IR 05000321/1978040
| ML19261B907 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 01/02/1979 |
| From: | Cunningham A, Hufham J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19261B893 | List: |
| References | |
| 50-321-78-40, 50-366-78-49, NUDOCS 7903070525 | |
| Download: ML19261B907 (4) | |
Text
/jka #f Goq'o,
.
UNITED STATES
,
NUCLEAR REGULATORY COMMISSION
,
,
-
39, g
REGION 11
"
g 101 M ARIETTA STREET. N.W.
ATLANTA, GEORGIA 30303 o%, v /
.....
Report Nos..
50-321/78-40 and 50-366/78-49 Docket Nos.: 50-321 and 50-366 License Nos.:
Georgia Power Company Facility Name: Edwin I. Hatch Nuclear Plant Units 1 and 2 Inspection at:
Environmental Center Decatur, Georgia 2030 Peachtree Street Atlanta, Georgia Edwin I. Hatch Units 1 and 2 Baxley, Georgia Inspection conducted: Dedember 4-8, 1978 Inspector:
A. L. Cunningt m I Reviewed by
.Ld s s nV i > l~\\ y
- '
J.
Hufham, 01ie Date
.
Env onmental apd Special Projects Section Fue Facility add flaterials Safety Branch Inspection Summary Inspection on December 4-8, 1978 (Report Nos. 50-321/78-40 and 50-366/78-49)
Areas Inspected: Routine, unannounced inspection of nonradiological environ-mental protection including administrative controls; review of previous enforcement matters; a review of procedures; a review of biological surveil-lance program; review of special studies program; review of licensee event reports.
Inspection involved 32 inspector-hours onsite by one NRC inspector.
Results: Of the six areas inspected, two apparent items of noncompliance were identified in two areas (deficiency:
quality assurance procedures (321/78-40-01, 366/78-49-01) Details I paragraph 4.a. ; inf raction:
semi-annual Surveys (321/78-40-02, 366/78-49-02) Details I, paragraph 6).
7903070 O
.