reviewed recently issued procedures; PQAP-9139andW/BQ-117 The inspector censiders licensee's
'
actions for the protection of QA records to be adequate.
No items of noncompliance or deviaticns were identified.
IE Bulletin and Circular Follow-up IE Bulletins issued during this period: None.
IE Circulars iscued during this period:
81-13, Torque Switch Electrical Bypass Circuit for Safeguard Service Valve Motors.
Follow-up and close out of this item will be documented in a sub-sequent inspection report.
No items of noncompliance or deviations were identified.
Licensee Event Follow-up Open) 10 CFR 50 55(e) Item No. 81-07 Defective ITE Circuit Breakers Licensee #47) Licenaee's evaluation of IE Information Notice 80-31) lead to the identification of defective breaker operation-2-
,
.--
--
- --
,,
-.
.
...
,
,
-
_.,.
~.
,
,
.*.':
.
.
.
in addition to those breakers listed in the above notice. Subsequent
' testing of 1600 AMP ITE Gould breakers determined that failure
-
wouldoccurwiththebreakerinthefullyconnected(operating)
position. Licensee investigation of this problem is continuing.
Follow-up and close out of thie item will be documented in subsequent inspection reports.
No items of noncompliance or deviations were identified.
Participation in NRR/ Licensee Meeting The inspector with NRC Headquarters Staff met with the licensee to assess construction and testing status and review projected schedules regarding Fermi 2 fuel load date. Areas assessed included; current status of construction and testing, design and engineering, procurement activities, critical path items and areas having potential schedular impact. Plant tours were also performed.
The licensee was responsive in providing needed information, documents and schedules. ' Review of the material received is in progress. -
A summary of findings will be issued subsequent to the completion of this review.
No items of noncompliance or deviations were identified.
6.
Plant Tours The inspectors conddcted tours of the. RHR Complex and the Reactor, Auxiliary, and Turbine Buildings. The inspectors reviewed control room logs, reviewcd work controls and shift turnover. Reactor building. areas, including drywell and torus areas were inspected for general housekeeping practices and potential fire hazards.
The licensee continues to provide effective controls in this area.
No items of noncompliance or deviations were identified.
Exit Interview The inspectors met with licensee representatives (denoted in i
paragraph 1) at the conclusion of this inspection period. The inspectors summarized the scope of the inspection findings.
_
i
!
.
i-3-
.
.
.
p
..
.
.
m
..
.
.