ML20040G957

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-341/81-20 on 811201-31.No Noncompliance Noted
ML20040G957
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/27/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wells D
DETROIT EDISON CO.
Shared Package
ML20040G958 List:
References
NUDOCS 8202160665
Download: ML20040G957 (2)


See also: IR 05000341/1981020

Text

-

-

..

,

,

~JF 2 7 E82.

os c /q

Q'

'/

c7

.

e

Docket No. 50-341

jy ~NWel,

-

y

'~ C 01 ;3 JJq 2N

~ '

dC

The Detroit Edison Company

' q{ #*

Q #w"CQ;j[4

&

ATTN:

Mr. - Donald A. Wells

k-

M

Manager, Quality Assurance

%A

2000 Second Avenue

/

@

Detroit, MI 48226

'b f,,

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. B. H. Little

and P. M. Byron of this office on December 1-31, 1981, of activities at Enrico

Fermi Nuclear Power Station, Unit 2, authorized by NRC Construction Permit

No. CPPR-87 and to the discussion of our findings with Mr. E. Griffing at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that c new due date may be estab-

lished. Consistent with'Section 2.790(b)(1), any_such application must

be accompanied by an affidavit executed by the. owner of the information

which identifies the document or part sought tc be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

,

7:

8202160665 820127

DR ADOCK 05000g

ZEo

/

-

.

.

- __ _ __

-

-

.

,

Detroit Edison Company

-2-

January 27, 1982

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the_specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspectien.

Sincerely,

" Original signed by R.L. Spessard"

R. L. Spessard, Director

Division of Resident and

Project Inspection

Enclosure:

Inspection Report

No. 50-341/81-20

cc w/ encl:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Harry H. Voigt, Esq.

I

,

RII

RIII

RII[

n

er

Spe sard

1/25/82

8/2cg

_ _ _ _ _ _ _ _ _ _ _ _ _