Text
_ _ _ - - _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .__
,
..
N
'
[] ## "' %,-
UNITED STATES
(j!
"g
ATOMIC ENERGY COMMISSION
o
DIRECTORATS OF REGULATORY OPSPATIONS
I
e<
-
'
-
REG (ONli - Suet E 814
"I) t
O
p
230 P E ACHT R E E ST R E ET. NORT HwEST
f
,
,g
If rgs O*
AT t. A NT A, GEoRG 8 A 30303
d
In Reply Refer To:
MAY 141973
RO:II:EJV
50-302/73-3
Florida Power Corporation
Attu: Mr. J. T. Rodgers
Assistant Vice President -
Generation Engineering
3201 34th Street South
P. O. Box 14042
St. Petersburg, Florida
33733
Gentlemen:
This refers to the construction inspection conducted by Mr. Herdt
of this office on April 17-19, 1973, of activities authorized by
AEC Construction Permit No. CPPR-51 for the Crystal River 3 facility,
w
and to the discussion of our findings held by Mr. Herdt with
Mr. H. L. Bennett and other members of your staff at the conclu-
sion of the inspection.
Areas examined during the inspection and our findings are dis-
cussed in the enclosed inspection report. Within these areas,
the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and obser-
vations by the inspector.
Within the scope of the inspection, no violations were identified.
One new unresolved item resulted from this inspection.
This item
is identified in Section III of the summary of the enclosed report.
-
This item will be examined on a subsequent inspection.
We have also examined actions you have taken with regard to pre-
viously identified violations and unresolved items.
The status
of these items is identified in Sections II and IV of the summary
of the enclosed report.
\\)
'
- 003
l
040 } 39,
.- .
. . _
.
. . .
-
_ _ _ - _ _ _ - _ _ _
___
_ _ _ _ _ _ _
=
-
<s
s
.-
,
. ..
.
Florida Power Corporation
-2-
MAY 141973
In accordance with Section 2.790 of the AEC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the AEC's Public
Document Room.
If this report contains any information that you
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such informa--
tion from public disclosure. Any such application must include a full
statement of the. reasons on the basis of which it is claimed that the
information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate
part of the document.
If the report contains no information which you
believe to be proprietary, please inform us in writing within 20 days
to this effect.
In such case, the report, as enclosed with this letter,
will be placed in the Public Document Room.
4
Should you have any questions concerning this letter, you may communicate
directly with this office.
Very truly yours,
4 ~ Norman C. Moseley 6ke*AP
~
'
Director
'
Enclosure:
Inspection Report No.
50-302/73-3
-
.
-.