Text
_
%
o R EGloN il
'
. c 101 M ARIETTA STREET. N.W
ATLANTA, GEORGI A 30303 o
September 22, 1982
%,
.....f Report Nos. 50-327/82-21 and 50-328/82-21 Docket Nos. 50-327 and 50-328 License Nos. DPR-77 and DPR-79 Licensee: Tennessee Valley Authority 500A Chestnut Street Tower II Chattanooga, TN 37401 Facility Name: Sequoyah 1, 2 Inspection at: Sequoyah Nuclear Site near Daisy, TN Date of Last Physical Security Inspection Visit: July 19-23,1982 Type of Inspection: Unannounced Physical Security
_f/_4#2.
Inspector v
D. E. Moore, Physical Security Inspector Oate igned j/tefigned Approved by:
y
D. R. McGuire, Chief Physical Protection Section Technical Inspection Branch Division of Engineering and Technical Programs Inspection Summary Areas Inspected:
Included Site Orientation; Security Plan and Implementing Procedures; Security Organization-Response; Security Program Audit: Records and Reports: Testing and Maintenance; Locks, Keys, and Combinations; Physical Barriers-Vital Areas; Security System Power Supply; Lighting; Communication; Additional Requirements for Power Reactor Personnel; and Safeguards Contingency Plan Implementation Review.
The inspection involved 34 inspector hours on site by one NRC inspector. The inspection was begun during an offshift perod; four inspection hours were accomplished during offshift periods Results: The licensee was found to be in compliance with NRC requirements within the areas examined during the inspection except for the following item:
Failure to complete security program audit ENCLOSU?2 CONTAINS.
UPON SEPARATION THIS PAGE 13 DECONIROI1ED. 8211080245 821101 DR ADOCK 05000327 PDR