IR 05000327/1982002
| ML20041C991 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 02/09/1982 |
| From: | Crlenjak R, Quick D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20041C986 | List: |
| References | |
| 50-327-82-02, 50-327-82-2, 50-328-82-02, 50-328-82-2, NUDOCS 8203020721 | |
| Download: ML20041C991 (4) | |
Text
.
UNITED STATES
D"i NUCLEAR REGULATORY COMMISSION
$
E REGION 11
o 101 MARIETTA ST., N.W., SUITE 3100 Y
ATLANTA, GEORGIA 30303 g.....o Report Nos. 50-327/82-02 and 50-328/82-02 Licensee: Tennessee Valley Authority 500A Chestnut Street Chattanooga, TN 37401 Facility Name:
Sequoyah Nuclear Plant Docket Nos. 50-327 and 50-328 License Nos. DPR-77 and DPR-79 Inspection at Sequo site near Soddy Daisy, Tennessee Inspector:
/
//u_A 88L
/
R. f. CrlenjaF ~
[/
D6te' Signed Approved by:
.2972.-
,
,
D. R. Quick, Se(tion Chief, Division of Resident Dhte' Signed and Reactor Project Inspection SUttitARY Inspection on January 18-22, 1982 Areas Inspected This routine, unannounced inspection involved 32 inspector-hours on site in the areas of nonconforming condition report (NCR) review and licensee event report (LER) review.
Results Of the two areas inspected, no violations or deviations were identified.
8203020721 820209 PDR ADOCK 05000327 O
.
_
.
.
DETAILS
1, Persons Contacted Licensee Employees J. H. ficGriff, Assistant Plant Superintendent R. L. Hamilton, Quality Assurance Supervisor C. W. Rice, QCRU Supervisor
'
M. R. Harding, Compliance Supervisor i
D. B. fliller, Engineering Aide, QCRU
H. R. Rogers, Compliance Engineer
"
A. M. Carver, Compliance Engineer R. N. Butler, QA Engineer All attended exit interview
2.
Exit Interview
,
The inspection scope and findings were summarized on January 22, 1982 with
,
those persons indicated in paragraph 1 above.
3.
Licensee Action on Previous Inspection Findings Not inspected.
,
4.
Unresolved Items
,
Unresolved items are were not identified during this inspection.
5.
Construction Deficiency Report Review (CDR)
The inspector reviewed the status of the following CDR's with site
personnel. The following licensee identified items (LII's) have been reported to RII by TVA.
a.
(0 pen) LII 328/82-02-01: Procurement Control Activities (M80-11)
l b.
(0 pen)LII 328/82-02-02: Inconsistent Establishment of Inspection
,
Program (NEB 8117)
c.
(0 pen) LII 328/82-02-03: Degraded Grid Voltage Time Delay (EEB 8114)
d.
(0 pen) LII 328/82-02-04: Power Operated Relief Valve (PORV) Operating jl
,
'
Time (NEB 8122)
e.
(0 pen) LII 328/82-02-05: Lack of Vendor Documentation en 460 Volt
>
!
Motor (EEB 8115)
.
., __ --- _-.. _. - - -. - _
-..-
. - -
-.
,,,m,_s
,. __-,_
...-m
__
.,,
--,.,.... _
. --
_,_
_
,.
.
f.
(0 pen) LII 328/82-02-06: Class 1E Electrical Components for ERCW Traveling Screens (NEB 8126)
(0 pen) LII 328/82-02-07: Reactor Coolant Drain Line (NCR 23P)
h.
(0 pen)LII 328/82-02-08:
Excessive Pressure Drops Across New ERCW Strainers (t1EB 8006R1)
1.
(0 pen) LII 328/82-02-09: Geared Limit Switch Cover fielting on Electrodyne liotor Operated valves (NCR 29P, NEB 8112)
j.
(0 pen) LII 328/82-02-10:
Flow Deficiency in ERCW System (SWP 8107)
k.
(0 pen)LII 328/82-02-11: Underrated Auxiliary flotors (EEB 8111)
1.
(Closed) LII 328/82-02-12:
RCP#3, Seal #1 Bypass Piping Analysis Error (CEB 8111) - The inspector reviewed the corrective actions specified in the final report and the completed work plan. This item.
is closed.
m.
(Closed) LII 328/82-02-13:
Steam Generator Blowdown line, loop 2 Piping Analysis Error (CEB 8112) - The inspector reviewed the corrective actions specified in the final report and the completed work plan.
This item is closed.
n.
(0 pen) LII 328/82-02-14: Componenet Cooling System Pump failures due to low voltage (EEB 8116)
o.
(0 pen) LII 328/82-02-15:
Practical considerations for Grid Restrictions (QAB 8102)
p.
(0 pen) LII 328/82-02-16:
Inadequately Revised ERCW Preoperational Test Instructions (NEB 8129)
q.
(0 pen) LII 328/82-02-17:
SI Pump Breaker Lockout Comn.ltment (NEB 8128)
r.
(0 pen)LII 328/82-02-18:
Deficiencies Affecting Foxboro Transmitter (EEB 8118)
No violations or deviations were identified.
6.
Licensee Identified Report (LER) Review The inspector reviewed the following LER's with site personnel, a.
(Closed) LER's,80-113 and 80-116:
The inspector reviewed the
'
corrective actions specified in the reports and the changes to the appropriate procedures.
4
,
,--
- -,, - - -,
,,. ~
, - - -,
. _., _ -.,
. _.
,
,, -
,.
.
b.
(Closed) LER, 80-149: The inspector reviewed the corrective actions specified in the report and toured the turbine driven' auxiliary feed pump areas to verify satisfactory completion of the modifications.
c.
(Closed)LER,80-184: The inspector reviewed the corrective action specified in the report and toured the area to verify satisfactory completion of the modifications.
d.
(Closed) LER's,80-208 and 80-209: The inspector reviewed the corrective actions specified in the report and Technical Instruction (TI-69) which was issued to prevent recurrance of the problem.
No violations or deviations were identified.
l
,
f i
i