Issue date: 03/28/1978
From: Crossman W, Rosenberg A, Westerman T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19326B301 List:
References
50-313-78-08, 50-313-78-8, NUDOCS 8004150696
Download: ML19326B307 (8)


Text

-

m

-

.

,

.

O

+

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION IV

'

Report No. 50-313/78-08

'

. Docket No. 50-313 License No. DPR-51

,

Licensee: Arkansas Power and Light Company Post Office Box 551 Little Rock, Arkansas 72203 Facility Name:

Arkansas Nuclear One, Unit No. 1 Inspection at: ANO No. 1 Site, Russellville, Arkansas Inspection conducted: March 7-13, 1978 Inspectors:

A /-,/

2-27-7f

A. B. Rosenberg, React 6r Inspector Date Engineering Support Section Other Accompanying Personnel:

R. E. Hall, Chief, Engineering Support Section Reviewed:

j [e

%7 f~

.jV T. F. Westerman, Reactor Inspector, Reactor Dats Operations and Nuclear Support Branch o3/28ht l

Approved:

m a=~

W. A. Crossman, Acting Chief, Engineering Date Support Section

.

O

.

8004150gyg

_

--

._

. _.

-

.

_-

._. -

.

[

.

.

,

Inspection Summary:

Inspection on March 7-13, 1978 (Report No. 50-313/78-08)

Areas Inspected:

Routine, announced inspection involving:

(1) review of the Containment Integrated Leak Rate Test (CILRT) Procedure; (2) witnessing of the CILRT; and (3) review of a previously identified unresolved item.

This inspection involved 65 hours7.523148e-4 days <br />0.0181 hours <br />1.074735e-4 weeks <br />2.47325e-5 months <br /> by one inspector.

Results: Of the three areas inspected, no items of noncompliance were found in two areas; and two apparent items of non_ compliance were found

,

in one area (infraction - failure to follow procedure for CILRT; infrac-l tion - failure to adequately execute QC surveillance of CILRT).

!

~

1-2-

-_.

.

.. -

_.

.

..

_ _ _.

-. _ -. - -

,

,

.

m

.

DETAILS 1.

Persons Contacted Arkansas Power and Light Company (AP&L)

  • L. Alexander, Quality Control Engineer
  • C, H. Halbert, Technical Support Engineer
  • G. H. Miller, Assistant Plant Manager Bechtel Corporation G. V. Cranston, Engineering Specialist The inspector also interviewed other licensee and contractor personnel including members of the AP&L and Bechtel engineering and QC staffs.
  • Denotes those attending the exit interview.

2.

Follow Up on Previous Inspection Findings (0 pen) Unresolved Item (77-03):

The licensee was previously unable to provide documentation to show the acceptability of local leak rate testing of isolation valves from the reverse direction of accident O

pressure. During this inspection, the inspector reviewed memoranda between AP&L engineering and the site (NDC-6522, -6760, -6942, -6945, JWA-4304,-4674). The licensee identified twenty isolation valves of concern. Of the twenty valves identified, two required special valve lineups to test, thirteen required system modifications and have been assigned DCRs, and five are still being reviewed.

This item will remain open pending completion and NRC review of the modifications.

3.

Containment Integrated Leak Rate Test (CILRT) Procedure Review

'

The inspector reviewed procedure No. 1304.31, " Integrated Leak Rate Test Procedure," Revision 0. -The review included the following areas:

Management approval and review,

.

Test objectives and acceptance criteria, Personnel responsibilities, j

l Provisions for a test log, Test prerequisites,

-3-

.

l

-

~.

-

.

-

Oy)

Valve line-ups, venting and draining, Instrument calibration and operation requirements, Requirement for local leak surveys, Fan and cooler requirements, Test pressure requirements, Stabilization and test duration requirements, Data collection requirements, Verification test requirements, and Provisions to return equipment and systems to their pretest positions.

The inspector's initial review of the procedure, which the Plant Safety Comittee had reviewed and approved for use, identified

'everal areas of concern. These areas included: the wrong contain-ment volume, removing of pressurized gas sources from the contain-ment, and several instances of artificial leakage barriers created by the valve lineups. The licensee was revising the procedure during the inspector's review of Revision 0.

All identified areas of concern were incorporated in Revision 1 to Procedure 1304.31.

,

Valve lineups for forty-three of fifty-eight containment penetrations were reviewed against piping schematics by the inspector.

No artificial leakage barriers were identified in Revision 1.

All areas reviewed in Revision 1 were found to be in accordance with Appendix J to 10 CFR 50 and ANO Unit No.1 Technical Specifications.

No items of noncompliance were identified during this portion of the inspection.

4.

Witnessing of CILRT a.

Test Chronology 3-10-78 10:30 a.m.

Start Pressurizing Containment 7:00 p.m.

Hold Point at 14 psig Containment Entry and Local Leak Survey 11:00 p.m.

Resume Pressurization

.

G/

-4-

.

-

--

. -.

..


-.

.

,-

.

m

.

.

3-11-78 9:17 a.m.

Pressurization Stopped at Test Pressure (30.9 psig) Start of Stabilization c

Period

<

1:15 p.m.

Stabilization Complete 2:00 p.m.

Start Half Pressure CILRT 3-12-78 2:00 p.m.

Half Pressure CILRT Complete

.

2:45 p.m.

Start Verification Test

.

8:45 p.m.

Complete Verification Test.

,

b.

Preparation and Pressurization The inspector observed portions of the test preparations including alignment of valves, CILRT instrumentation functional check, and the general inspection of the containment interior. While inspecting the inside of the containment, the inspector observed

and identified to the licensee that pressurized fire extinguishers

in the containment had not been specifically listed in the pro-

cedure as compressed gas sources. The licensee subsequently

informed the inspector that the fire extinguishers would be

-

. removed from the containment and placed near the personnel lock.

j Pressarization of the containment was started at 10:30 a.m.,

March 10. The hourly water and oil check of the pressurizing air was observed twice. All sample cloths were examined during the prassurization period, with no oil or excessive moisture noticcd by the IE inspector.

.

The pressurization was stopped at 13.7 psig (14 psig nominal)

for an interior containment inspection and leak survey, as required by Procedure 1304.31,Section IV, Phase 3.

During

,

this hold point, Phase 3, the irapector observed at 9:00 p.m.

-

on March 10, 1978, that one sign off in Phase 1 and eight sign offs in Phase 2 had not been completed even though the test

'

was in Phase 3.

The absence of these sign offs was not in accordance with the procedure which in Section 3, paragraph B, required that each phase of the test be completed before a new phase is initiated.

Further review of the absent sign offs revealed that in Phase 1,

" Test Preparation," line B.12

" System line-ups completed is required per Appendix B" was not signed.

Review of Appendix B of the procedure revealed that the valve line-ups had not been completed. A line item on page B-9 requiring that "manways, handholes, etc. which could allow communication between the containment atmosphere and the secondary side of the steam

,

'

-

'

generators are shut and closures properly torqued," was not initialed or dated. Review of the chronological log indicated that a containment entry was made during pressurization to

,

tighten handholes and/or manways on the secondary side of one

!

i

-

-5-i I

l

'

!

!

,

_.

-

_ _. _ __-

..

_

. - _..

..

-

,

.

m

-

.

of the steam generators which was being pressurized due to the containment pressurization.

The review of Appendix B to the procedure also revealed individual valve lineups on 20 of 40 pages of the valve lineup, were initialed, but the dates were

'

not completed.

There was no indication that the steps had not been completed for the eight line items in Section VI, Phase 2, " Pressurization to 14 psig," which were not signed off prior to initiating Phase 3.

Subsequent to identification of the problem by the inspector, the licensee's test director completed the missing signatures and dates.

Permanent Change No. 2 (PC-2) for Procedure 1304.31 was issued on March 11, 1978, which revised line item B.12 in Phase 1 to read, " System line-ups completed as necessary to begin pressurizing reactor building."

The above failure to follow the approved procedure is considered an item of noncompliance.

Pressurization was continued to 30.9 psig withon further complications.

'

c.

Half Pressure CILRT Test pressure was reached at 9:17 a.m., March 11. The inspector verified the valve line-ups for six mechanical penetrations, (P-7, 31, 32, 40, 41 and 47) outside the containment and found them to be in accordance with Appendix B of the procedure.

The inspector also witnessed a portion of the exterior survey for leaks of containment penetrations which included five electrical penetrations.

No leaks were detected.

The containment stabilization period ended at 1:1S p.m.

Review of the containment temperature data indicated an hourly tempera-ture fluctuation of 0.12 degrees per hour which was within the acceptable deviation of 0.5 degrees Fahrenheit per hour.

The half pressure CILRT was started at 2:00 p.m. March 11. The inspector periodically observed data collection.

Data were automatically printed out for the temperatures, dew points and pressure at 15 minute intervals. The data were manually fed into the Bechtel computer through a remote terminal, then read back to verify that the computer had accepted 5e proper data.

,

Also observed were the evaluation of individual temperature and

.

dew point readings.

.

-6-s

_

.

.

.. _ - _

-

.

,

\\

d After the first eight hours of the test, the licensee elected to continue the test for a total of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> because the 95%

upper confidence interval was not sufficiently low.

At the

,

conclusion of the twenty-four hour test, the licensee's leakage calculation results and the NRC verification results t

were as follows:

95%

Acceptance Confidence Criteria Leakage Rate *

Interval ( 75% Lt)

t.005 0.054%

Licensee 0.009%

NRC 0.0088%

0.0048 0.054%

.

  • Calculations by Mass Plot method.

The plant heating system (penetrations P-42 & -48) was not lined up, vented or drained for the test; however, it was the licensee's intention to modify the system as a result of the unresolved item discussed in paragraph 2 above.

These penetra-tions will be locally leak rate tested after modification.

The results of these local tests will be added to the CILRT results to determine the actual containme' t leakage as permitted by the licensee's technical specifications.

O (#/

Calibration data for the instruments (sensors, trans.nitters, and recorders) used were found to be current and in accordance with Procedure No. 1304.31.

No items of noncompliance were identified during this portion of the inspection.

d.

CILRT Controlled Leakage Test To verify the acceptability and accuracy of the instrumentation and calculations, the licensee imposed a controlled leakage of 2.54 SCFM. The measured and calculated leak rates for the verification test were within the 25% Lt criteria of 10 CFR 50, Appendix J.

The inspector's calculations correlated closely with the licensee's.

No items of noncompliance were identified during this portion of the inspection.

e.

Quality Control Activities During CILRT

,

The NRC inspector observed Quality Control (QC) surveillance of the CILRT and found that QC had not adequately executed the surveillance activities.

Through interviews with the QC Engineer, O

the inspector determined that QC personnel had neither reviewed t

nor read procedure No. 1304.31 prior to the start of the test.

It was also found that a specific surveillance plan was not-7-

,

.

-

,

,

.

~

fi

.

b prepared for the test activity. QC personnel were not observed conducting surveillance during several key test evolutions, specifically: valve lineups; test pressure exterior leakage survey; and start of the verification test.

,

Although ten and a half hours had elapsed from the end of Phase 1, two hours had elapsed from the end of Phase 2, and Phase 3 was in progress, QC failed to identify the items in

,

paragraph 4.b. above.

'

It is the inspector's conclusion that surveillance of key test evolutions was not performed because review of the procedure and planning of the QC surveillance activities were not per-formed. The inspector pointed out that planning is an impor-tant foundation of any inspection or surveillance activity.

K. E. Bromenschenkel of Carolina Power and Light Company in the paper "How to Manage Operations to Assure Quality--Refueling,"ll states that, "QA personnel work directly with the various work groups... by reviewing work procedures or instructions prior i

to the work beginning...."

Failure of AN0 Unit No. 2 QC to adequately execute surveillance of the CILRT, as required by AP&L Topical Report APL-TOP-1A, is in noncompliance with the requirements of Criterion X of

'

Appendix B to 10 CFR 50.

/

~

'

'

5.

Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, items of noncompliance, or deviations.

No new unresolved items resulted from this inspection.

6.

Exit Interview An exit interview was conducted on March 13, 1978, following com-pletion of the inspection.

During this interview the inspector discussed the scope of the inspection and the resultant findings, including the apparent items of noncompliance reported in paragraphs 4.b. and 4.e. above.

.