August 28, 2025

SUBJECT:

UPDATED INSPECTION PLAN FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2025005)

Dear David Rhoades:

The enclosed inspection plan lists the inspections scheduled through June 30, 2027, for the James A. FitzPatrick Nuclear Power Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. As discussed in SECY-25-0045, Recommendations for Revising the Reactor Oversight Process, dated June 5, 2025 (ML25042A278), the NRC determined that a broad, comprehensive review of the Reactor Oversight Process (ROP) is necessary to reflect improvements in industry performance and advancements in technology. The outcome of the comprehensive review and recommendations to revise the ROP baseline inspection program, when approved by the NRC Commission, will require a revision to this inspection plan. The NRC will contact you as soon as possible to discuss any revisions after the new baseline inspection program is implemented.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5358 with any questions you have regarding this letter.

Sincerely, Sherlyn I. Haney, Acting Chief Projects Branch 1 Division of Operating Reactor Safety

Docket No. 05000333 License No. DPR59

Enclosure:

FitzPatrick Inspection Plan

cc w/encl: Distribution via ListServ SHERLYN HANEY Digitally signed by SHERLYN HANEY Date: 2025.08.28 08:31:46 -04'00'

ML25237A222

SUNSI Review

Non-Sensitive Sensitive

Publicly Available Non-Publicly Available

OFFICE RI/DORS RI/DORS

NAME DBeacon SHaney

DATE 8/25/2025 8/25/2025

Site Inspection Activity Plan FitzPatrick 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count EP Exercise Inspection - Fitzpatrick

1 7/14/2025 7/17/2025 IP 71114.01 000716 Exercise Evaluation

7/14/2025 7/17/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

7/14/2025 7/17/2025 IP 71151 001397 Performance Indicator Verification PI&R Biennial Team Inspection - FitzPatrick

1 7/14/2025 7/18/2025 IP 71152B 000747 Problem Identification and Resolution

7/21/2025 7/25/2025 IP 71152B 000747 Problem Identification and Resolution ISFSI - IP 60859 License Renewal

1 7/15/2025 7/16/2025 IP 60859 Independent Spent Fuel Storage Installation (ISFSI) License Renewal Inspection RP - 71124.07 REMP

1 8/4/2025 8/8/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program Access Control, Maintenance, Sec Trng, SPR, PIs - FP

1 9/15/2025 9/19/2025 IP 71130.02 000734 Access Control

9/15/2025 9/19/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

9/15/2025 9/19/2025 IP 71130.07 000739 Security Training

9/15/2025 9/19/2025 IP 71130.09 001656 Security Plan Changes

9/15/2025 9/19/2025 IP 71151 001338 Performance Indicator Verification RP - 71124.08 Rad Transportation PIV

1 10/20/2025 10/24/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation

10/20/2025 10/24/2025 IP 71151 000746 Performance Indicator Verification Cyber Security - Fitzpatrick

1 10/20/2025 10/24/2025 IP 71130.10 000741 Cybersecurity FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - FP

1 3/23/2026 3/27/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

4/13/2026 4/17/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Comprehensive Engineering Team Inspection - FitzPatrick

1 4/27/2026 5/1/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection

5/11/2026 5/15/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection Fitz Biennial Requal Inspection

1 5/4/2026 5/8/2026 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance RP 71124.03 Fitz

Prepared on 8/25/2025 8:48:08 AM 1 of 2

Site Inspection Activity Plan

5/4/2026 5/8/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Sec - Access Control, SPR, PI Verification - FP

1 7/27/2026 7/31/2026 IP 71130.02 000734 Access Control

7/27/2026 7/31/2026 IP 71130.09 001656 Security Plan Changes

7/27/2026 7/31/2026 IP 71151 001338 Performance Indicator Verification EP Program Inspection - Fitzpatrick

1 8/3/2026 8/7/2026 IP 71114.02 000717 Alert and Notification System Testing

8/3/2026 8/7/2026 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

8/3/2026 8/7/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

8/3/2026 8/7/2026 IP 71114.05 000720 Maintenance of Emergency Preparedness

8/3/2026 8/7/2026 IP 71151 001397 Performance Indicator Verification 2026 Fitzpatrick Initial Operator Licensing Exam

1 7/6/2026 7/10/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

8/17/2026 8/21/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

RP 71124.04 Fitz

1 8/17/2026 8/21/2026 IP 71124.04 000728 Occupational Dose Assessment Inservice Inspection - FitzPatrick

1 9/21/2026 9/25/2026 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP 71124.01 and PIV Fitz

1 9/21/2026 9/25/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

9/21/2026 9/25/2026 IP 71151 000746 Performance Indicator Verification RP 71124.01 Rad Hazards

1 5/3/2027 5/7/2027 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Sec - Access Control, Equipment Testing and Maintenance, Protective Strategy, SPR, TSR, PI - Fitz

1 5/10/2027 5/14/2027 IP 71130.02 000734 Access Control

5/10/2027 5/14/2027 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

5/10/2027 5/14/2027 IP 71130.05 000737 Protective Strategy Evaluation

5/10/2027 5/14/2027 IP 71130.09 001656 Security Plan Changes

5/10/2027 5/14/2027 IP 71130.14 000743 Review of Power Reactor Target Sets

5/10/2027 5/14/2027 IP 71151 001338 Performance Indicator Verification RP 71124.05 Instruments

1 6/7/2027 6/11/2027 IP 71124.05 000729 Radiation Monitoring Instrumentation Prepared on 8/25/2025 8:48:08 AM 2 of 2