IR 05000313/1988023
| ML20205A143 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/19/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20205A147 | List: |
| References | |
| NUDOCS 8810250404 | |
| Download: ML20205A143 (1) | |
Text
,
.
.-
-
.
.
.
e
,
i 'In Reply Refer To:
i l
Dockets: 50-313/88-23 i
50.368/88-23
!
OCT l 9 gg Arkansas Power & Light Company
ATTN: Mr. Gene Campbell j
l l
Vice President, Nuclear Operations
,
I P.O. Box 551
l Little Rock, Arkansas 72203
!
[
Gentlemen:
'
Thank you for your letter of September 16, 1988, in response to our letter and Notice of Violation dated August 19, 1988. We have reviewed your I
l reply and find it responsive to the concerns raised in our Notice of Vioiction.
l l
-
We will review the implementation of your corrective actions during a future
[
inspection to detennine that full compliance has been achieved and will be l
maintained.
.
I
!
Sincerely,
!
I f
L. J. Callan. Director
Division of Reactor Projects j
{
l cc:
Arkansas Nuclear One
i l
ATTN:
J. M. Levine, Director
!
Site Nuclear Operations
'
P.O. Box 608 Russellville, Arkansas 72801 Arkansas Radiation Control Program Director bectoDM8(!E01)
bec distrib. by RIV:
l RRI R. D. Martin, RA
RP8-DRSS SectionChief(DRP/A)
!
Lisa Shea, RH/ALF Rly File i
i DRP MIS System l
'
RSTS Operator Project Engineer DRP/A
C. Harbuck, NRR P j ct Manager Dh
.
j RIV:PSA ft' C:PSA D: DRPH
\\\\
l ATHowell;d DDChamberlain LJCallan h
10/6/88 10//T/88 10/%/88 j
v h
!
4910250404 801019 l
gDR ADOCKCUoog3 l