Informs of SSFI Rept 50-302/97-14 at Plant Scheduled for Weeks of 970908-15,1006-10 & 1020-24.Designated Team Leader Will Be Contacting Staff & Arranging for Specific Matl to Be Provided During pre-insp Visit,Wk Scheduled for 970908-15
ML20210N839
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/21/1997
From: Christensen H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Richard Anderson
FLORIDA POWER CORP.
References
50-302-97-14, NUDOCS 9708260140
Download: ML20210N839 (4)


Text

. .

,

.

AUGUST 21, 1997 Florida Power Corporation j Crystal River Energy Complex Mr. Roy (SA2A)

Sr. VP, Nuclear Operations ATTN: Mgr., Nuclear Licensing 15760 West Power Line Street Crystal River, FL 34428 6708 l

SUBJECT: CRYSTAL RIVER TEAM SAFETY SYSTEM FUNCTIONAL INSPECTION 4 (NRC INSPECTION REPORT NO. 50 302/9714)

'

Dear Mr. Anderson:

-

The purpose of this letter is to announce the subject inspection at your Crystal River facility.

We have scheduled this inspection for the weeks of September 8 - 15. October 6 - 10, and October 20 24,1997. The designated inspection team leader, William E. Holland, will make

- arrangements with your staff to telephonically discuss the inspection plans in more detail.

The inspection objective will be to assess the operational performance capability of selected safety systems through an in-depth, multi disciplinary engineering review to verify that the

'

selected systems are capable of performing their intended safety functions. The inspection will be conducted using Inspection Procedure 93801, " SAFETY SYSTEM FUNCTIONAL IN9PECTION (SSFI)," and willinvolve a team of at least five inspectors.

The t0am will require Information about the selected systems (Makeup and Purification System and Decay Heat Removal System), and other plant programs for their in-office preparation for the inspection. A description of some of the material needed is outlined in the enclosure. Our designate 1 team leader will be contacting your staff and arranging for specific material to be provided dering the pre-Inspection visit week which is scheduled for September t'- 15,1997.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact me at (404) 562-4605.

Sincerely, l

ORIGINAL SIGNED BY

'IQ4 PmntPS '

9708250140 970821 PDR A90CK 0500030*' = Harold O. Christensen, Chief G PDR Engineering Branch Division of Reactor Safety Docket No.: 50-302 License b o.: DPR 72-Enclosu e: (See page 2)

Q$fkh

,

ZEol

.

.

FPC- 2 Enclosure: As stated cc w/ enc!:

John P. Cowan, Vice President Nuclear Production (NA2E)

Florida Power Corporation Crystal River Energy Complex-15760 West Power Line Street Crystal River, FL 34428-6708 B. J. Hickle, Director Nuclear Plant Operations (NA2C)

Florida POWor Co'poration Crystal River Energy Complex 15760 West Power Line Street Crystal River, FL 34428 6708 ,

Robert E. Grazio, Director Nuclear Regulatory Affairs (SA2A)

Florida Power Corporation Crystal River Energy Complex 15760 West Power Line Street Crystal River, FL 34428-6708 James S. Baumstark, Director Quality Programs (SA2C)

Florida Power Corporation t Crystal River Energy Complex 15760 West Power Line Street Crystal River, FL 34428-6708 R. Alexander Glenn Corporate Counsel-

' Florida Power Corporation MAC - ASA P. O. Box 14042 St. Petersburg, FL 33733-4042 Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 (cc cont'd See page 3)

,

i

\

_ _ _ _ _ _ _ _ _ _ _ _ - -

. .

,

FPC 3 (cc cont'd)

Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399 2100 Chairman i Board of County Commissioners l- Citrus County 110 N. Apopka Avenue Inverness, FL 34450-4245 l Robert B. Borsum Framatome Technologies 1700 Rockville Pike, Suite 525 Rockville, MD 20852 1631 l Distribution wlanc[:

f K. L1ndis, Ril L. Raghavan, NRR R. Schin, Ril-P. Steiner, Ril PUBLIC NRC Resident inspector U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River, FL 34428 orrICE R11 DR8 (j AII DR( / RIIngkP SIGNATQKE p d "- ) fjp(,[ g fy NAmt SNollandep4 HCErista mson K!!anBis DATE 8/ bJ /97 )97 /97 8/

8/ 7 8/ gg /97 8/ /97 8/ /97 8/ /97

.corYr (Yst,i Ani Ys8 YS YES YES YES orrzexxt. msconD b g Docuumwr wax : S:\DRSlEBlCRYSTALR.MLM

4-

. .

. *

.

The following items are requested to support NRC preparation for a Safety System Functional inspection at the Crystal River Nuclear Plant:

1. Updated Final Safety Analysis Report (UFSAR)Information relating to safety systems being reviewei

- 2. Site specific administrative procedures.

,

3. System descriptions and design basis documents (if available).

4. _ Site specific training documents for the systems.

5. Technical Specification requirements and surveillance test procedures.

l 6. - System piping and instrumentation drawings (P&lDs), one line diagrams and logio diagrams.

7. Engineering calculations (e.g., equipment sizing and short circuit analysis).

8. Temporary and permanent modifications, including safety evaluations.

'

9. Maintenance history records for selected systems or components for the last two years (listing should include corrective and preventative maintenance).

10. Relevant regulatory information such as Information Notices, Generic Letters, and special studies that apply to the systems.

11. ANSI standards applicable to the assigned functional areas.

12. Licensee event reports (LERs) for the past 12 months.

- 13. - Licensee engineering design guides.

14. C .i tions adverse to quahty (nonconformance) reports.

, . . . . . - .

x :e Enclosure