IR 05000313/1988020
| ML20235R357 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 02/23/1989 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20235R359 | List: |
| References | |
| NUDOCS 8903030272 | |
| Download: ML20235R357 (2) | |
Text
-
.
.
.
.
'
FEB 23195 In Reply Refer To:
Dockets: 50-313/88-20 50-368/88-20 Arkansas Powar & Light Company ATTN: Mr. Gene Campbell Vice President, Nuclear Operations P.O. Box 551 Little Rock, Arkansas 72203 Gentlemen:
Thank you for your letter of January 4,1989, in response to our letter and Notice of Violation dated July 29, 1988. We have reviewed your reply and. find it responsive to the concerns raised in our Notice of Violation. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.
Sincerely,
Original S!Eco By:
t.j, CALLAN
L. J. Callan, Director Division of Reactor Projects
,
'
cc:
Arkansas Nuclear One ATTN:
J. M. Levine, Executive Director, fluclear Operations P.O. Box 608 Russellville, Arkansas 72801 Arkansas Radiation Control Program Director bec to DMB (IE01)
RIV:DRP/Ad C:DRP/A
&
D:DRPp fg l
ATHowell;df DDChamberldin LJCallan N{
2/A/89 2/0/89 2/p/89 I
s_ecoc,2_0272 e,902,22 c e<,<
,
a
,
,
I l
,
-
.
.
I
'
'
Arkansas Power & Light Company-2-bec distrib. by RIV:
RRI R. D. Martin, RA RPB-DRSS SectionChief(DRP/A)
Lisa Shea, RM/ALF RIV File DRP MIS System RSTS Operator Project Engineer, DRP/A DRS C. Harbuck, NRR Project Manager (MS:
13-D-18)
C. Poslusny, NRR Project Manager (MS:
13-D-18)
.