February 20, 2025

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000333/2025401

Dear David Rhoades:

On February 13, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at James A. Fitzpatrick Nuclear Power Plant and discussed the results of this inspection with Alex Sterio, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Brice A. Bickett, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security

Docket No. 05000333 License No. DPR-59

Enclosure:

As stated

Inspection Report

Docket Number:

05000333

License Number:

DPR-59

Report Number:

05000333/2025401

Enterprise Identifier: I-2025-401-0012

Licensee:

Constellation Energy Generation, LLC

Facility:

James A. Fitzpatrick Nuclear Power Plant

Location:

Oswego, New York

Inspection Dates:

February 3, 2025 to February 13, 2025

Inspectors:

K. Hussar, Senior Physical Security Inspector

S. McCarver, Physical Security Inspector

M. Ordoyne, Physical Security Inspector

C. Davis, Physical Security Inspector

Approved By:

Brice A. Bickett, Chief

Security, Emergency Preparedness and Incident Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at James A. Fitzpatrick Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were

===evaluated:

Access Authorization===

(1) Tier I: All Tier II: 6 requirements (02.05 a, b; 02.06 a, b; 02.07 a, b)

Tier III: 4 requirements (02.09; 02.10 a - c)

71130.08 - Fitness-For-Duty Program

The inspectors evaluated the fitness for duty program by completing the following inspection

===elements:

Fitness-For-Duty Program===

(1) Tier I: All Requirements Tier II: 28 Requirements (02.05 a - l, 02.06 a - e, 02.07 a, b, d, e, 02.08 a - c, 02.09 a, b, d, e)

Tier III: 10 Requirements (02.10, 02.11 a, 02.12 a, 02.13 a - e, 02.14 a, b)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On February 13, 2025, the inspectors presented the security baseline inspection results to Alex Sterio, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.01

Corrective Action

Documents

04810380

04560239

04723823

04554650

04713952

04785539

04732081

Procedures

SY-AA-103-500

Access Authorization Program

Revision 18

SY-AA-103-506

Utilizing the Personnel Access Data System (PADS)

Revision 18

SY-AA-103-507

Review Criteria for Determining Trustworthiness and

Reliability

Revision 9

SY-AA-103-511

Access Authorization In-Processing/Out-processing of

Personnel

Revision 27

SY-AA-103-514

Site Authorization for Unescorted Access

Revision 23

Self-Assessments NOSA-JAF-25-02

FFD & AA Audit Report

February 05,

25

71130.08

Miscellaneous

Fitness-for-Duty and Behavior Observation Lesson Plan

Revision 4

MedTox Laboratory Audit

05/06/2024

Procedures

LS-AA-119

Fatigue Management and Work Hour Limits

Revision 17

SY-AA-101-145

Security Standards of Conduct

Revision 19

SY-AA-102

Constellation Fitness for Duty Program

Revision 23

SY-AA-102-245-

F-01

Alco-Sensor Calibration Check/Calibration Log

Revision 1

SY-AA-102-F-02

For Cause Test Evaluation

Revision 0

SY-AA-102-F-04

Treatment Plan and Follow-up Testing Acknowledgement

Form

Revision 0