Text
-
O 8# %
UNITED STATES I
[3,o k
ATOMIC ENERGY COMMISSION
\\
H 7(" eQ
- l DIRECTORATE OF REGULATORY OPERATIONS V
c ' N.
%,%ni0[,J accios is - susTe eis
'5/~
'
230 pc Acar Ree STREET, NORT HWEST
'
%
7cL,,w,,,,,,,,
,,,,4,,,
AT L. A NT A GEORGI A 30303 N
- In Reply Refer To:
RO:II:EJV 50-302/73-13
.
.
,
Florida Power Corporation Atta:
Mr. J. T. Rodgers
,
Assistant Vice President Generation Engineering 3201 34th Street, South P. O. Box 14042 St. Petersburg, Florida 33733 Gentlemen:
.
This refers to the inspection conducted by Messrs. E. J. Vallish and F. U. Bower of this office on December 10-14, 1973, of activities authorized by AEC Construction Permit No. CPPR-51 for the Crystal River Unit 3 facility, and to the discussion of our findings held by Messrs. Vallish and Bower with Messrs Jackson, Kleinman, and others b
of your staff at the conclusion of the inspection.
Areas examined during the inspect 4n and our findings are discucsed in the enclosed inspection report. Within these areas, the inspection consisted of selective examination of procedures and representative re. cords, interviews with personnel, and observations by 'the inspector.
Within the scope of this inspection, no violations were disclosed.
We have examined actions you have taken with regard to previously reported unresolved items. These are identified in Section IV of the summary of the enclosed report.
Two new unresolved items resulted from this inspection and are identified in Section III of the summary of the enclosed report. These items will be examined during subsequent inspections.
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the AEC's Public Document Room.
If this report contains any information that you believe to be proprietary, it is necessary that you submit a written application to a
8 003 040 f,3/
a
-
- _ -
_ _ _ _ _ _
_
_ _ _. - _ _
<
--.
.
Florida Power Corporation-2-J,AN 4 7J/4
.
,
this office requesting that such information be withheld from public
.
disclosure. If no proprietary information is identified, a written
-
statement to that effect should be submitted.
If an application is submitted, it must fully identify the bases for which information is
,
claimed to be proprietary. The application should be prepared so that
-
information sought to be withheld is incorporated in a separate paper
~l and referenced in the application since the application will he placed
,1 in the Public Document Room. Your application, or wrf.tten statement, should be submitted to us within 20 days. If we are not contacted as specifiad, the enclosed report and this letter may then be placed in the
~
Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Very truly yours,
.
p r:nGm c'-
l Norman C. Moseley Director Enclosure: