Forwards IE Insp Rept 50-341/81-14 on 810801-31.No Noncompliance Noted
ML20031C548
Person / Time
Site: Fermi 
Issue date: 09/21/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Well D
DETROIT EDISON CO.
Shared Package
ML20031C549 List:
References
NUDOCS 8110070276
Download: ML20031C548 (2)


See also: IR 05000341/1981014

Text

_

.

s

SEP 21 1981

f

g,,g ?

,

Docket No. 50-341

The Detroit Edison Company

t.'

00T G 1981d9

ATTN: Mr. Donald A. Wells

u.s. mm magg

Manager, Quality Assurance

g

coa m assa ,

'

2000 Seccnd Avenue

7(

Detroit, MI 48226

j

FG

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. B. H. Little

i

and P. M. Byron of this office on August 1-31, 1981, of activities at Enrico

Fermi, Unit 2, authorized by NRC Construction Permit No. CPPR-87 and to the

discussion of our findings with Mr. E. Griffing at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

tb3 inspection. Within these areas, the inspection consisted of a selective

exsmination of procedures and representative records, observations, and

interviews with personnel.

l

4

No items of noncompliance with NRC requirements were identified during

the course of this insp=ction.

In et.cordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CPR 9 5 (a)(7)(4),

it is necersary that you (a) notify this office by telephone within seven

days from t' e date of this letter of your intention to file a request for

r

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a wrin en ap(plication to this office to withhold such infor-

mation. Section 2 790 b) (1) requires that any such application must be

.'

accomp?nied by an affidavit executed by the owner of the information which

identiftes the document or part sought to be withheld, and which contains

.

8

-

I( g

8110070276810g

PDR ADOCK 0500

-

i

O

- -

-

.

.

...

.

.

The Detroit Edison Company

-2-

a full statement of the reasons which are the bases for the claim that the

information should be withheld from public disclosure. This section further

requires the statemtat to address with specificity the considerations listed

in 10 CFR 2 790 (b) (4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard withih the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you_ have concerning this inspection.

Sincerely,

& f.

wL

.

R..L. Spessar , Director

Division of Resident and

Project Inspection

Enclosure: IE Inspection

Report No. 50-341/81-14

l

ccv/cnc1:

i

DMB/ Document Control Desk (RIDS)

Resider.t Inspector, RIII

Ronald Callen, Michigan

!

Public Service Commission

Eugene B. Thomas, Jr.,

Attorney

i

I

i

F

b

RIII

RIII

RIII

RIII k 3

RIf

~e

e

on

Konklin

-

Knop [N

Spd

.

l

1

i

~

-. . .

.

.- . . . .-

-.

.-

.-