IR 05000302/1973003

From kanterella
Jump to navigation Jump to search
Insp Rept 50-302/73-03 on 730417-19.No Noncompliance Noted. Major Areas Inspected:Decay Heat & Makeup & Purification Sys Welding & Radiography,Missing Radiographs & QC Programs
ML19319C889
Person / Time
Site: Crystal River 
Issue date: 05/07/1973
From: Crossman W, Vallish E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19319C878 List:
References
50-302-73-03, 50-302-73-3, NUDOCS 8003040845
Download: ML19319C889 (9)


Text

.-

--

- - _ _ _ -. -.

. - _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ - __ _ _ _ - _ _ _ _ _ _ - - _ _ - _ _ _ _ _ - _ _ - - _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

~

.-

-

!" M O

-}

}

'

,

e#"

"

p /S

%,,*o UNITED STATES

y

\\

)

.

ATOMIC ENERGY COMMISSION 1 7c e

DIRECTORATE OF REGULATORY OPERATIONS

-

c ~,

'

mEGion si - su T E sis

/

230 PE ACMT R E E sT R EET. NORT HwEST 7, L,,,,,,, ;,,,,,,,,,,,,,

Ifdrgg O'

AT I. A NT A, G E ORGI A 30303 RO Inspection Report No. 50-302/73-3

..

Licensee Florida Power Corporation 320134th Street, South P. O. Box 14042 St. Petersburg, Florida 33733 Facility Name: Crystal River 3 Docket No. :

50-302 License No. :

CPPR-51 Category:

A2 Location: Crystal River, Florida Type of License B&W, PWR, 855 Mwe Type of Inspection:

Routine, Unannounced Dates of Inspection: April 17-19, 1973 O.

Dates of Previous Inspection: March 13-16, 1973 Performing Inspector:

A. R. Herdt, Metallurgical Engineer i

Engineering Section

,

Facilities Construction Branch Accompanying Inspectors: None Other Acconpanying Personnel: None Principal Inspector:

b

[-*7-73 E. E Vallish, Reactor Inspector Date Facilities Section Facilities Construction Branch Reviewed By:

/

E/7/73

%

W. A. Crossma*

Senior Inspector Date Facilities Section Facilities Construction Branch

'

W d

800s04o [ [

,

_

_

.-

- _

-.. - - _

,..,

-... _ -.. -, -

,

.

_

_

.. - _ -.

e.

,

--

.

'

p i

h v

-

.

R0 Rpt. No. 50-302/73-3-2-

.

SIMMARY OF FINDINGS I.

Enforcement Action A.

Violations None B.

Safety Items None II.

Licensee Action on Previously Identified Enforcement Matters A.

Violations

,

73-1/Al Decay Heat and Makeup and Purification Systems Welding i

Welding performed on the makeup and purification systems was not in accordance with the qualified welding procedure.

The licensee has conducted a review and additional NDr.

His evaluation is not yet complete; therefore, this item s

remains open.

(Details I, paragraph 2)

73-1/A2 Decay Heat and Makeup and Purification Systems Radiography

!

Radiography of welds on the decay heat removal system was not in accordance with the prescribed procedure. The licensee's program is not yet complete and this item remains open.

(Details I, paragraph 3)

B.

Safety Items None III. New Unresolved Items

!

l 73-3/1 Radiography of Piping The licensee is to investigate the acceptability of M. W. Kellogg Company's (MNK) Radiographic Procedure

.

ES-403 and Babcock and Wilcox Construction Company's (B&W) Radiographic Procedure 9T-102A and the radiographs with regard to the primary use of film side penetrameters in accordance with Code Case 72 and ASME Boiler and Pressure

\\

Vessel (B&PV) Code,Section III.

(Details I, paragraph 4)

%Y.

t

.

--

-

..

.

-.

_ - _ _ _ _ _ _ _ _

_ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _

.*

,.

~

.

.

.

t

)

RO Rpt..No. 50-302/73-3-3-

)

-

,

,

.

IV.

Status of Previously Reported' Unresolved Items 72-5/1 ~ Radiographs / Code Case 72

" Code Case 72 has been investigated and is an approved ANSI B31 code case. This item is resolved.

(Details I, paragraph 7)

71-5/5 Cleanliness Procedures in Piping and Components There has been no change in status. This item remains open.

72-3/5 Procedures for Final Inspection of Piping Thare has been no change in status. This item remains cpen.

72-5/3 Valve Wall Thickness Requiremeng There has been no change in status. This item remains.

open.

,

73-1/1 Missing Radiographs Radiographs for the final acceptance of weld 42-DH were located and reviewed. This item is resolved.

(Details I, paragraph 5)

73-1/2 Suspect Lack of Material Control - Weld Filler Material Investigation of this item continues. This item remalt.s open.

(Details I, paragraph 6')

V.

Design Changes None i

VI.

Unusual Occurrences None VII.

Other Significant Findings i

A.

Project Status O

As of March 27, 1973, the project is approximately 70% complete.

_

_

_

_ _ _

_,.

-.. -..

....

O

~

\\

.

.

,

.

\\

-

16 Rpt. No. 50-302/73-3-4-B.

Personnel or Organizational Changes New employees in the quality surveillance group are:

R. A. Jorgensen, Electries' dngineer L. R. Wade, Mechanical Engineer VIII. Management ' Interview The results of this inspection were discussed with H. L. Bennett, Director, Generation Construction, C. E. Jackson, Construction Superintendent, D. L. Pedrick, Quality Engineer, and other members of the plant staff.

A.

The items under Section II above were discussed in detail. The licensee concurred that the required actions were not complete and that the items remain open.

B.

The inspector stated that during his review of MWK and B&W pipe weld radiographs and radiographic procedures, he found an area of concern involving conformance with the intent of Code Case 72 and the ASME Code,Section III.

The licensee agreed to examine the radi.ographic requirements concerning large diameter pipe and the routine use of film side penetrameters.

(Details I, paragraph 4)

.

\\

,

e (

-

-

.

...

-

--

-

e r

~

.

(

RO, Rpt. No. 50-302/73-3 I-1 DETAILS. I Prepared Ey:

'1 y 73

'

A. R. Herdt, Metallurgical

' date Engineer, Engineering Sectiot.

Facilities Construction Branch Dates of' Inspection: April 17-19,1973 Reviewed By:

&

( 9')O C B'r%t, Senior Inspector Date gineering Section Facilities Construction Branch 1.

Persons Contacted a.

Florida Power Corporation (FPC)

H. L. Bennett - Director, Generation Construction C. E. Jackson - Construction Superintendent D. W. Pedrick - Quality Engineer L. R. Wade - Mechanical Engineer b.

Contractor Organizations (1)

J. A. Jones Constru.: tion Company (JAJ)

J. R. Amundson -Site Quality Control Supervisor (2)

Pittsburgh Testing Laboratory (PTL)

G. B. Brown - Chief Inspector (3)

Gilbert Associates, Inc. (GAI)

A. Sobol - Project CA Engineer S. R. Buckingham - Site QA Coordinator (4)

Babcock and Wilcox Construction Company (B&W)

L. M. Watson - Site Manager J. R. McGill - QC Supervisor

,:

~

,

J

,

...

.

10 Rpt. No. 50-302/73-3

,I-2-

,

,

2. ' Decay Heat and Makeup and Purificatiohl System Welding-

'

The ' inspector reviewed the actions taken on this previous violation (73-1/A1). The licensee has reviewed.730 completed field weld data

'

. The results of this review showed that 19 welds were cogleted-sheets.

using 1/8-inch diameter weld filler metal for part of the weld which was not called out for by weld procedure SS-1-TIG.

In addition, 332 welds were welded to the same procedure, SS-1-TIG, without the use of

'1/16-inch diameter weld filler metal as required by the procedure.

,

!

The 19 weldments made with 1/8-inch diameter filler metal are being 100% radiographically inspected'to provide evidence that the welds are acceptable. Thirty-two welds which were welded without the prescribed 1/16-inch diameter filler metal have been -

radiographed. The radi_ographic inspection, together with the required evaluation, is not yet coglete. All other actions (it2ms 2 through C)

stated in the licensee's letter to Region II, dated March 23, 1973, I

are co g leted. The licensee agreed that the required actions on this violation are not complete and the item remains open.

i 3.

Decay Heat and Makeup and Purification Sytems Radiography The inspector reviewed the action taken on this previous violation (73-1/A2). The licensee has recalled all film for review of pene-trameter location and has instructed the radiographers to place the penetrameters in accordance with the prescribed procedure. The licensee is presently cogiling a list of all film that does not

,

!

meet the penetrameter location requirement. This item remains

open until the list is cog iled and the evaluation complete.

,

4.

Radiography of Piping The inspector reviewed the radiographs on makeup welds 260, 241, 261 and feedwater weld 251. These are prefabricated spool pieces and welds, fabricated and radiographed by MWK. - The radiographic technique used on the above welds was a contact shot (burning out one wall) with a film side penetrameter. MWK radiographic procedure, i

'

ES-403, was also reviewed. - Paragraph 4.1.1 of the procedure states

'

that the penetrameter shall be placed on the side nearest the radiation source but that where it is physically impossible to do this, a film side penetrameter shall be placed on the film. side of the joint. Moreover, the procedure states that all penetrameters -

,

shall be in accordance with B31.7, code Case 72, Table 1.

l l

d

-

.

-.

-

-

-- -

- -. -

.

-

..

_..

.

.

..

.

.

- _ _ - - _ - - - - _ _ - - -

aL

.

_

. -7

. -

' t

-

BO-Rpt. " No. - 50-302/73-3'

I-3-

.

s-

,

1-The licensee? agreed to evaluate the radiographs with regard to the primary ' usage of film side penetrameters'since the procedure

!

. states that-the film side penetrameter will be used only when physically impossible to use a source side penetrameter..The

'

licensee concurred with the inspector that the procedure needs to be reviewed in-accordance with the intent of Code Case-72 on large

,

j

. diameter pipe.

Furthermore~, B&W Radiographic Procedure 9T-102A and the' appropriate

,

Nondestructive Examination Instruction (9T-lE-200) are in accordance with ASME, B&PV Code,Section III (1971). This procedure used Table IX-3325.2 for penetrameter requirements for all weldments, regardless of

!

source side and film side-placement. This table is identical to the

Code Case 72, Table 1, which allows 4T sensitivity up to one-inch single wall thickness range. - The licensee will examine this procedure to ensure' all necessary requirements are met.

I In conclusion, the licensee agreed to investigate the acceptability j

of MWK Radiographic Procedure ES-403, B&W Radiographic Procedure 9T-102A, and the radiographs in accordance with Code Case 72's intent and wording and ASME B&PV Code,Section III. This item-is

,

considered unresolved.

.

5.

Missing Radiographs J

During the last inspection, radiographs for weld 42-DH could not be located even though this weld had been completed and accepted.

The radiographs were located and reviewed by the inspector with

!

no discrepancies found. The inspector considers this ~ item resolved.

.

6.

Suspect Lack of Material Control - Weld Filler Material The licensee has received the technical report from B&W that Crystal River 3 steam, generator contains some weld filler material whidt did not indicate sufficient tensile or impact properties.

This report is presenty being evalua_ad.

l l

7.

Radiographs / Code Case 72 i

Acceptability of _ this code. case for the deviation in sensitivity -

,

and penetrameter requirements has been investigated. This code j

case is an approved ANSI-B31 code case and is allowed to be used

for radiography of piping.

.!

.

c

-

--.,--,_,_.4

-.

- - -

-

,

-,,w.--,..

,,

.--.-,,,-ww-,-.y,-.,#-

.,

-,.,-,.#,c_-

. =

e94'ew,


we=-

.r,,

w

.

. _ _ _ _

-

%

.m(

>

RO.Rpt. No. 50-302/73-3 I-4

>

,

8.

Quality Control Procedures The inspector reviewed the B&W Quality Control Manual, NSS-7, which is used exclusively at Crystal River 3 by B&W.

This manual is applicable for, but not limited to, primary, makeup, decay heat, core flood, pressurizer spray piping systems and associated valves.

The quality control procedures reviewed were:

9A-120,

" Qualifications of Weldors and Welding Operators-General Requirements" 9A-149,

" Procedure for Maintenance of Performance Qualification" 9WP-100N, " General Procedure for Manual Metal Arc Welding" 9WP-200N, " General Procedure for Manual Gas Tungsten Arc Welding" 9T-102A,

" General Procedure for Radiographic Examination" 9T-102H,

" General Procedure for Liquid Penetrant Lxamination" 9T-lO2F,

" General Procedure for Magnetic Particle Examination" 9A-140,

" Weld "ontrol Record" B&W field construction procedure No. B&W 037 for the erection of stainless steel pipe and associated valves, procedures for the qualification on NDP personnel and procedures for heat treating were also reviewed.

These procedures are being revised as a need is determined. The inspector stated that he had no further questions at this time except in the radiographic procedure as mentioned in paragraph 4 above.

s

%

-.

-

-

a

..

.s

=s

.

.

,.

.

.

Ltr to Florida Power Corporation 4td MAY 141973 ce v/ encl:

Q. D. Thornburg, R0

-

RO:HQ (h)

Directorate of Licensing (4)

DR Central Files cc w/o encl:

PDR Local PDR NSIC DTIE, OR State O