September 29, 2025

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000333/2025402

Dear David Rhoades:

On September 18, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at James A. Fitzpatrick Nuclear Power Plant and discussed the results of this inspection with Alex Sterio, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Brice A. Bickett, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety & Security

Docket No. 05000333 License No. DPR-59

Enclosure:

As stated

Inspection Report

Docket Number:

05000333

License Number:

DPR-59

Report Number:

05000333/2025402

Enterprise Identifier: I-2025-402-0006

Licensee:

Constellation Energy Generation, LLC

Facility:

James A. Fitzpatrick Nuclear Power Plant

Location:

Oswego, New York

Inspection Dates:

September 15, 2025 to September 18, 2025

Inspectors:

C. Davis, Physical Security Inspector

J. Edwards, Physical Security Inspector

K. Hussar, Senior Physical Security Inspector

Approved By:

Brice A. Bickett, Chief

Security, Emergency Preparedness and Incident Response Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at James A. Fitzpatrick Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)19 Requirements (02.01 c - e; 02.02 c - g; 02.03 a; 02.04 b, c, e; 02.05 a; 02.06 a - c; 02.07 a; 02.08 d; 02.09).

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from IP:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)38 Requirements (02.01.a; 02.02.a - i; 02.03.a - c; 02.04.a - g; 02.06.b, d, e; 02.07.a - d; 02.08.a, b, d, e; 02.09.a, b; 02.10.a; 02.11.a, b; 02.12.a; 02.14)

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

===procedure elements:

Security Training===

(1)15 Requirements (02.02 c, d, e, h; 02.03 a, b, c; 02.04 a, b; 02.05 a, b, c, d; 02.06 b; 02.10)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

procedure elements: Security Plan Changes

(1) Since the last NRC baseline inspection of this program area, Security Plan Revision 26 and 27 were implemented. Based on Fitzpatrick's evaluation, and in accordance with 10 CFR 50.54(p)(2), the change(s) resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan changes continues to meet the requirements of 10 CFR 73.55(b). The inspector conducted a review of the security plan changes to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of those changes. Therefore, the changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) April 1, 2024 through June 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 18, 2025, the inspectors presented the security baseline inspection results to Alex Sterio, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

04791553

04791847

04794477

04821981

04825965

04827141

04827758

04828036

04828317

04829452

04833037

04833430

04842329

04853814

04875468

04839245

Procedures

SY-AA-101-106

Control and Classification of Safeguard Information (SGI) and

Sensitive Unclassified Non-Safeguards Information (SUNSI)

Revision 23

SY-AA-101-112-

104

Protected Area Search Processes

Revision 1

SY-AA-101-117

Processing and Escorting of Personnel and Vehicles

Revision 35

SY-JF-101-117

Security Owner Controlled Area and Protected Area Access

Controls

Revision 11

71130.04

Procedures

SY-AA-101-122

Testing Security Equipment

Revision 24

SY-AA-101-122-

101

Performance of Perimeter Intrusion Detection / Camera

System Tests

Revision 1

SY-AA-101-122-

103

Performance of Access Control Device and Portal Tests

Revision 1

SY-AA-101-122-

104

Performance of Special Purpose Detector, Communication,

Lighting, and Biometrics Threshold Tests

Revision 1

SY-AA-150-103

Firearms Maintenance, Testing, and Accountability

Revision 3

71130.07

Corrective Action

04784271

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

04796110

04811458

04870150

04872153

Procedures

SY-AA-150-101

Constellation Nuclear Security Training

Revision 4

SY-AA-150-103

Firearms Maintenance, Testing, and Accountability

Revision 3

SY-AA-152

Tactical Course Development, Approval, and Conduct

Revision 7

71130.09

Corrective Action

Documents

04831452

Procedures

Physical Security Plan, Training and Qualification Plan and

Safeguards Contingency Plan

Revision 27

71151

Procedures

SY-AA-101-155

Security Events and Nuclear Regulatory Commission

Performance Indicators

Revision 11