Design Basis Assurance Inspection (Programs) Inspection Report 05000266/2019013 and 05000301/2019013 (DRS-B. Jose)
ML19199A576
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/18/2019
From: Stoedler K
NRC/RGN-III/DRS/EB2
To: Craven R
Point Beach
References
EPID: I-2019-013-0011 IR 2019013
Download: ML19199A576 (10)


Text

July 18, 2019

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - DESIGN BASIS ASSURANCE INSPECTION (PROGRAMS) INSPECTION REPORT 05000266/2019013 AND 05000301/2019013

Dear Mr. Craven:

On July 11, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Point Beach Nuclear Plant, Units 1 and 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Karla K. Stoedter, Chief Engineering Branch 2 Division of Reactor Safety

Docket Nos.: 05000266 and 05000301 License Nos.: DPR-24 and DPR-27

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000266 and 05000301

License Numbers:

DPR-24 and DPR-27

Report Numbers:

05000266/2019013 and 05000301/2019013

Enterprise Identifier: I-2019-013-0011

Licensee:

NextEra Energy Point Beach, LLC

Facility:

Point Beach Nuclear Plant, Units 1 and 2

Location:

Two Rivers, WI

Inspection Dates:

June 24, 2019 to July 11, 2019

Inspectors:

J. Braisted, Reactor Inspector

I. Hafeez, Reactor Inspector

B. Jose, Senior Reactor Inspector

Approved By:

Karla K. Stoedter, Chief

Engineering Branch 2

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a design basis assurance inspection (programs) inspection at Point Beach Nuclear Plant, Units 1 and 2 in accordance with the Reactor Oversight Process.

The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.21N - Design Bases Assurance Inspection (Programs)

The inspectors evaluated Environmental Qualifications program implementation through the sampling of the following components:

Select Sample Components to Review - Primary Containment (Inside Containment) (IP Section 02.01)===

1-LT-00427, T-1 Pressurizer Narrow Range Level Transmitter

Select Sample Components to Review - Risk Significant/Low Design (Inside/Outside

Containment) (IP Section 02.01) (7 Samples)

(1)1-CS-00480-S, HX-1A Steam Generator Regulator Control Bypass Solenoid (2)2-CC-00738B, HX-11B Residual Heat Removal (RHR) Heat Exchanger (HX) Shell Side Inlet Motor-Operated Valve (3)2P-11B, Unit 2 Component Cooling Water Pump B (4)2-PT00968, Unit 2 C Wide Range Pressure Transmitter (5)2-MS-02020, Heat Exchanger 1A Steam Generator Header P-29 Auxiliary Feed Pump Steam Supply Motor Operated Valve (6)2-I/P-00625, HX-11B RHR HX Outlet Control I/P Transducer (7)2-RC-00430-S, T-1 Pressurizer Power Operated Relief Solenoid

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On July 11, 2019, the inspectors presented the design basis assurance inspection (programs) inspection results to Robert Craven and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.21N Calculations

2000-0063

Re-Evaluation of Thermal Qualified Life for Affected

Environmental Qualification (EQ) Components Based on

Revised Temperature Monitoring Data in Primary Auxiliary

Building and Turbine Building

2010-0023

Point Beach Emergency Operating Procedure Containment

Setpoints

97-0059

Calculation of Arrhenius Equivalent Temperature for EQ

Transmitters in Containment

Corrective Action

Documents

25720

EQ Self-Assessment Recommendations

11/21/2002

1953134

2CC-738B Stopped Mid Stroke When Opening

03/30/2014

2196999

Motor Base not Flat and Lead Box Small

04/07/2017

239168

No Vibration Pads or Point Label on 2P-11B Motor

2/06/2017

279998

Warehouse Temperature Monitors Calibration Overdue

09/12/2018

280002

WH 4, 5, 6 Walkdown Observations

09/12/2018

283570

Emergency Operating Procedure Setpoint Calculation 2010-

23

10/03/2018

2316910

Automatic Switch Company (ASCO) Solenoid Valve EQ Life

Activation Energy

06/05/2019

20720

Evaluate Harris NRC IR 2019-010 for Vulnerability at NEE

Fleet Sites

07/11/2019

99-3092

Logged Local Temperature Higher Than EQ Specification

2/06/1999

AR/PMCR

2014853-08

Change Valve Operator Overhaul PM "On Demand" (OD)

Based on the Excellent Performance of the Gear Box

Lubricant

03/03/2015

Corrective Action

Documents

Resulting from

Inspection

2319407

Remove Existing Ladder Storage Brackets and Replace with

New

06/27/2019

20373

Incorrect EQCK Referenced for MOV Motors

07/09/2019

20446

Documentation Error Related to Motor Operated Valve

Preventive Maintenance Frequencies

07/09/2019

Drawings

6118-E-27

Raceway Systems Notes & Details

EG-G11

Environmental Qualification Service Conditions

Engineering

EC 281173

Pressurizer Level Transmitter Replacement

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Changes

Miscellaneous

351R2

Investigation into Eliminating the use of lubricants on the NP

series of valves

05/25/2004

4500407119

Qualification Report: FQR-73

A

AQR-67368/R

Report on Qualification of ASCO Catalog NP-1 Solenoid

Valves for Safety-Related Applications in Nuclear Power

Generating Stations

AQS-21678/TR

Qualification Tests of Solenoid Valves by Environmental

Exposure to Elevated Temperature, Radiation, Wear Aging,

Seismic Simulation, Vibration Endurance, Accident Radiation

and Loss-Of-Coolant Accident (LOCA) Simulation

A

B0003

Limitorque Test Report No. B0003 Qualification Type Test

Report Limitorque Valve Actuators for Class 1E Outside

Primary Containment

07/29/1986

D2013003

IEEE Qualification Report of Rosemount 3154N Pressure

Transmitters

A

DBD-T-39

Environmental Qualification Design Basis Document

EQCK-ASCO-002 Checklist for Environmental Qualification Assessment of

ASCO Model: 206 Series, NP8314, NP8316, & NPEFL8300

Solenoid Valves

EQCK-FISH-001

Thermal Qualified Life Calculation & Accident/Post-Accident

Evaluation

EQCK-FOXB-001

Environmental Qualification Assessment of Foxboro

Pressure Transmitters

EQCK-LIMIT-001

Checklist for Environmental Qualification Assessment of

Limitorque SMB Valve Actuators with H/RH Motor Insulation

EQCK-LIMIT-002

Checklist for Environmental Qualification Assessment of

Limitorque SMB Valve Actuator Class B Motor Insulation

Outside Containment Without Brakes

EQCK-LIMIT-004

Checklist for Environmental Qualification Assessment of

Limitorque SMB Valve Actuator Components

EQCK-ROSEMT-

003

Checklist for Environmental Qualification Assessment of

Rosemount 3154N Pressure Transmitters

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EQCK-WEST-008 Environmental Qualification Report for Component Cooling

Water Pump Motors

EQML

Environmental Qualification Master List for Point Beach

Nuclear Power Plant Units 1 & 2

EQMR-ASCO

Equipment Qualification Maintenance Requirements for

ASCO NP Series Solenoid Valves

EQMR-CCW

Equipment Qualification Maintenance Requirement for

Component Cooling Water Motors

EQMR-FOXBOR

EQ Maintenance Requirements for Foxboro Transmitters

EQMR-LIMIT

Equipment Qualification Maintenance Requirements for

Limitorque Valve Motor Operators including Control Cable,

Power Cable, Motor-to-Lead Splices, Main Gear Case

Lubricant and Geared Limit Switch Lubricant

EQMR-

ROSE3154

Equipment Qualification Maintenance Requirements for

Rosemount Transmitters 3154N Series with or Without 3159

Remote Diaphragm Seal

MM-9112

Environmental Qualification Test Report for Component

Cooling Water Pump Motors

05/15/1986

NEM-89-175

Unit 2 Containment Ventilation System

03/10/1989

NPC-44228

Clarification of Information Related to the Environmental

Qualification of Limitorque Motorized Valve Operators

09/07/1989

PBN EM 310

OJ002

Field Test Motor Operated Valve Actuators

RMP 9004

Power Operated Relief Valve

Maintenance

RMP 9376-6

Limitorque Motor Operator Model SMB-00 Disassembly,

Inspection, Repair, and Re-Assembly

SMS-02020

HX-1A SG Header P-29 AFP Steam Supply MOV Starter

TM-46

VOTES Infinity Data Acquisition and Basic Analysis

VTM 00003-2

Installation and Maintenance Instructions, 3-Way Direct

Acting Nuclear Power Plant Pilot Valves Normally Closed,

Normally Open and Universal Operation

VTM 00432

Vendor Manual for Foxboro Transmitters

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

VTM 02119

Rosemount 3150 Series Nuclear Pressure Transmitters

Including the Rosemount 3152, 3153, and 3154

Procedures

2ICP05.69B

Train B RHR Heat Exchanger Valve and Controller

Calibration

DG-G12

Environmental Qualification Program Manual

MA-AA-100-1014

Limitorque Motor Operated Valve Testing and Actuator

Inspections

MA-AA-100-1021

Motor Operated Valve Stem Lube and Actuator Gearbox

Grease Inspection

PBN EM 310

OJ002

OJT/TPE Guide Title: Field Test MOV Actuators

Self-Assessments 2283192

Environmental Qualification Assessment in Preparation of

NRC EQ Design Basis Assurance Inspection (DBAI)

09/14/2018

Work Orders

WO 00217201

Motor Operated Valve Actuator Rebuild

10/29/2006

WO 00356508

2B52-4245, Cat-1 MCCB Cleaning / Insp / Cycling

2/03/2010

WO 09902038

Replace Solenoid Valve at 14 Year Frequency per

Environmental Qualification Maintenance Requirement

(EQMR) Sheet for ASCO NP-1 Solenoid Valves

11/16/1999

WO 40111457

SMS-02020: Contactor & Thermal Overload Testing

WO 4020808801

2ICP 5.69B-Train B Residual Heat Removal Heat

Exchanger Valve and Controller Calibration

03/24/2014

WO 4020860601

2MS-2020; Radiograph for IST During Refueling Outage

10/06/2015

WO 40299706

1LT-427 / 1R35 Replace with New 3154 / 3159 Transmitter

10/15/2014

WO 40313480

Motor Operated Valve Checklist

10/16/2015

WO 40380291,01

Motor Operated Valve Actuator Checkout

10/13/2015

WO 4038029101

Lube Check at-the-Valve

10/16/2015

WO 40430808

2CC-00738B-O - Stem Clean & Lube

04/07/2017

WO 40472741

1LQ-427 Refurbish Power Supply

08/22/2017

WO 4052613801

IT-2015, Unit 2 Power Operated Relief Valve and Block

Valves (CSD), Task Required

11/19/2018

WO 40573499

1ICP 4.3-1 -- Pressurizer Level Transmitter Calibration

04/10/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

WO 893952

Pressurizer Press Power-Operated Relief Solenoid

09/27/1989

WO 9938675

Transducer will not Calibrate in Tolerance. Needs

Replacement.

04/23/2002