IR 05000333/1978025

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-333/78-25 on 781115-16.Noncompliance Noted: Failure to Install Electrical Cables in Accordance W/Procedures
ML19249D656
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/06/1978
From: Ebneter S, Finkel A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19249D635 List:
References
50-333-78-25, NUDOCS 7909250164
Download: ML19249D656 (7)


Text

'

.

.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

'

Region I Report No.

50-333/78-25 Docket No.

50-333 Category C

License No.

DPR-59 Priority

--

Licensee:

Power Authority of the State of New York P. O. Box 41 Lycoming, New York 13093 Facility Name:

James A. FitzPatrick Inspection at:

Scriba, New York Inspection conducted:

November 15-16, 1978 Inspectors:

/1

[ /[

,

A. E. Firik'el,'Pe' actor Inspector

/ date signed date signed

/

date signed Approved by:

/

rf fz /g/7g S. D. Ebneter, Chief, Engineering

'date signed Support Section No. 2, RC&ES Branch Inspection Summary:

Inspection on November 15-16, 1978 (Report No. 50-333/78-25)

Areas Inspected:

Routine, unannounced inspection.

The inspection consisted of review of the plant fire program and IE Circular No. 78-04 Fire Door Closing.

The inspection involved 14 inspector-hours on site by one regional based in-spector.

Results:

Of the nine areas inspected, no items of noncompliance were identified in eight areas; one apparent item of noncompliance was identified in one area (Infraction - failure to install electrical cables in accordance with procedures, paragraph 9).

1023

~- J <7

~

-

7 909 2 5 0 Ml Region 1 Form 12

.

(Rev. April 77)

.

.

DETAILS 1.

Persons Contacted Power Authority of the State of New York J. Leonard, Resident Manager

  • R. Pasternak, Superintendent of Power
  • R. Baker, Maintenance Superintendent
  • W. Fernandez, Assistant Maintenance Superintendent
  • E. Abbot, Operations Superintendent
  • V. Childs, Assistant Resident Manager
  • M. Cosgrove, Site QA Engineer
  • denotes those present at the exit interview.

2.

Licensee Action on Previous Insoection Findinas (Closed) Unresolved Item (333/77-23-01):

Updating of equipment tags on Scott Air Packs and other respiratory equipment.

Section IX of the Emergency Plan and Procedure was rewritten to include instructions for dating self-contained breathing apparatus tags.

3.

Circular No. 78-04 (IE)

The inspector rev1ewed the status of the IE Circular No. 78-04 dealing with the installation of sliding fire doors.

The licensee has reviewed their sliding fire door design and installation and has issued work request No. 10827 which will correct their problem.

During installation FitzPatrick installed a cap to the fusible link terminal eye anchor hook. This design prevents the terminal eye from falling free in the event of an automatic closure. The design has been corrected and is documented in a licensee's letter dated June 5, 1978, and work request No.

10827. This problem is not the same as referenced in IE Circular No. 78-04. After reviewing the above work request No. 10827, the inspector had no further questions on this matter.

1023 B3

.

.

4.

Work Control Procedures The inspector verified that there are work control procedures which define requirements for approval and control of modifications and maintenance activities. They are listed below.

10.1.1, Procedure for Control of Maintenance, dated July 25,

--

1978.

10.1.2, Equipment and Personnel Protection Tagging, dated

--

August 25, 1978.

10.1.4, Procurement of Materials and Services, dated May 2,1978.

--

--

10.1.5, Control and Identification of Purchased Material and Services, dated April 1,1977.

10.1.6, Control of Modifications, dated September 15, 1978.

--

--

10.1.7, Housekeeping and Cleanliness Control, dated July 26, 1978.

AP-1.4, Control of Plant Procedures, dated February 16, 1978.

--

AP-1.7, Quality Assurance Program, dated April 1, 1977.

--

AP-3.1, Procedure for Maintenance Procedures, dated October

--

31, 1977.

--

AP-3.2, Control of Special Process Procedures, dated April 1, 1977.

--

AP-9.1, Preparation, Review, and Approval of Indoctrination and Training Procedures, dated April 1, 1977.

AP-10.1, Control of Work Activity Control Procedures, dated

--

August 18, 1978.

No items of noncompliance were identified.

1023 ;J')

.

.

.

5.

Quality Assurance Surveillance a.

The inspector verified that there were quality assurance procedures that require periodic audit of work authorization for modifications and maintenance activities to verify that operating personnel are controlling these activities.

The following procedures were effective at the time of this inspection:

Power Authority of the State of New York (PASNY) - Quality

--

Assurance Program Manual for Nuclear Plant Operations; and PASNY Quality Assurance Procedures Manual.

--

Section 18 of the QA Program Manual (PASNY) requires audits to be conducted periodically. The frequency of audits is based on the importance to safety, quantity, and complexity of the work performed, the schedule for work accomplished, the results of previous audits, and the severity of previously reported nonconformances. Quality Control Procedure (QCP) - 8.0, Inspection of Quality Related Activities, requires the inspection and verification of activities that includes repair and rework, maintenance, modifications, and installation.

The inspector reviewed QC Audit No. 274E-1 dated August 1, 1978, entitled

" Operating Technical Specification Section 4.12 - Fire Pro-tection Systems." The audit was performed to determine if procedures exist for the implementation of the requirements of the subject section of the Technical Specifications.

b.

The inspector reviewed the log of Work Request (WR) and verified that quality control surveillance was periodically performed during modification and maintenance activities to assure that they were authorized and that they conformed with established plant controls.

No items of noncompliance were identified.

1023 30

.

.

1 6.

Desian Change Control The inspector verified that an administrative procedure has been established to control plant modifications and repairs.

This procedure, Administrative Procedure (AP) 10.1 entitled " Control of Work Activity Control Procedure," Revision 1, dated August 18, 1978, provides that:

A safety analysis be performed after engineering design is

--

completed.

(A guide is provided for the analysis in AP 1.2 entitled " Plant Operations Review Committee" (PORC));

All modifications are controlled by the use of " Station

--

Design Forms" and " Plant Modification Control Forms;" and A Station Operations Review Committee review be accomplished

--

after the safety analysis.

The modification control form lists all procedural review / approval requirements and provides space for documenting their accomplishment.

No items of noncompliance were identified.

7.

Emergency Procedure a.

The inspector verified that the James A. FitzPatrick Nuclear Power Plant Emergency Plan and Procedures Manual requires fire and emergency drills.

Under Section entitled " Spectrum of Emergencies" the following subjects are discussed.

Radiation Emergencies

--

. Fire-fighting

'

--

Rescue

--

Contaminated Injury

--

--

Natural Disasters and Inclement Weather

--

Accidental Release of Radioactive Liquid to the Lake Revisions to Emergency Plans, Training, and Drills

--

1023 3W

.

b.

The inspector verified that there was a plant procedure that provides alternate methods for accomplishing an orderly plant shutdown.

Procedure F-0P-13, Section G, Paragraph 3, describes the method to provide raw water (lake) into the RHR system to accomplish an orderly plant shutdown in the event of loss of normal and preferred alternative coolant.

No items of noncompliance were identified.

8.

Fire Inspection Report The inspector reviewed the most recent available fire inspection report of the Hartford Steam Boiler Inspection and Insurance Company /Americum Nuclear Insurer sinspection of f.ugust 21, 1978.

The insurer's report found no items requiring additional action.

No items of noncompliance were identified.

9.

Facility Insoection The inspector toured the Control Room, Relay Room, Cable Spreading Room, Emergency Diesel Generator Rooms, Electric and Diesel Fire Pump Rooms, and portions of the Reactor Building.

Items examined by the inspector were the self contained breathing apparatus in the Control Room and Emergency Equipment Cabinet locks (across from lunchroom) Fire Cabinets, interior cabinets in the control room and randomly selected fixed and portable firefighting equipment and the records of the licensee's inspections of this equipment.

During inspection of the relay room and the cable spreading room the inspector found safety related cable trays in the following condition:

--

Relay Room: Cable lRDWNNX022 coiled, with end taped, laying on top of safety related cables in tray 1TX181B/lTX1668.

Approximately 50 feet of cable IRDWNNX022 was lying in the tray.

The 1RDWNNX022 cable should Have been pulled to the Auxiliary Relay Cabinet AR-6A panel AR-7 in the Relay Room.

--

Cable Spreading Room: The following cables were coiled and laying over safety related cables in the trays listed:

-

Cable 1C1NNNX194 cable end not covered, tray 1TX064B/

lTX0698.

Cables in trays 1TX041B, 1TX0698, 1TX073B, and 1TC193B/

-

1TC172B.

1023 342

.

-

"

.

.

The procedure for installation of electrical equipment dated April 1976, No. CMP 9.2-4.76 paragraph 5.3, states in part

...After installation, tie cables to tray rungs at the intervals

"

specified below, with additional ties in fittings where necessary to maintain fixed positions...." The licensee had not complied with this installation requirement. The inspector informed the licensee that the above was contrary to 10 CFR 50, Appendix B, Criteria V, and FSAR Section 8.5.3.

(333/78-25-01)

10.

Exit Interview The inspector met with the licensee representatives (denoted in paragraph 1) at the conclusion of the inspection on November 16, 1978. The inspector summarized the purpose and the scope of the inspection and the findings.

1023

.;43

.