IR 05000327/1982017

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Repts 50-327/82-17 & 50-328/82-17 on 820719-23.No Noncompliance Noted.Major Areas Inspected: Security Plan,Security Organization Mgt & Personnel.Details Withheld (Ref 10CFR73.21)
ML20058H977
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/04/1982
From: Mcguire D, Tillman A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20058H971 List:
References
50-327-82-17, 50-328-82-17, NUDOCS 8208090127
Download: ML20058H977 (1)


Text


---

-,

SAFEGUARDS INFQRMATION #

. g **49 UNITED STATE-2

. 4-g NUCLEAR REGULATORY COMMISSION p

yn REGION 11 a

"

s

!

/: g 101 MARIETTA ST., N.W SUITE 3100 '

Q

ATLANTA. GEORGIA 30303

\\,,,,,/

AUG 5 1982

,

Report Nos. 50-327/82-17, 50-328/82-17 Docket Nos. 50-327, 50-328 License Nos. DPR-77, DPR-79

Licensee: Tennessee Valley Authority 500A Chestnut Street Tower II Chattanooga, Tenn. 37401 Facility Name: Sequoyah 1, 2 Inspection at: Sequoyah site near Daisy, Tenn.

Inspection conducted: July 19-23,1982 Date of Last Physical Security Inspection Visit: April 19-23, 1982 Type of Inspection: Unannounced Physical Security T.nspectors:

\\b

@

A. Tillman, PhyMcal Security Inspector Date 'S'i gned

~

N-Approved by:

a D. R. McGuire, Chief, Physical Protection Section -

Dat Signed Technical Inspection Branch Division of Engineering and Technical Programs Inspection Summary Area Inspected:

Included review of security plan and implementing procedures; security organization-management; security organization personnel; records and reports; testing and maintenance; locks, keys, and combinations; physical barriers protected area; physical barriers-vital areas; security system power supply; assessment aids; access control personnel; access control packages; access control-vehicles; detection aids protected area; detection aids-vital areas; alarm stations; communications; and general requirements for personnel.

The inspection involved 38 inspector hours on site by one NRC inspector. The inspection was begun during an offshift period; six inspection hours were accomplished during offshift periods.

Results: The licensee was found to be in compliance with NRC requirements within the 18 areas examined during the inspection.

E'iCLOSL'EE CONTAINS SAFEOUARDS INFDIMATIOL UPON SEPARATIO3 THIS PAGE IS DECONIROLIID.

SAFEGuttRDS INFORMABON l

8208090127 820805 PDR ADOCK 05000327 G

PDR

.. _ _ _ _ _ _ - - - - - -.