Forwards IE Insp Repts 50-327/82-02 & 50-328/82-02 on 820118-22.No Noncompliance Noted
ML20041C984
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/09/1982
From: Cantrell F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20041C986 List:
References
NUDOCS 8203020717
Download: ML20041C984 (2)


See also: IR 05000327/1982002

Text

W/0

FEB 0 91982

gBLLQ

Tennessee Valley Authority

x

b

y

." 7'

' '

Q. -

ATTN: Mr. H. G. Parris

Manager of Power

. D

iTg

500A Chestnut Street Tower II

!

,,,0

_

4

1

-

9.-( Y k ['3:~.02d. p

Chattanooga, TN 37401

A

%"

~

1

!!

Gentlemen:

p s

.

4<,;

Subject: Report Nos

021M 50-328/82-02

kg[\\

'

This refers to the routine inspection conducted by f1r. R. V. Crlenjak of this

office on January 18-22, 1982, of activities authorized by NRC Operating License

Nos. DPR-77 and DPR-79 for the Sequoyah facility and to the discussion of our

findings held with fir. J. McGriff, Assistant Plant Superintendent, at the con-

clusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of thh letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter.

Such application must be consistent with the requirements

of2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. S. Cantrell, Acting Chief

Reactor Projects Branch 1, Division

of Resident and Reactor Project

Inspection

Enclosure:

Inspection Report Nos. 50-327/82-02

and 50-328/82-02

cc's see page 2

r203020717 820209

g

{DR ADOCK 05000

iI

.

.

.

.

-

Carolina Power & Light Company

2

FEB CD1932

cc w/ encl:

H. J. Green, Director of Nuclear Power

G. G. Stack, Project ibnager

C. C. Mason, Plant

Superintendent

fir. J. McGriff, Assistant Plant Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

bcc w/ encl:

NRC Resident Inspector

Document flanagement Branch

State of Tennessee

--

f

i

l

l

l

l

y

RII:RR{

RII

RI

RVbelenjak:gr

DRQuic;

FSCantrell

l

I

t//$/82

Q/ 9/82

J/9/82

l