February 20, 2025
SUBJECT:
JAMES A. FITZPATRICK NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000333/2025401
Dear David Rhoades:
On February 13, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at James A. Fitzpatrick Nuclear Power Plant and discussed the results of this inspection with Alex Sterio, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Brice A. Bickett, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security
Docket No. 05000333 License No. DPR-59
Enclosure:
As stated
Inspection Report
Docket Number:
05000333
License Number:
Report Number:
Enterprise Identifier: I-2025-401-0012
Licensee:
Constellation Energy Generation, LLC
Facility:
James A. Fitzpatrick Nuclear Power Plant
Location:
Oswego, New York
Inspection Dates:
February 3, 2025 to February 13, 2025
Inspectors:
K. Hussar, Senior Physical Security Inspector
S. McCarver, Physical Security Inspector
M. Ordoyne, Physical Security Inspector
C. Davis, Physical Security Inspector
Approved By:
Brice A. Bickett, Chief
Security, Emergency Preparedness and Incident Response Branch
Division of Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at James A. Fitzpatrick Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.01 - Access Authorization
The inspectors evaluated the access authorization program. The following elements were
===evaluated:
Access Authorization===
- (1) Tier I: All Tier II: 6 requirements (02.05 a, b; 02.06 a, b; 02.07 a, b)
Tier III: 4 requirements (02.09; 02.10 a - c)
71130.08 - Fitness-For-Duty Program
The inspectors evaluated the fitness for duty program by completing the following inspection
===elements:
Fitness-For-Duty Program===
- (1) Tier I: All Requirements Tier II: 28 Requirements (02.05 a - l, 02.06 a - e, 02.07 a, b, d, e, 02.08 a - c, 02.09 a, b, d, e)
Tier III: 10 Requirements (02.10, 02.11 a, 02.12 a, 02.13 a - e, 02.14 a, b)
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On February 13, 2025, the inspectors presented the security baseline inspection results to Alex Sterio, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
04810380
04560239
04723823
04554650
04713952
04785539
04732081
Procedures
Access Authorization Program
Revision 18
Utilizing the Personnel Access Data System (PADS)
Revision 18
Review Criteria for Determining Trustworthiness and
Reliability
Revision 9
Access Authorization In-Processing/Out-processing of
Personnel
Revision 27
Site Authorization for Unescorted Access
Revision 23
Self-Assessments NOSA-JAF-25-02
February 05,
25
Miscellaneous
Fitness-for-Duty and Behavior Observation Lesson Plan
Revision 4
MedTox Laboratory Audit
05/06/2024
Procedures
Fatigue Management and Work Hour Limits
Revision 17
Security Standards of Conduct
Revision 19
Constellation Fitness for Duty Program
Revision 23
SY-AA-102-245-
F-01
Alco-Sensor Calibration Check/Calibration Log
Revision 1
SY-AA-102-F-02
For Cause Test Evaluation
Revision 0
SY-AA-102-F-04
Treatment Plan and Follow-up Testing Acknowledgement
Form
Revision 0